Rounds a number up, away from zero, to a certain precision.
ROUNDUP(number, places)
returns number rounded up (away from zero) to places decimal places. If places is omitted or zero, the function rounds up to an integer. If places is negative, the function rounds up to the next 10, 100, 1000, etc. This function rounds away from zero.
ROUNDUP(1.1111, 2)
returns 1.12
ROUNDUP(1.2345, 1)
returns 1.3
ROUNDUP(45.67, 0)
returns 46
ROUNDUP(-45.67)
returns -46
ROUNDUP(987.65, -2)
returns 1000
Calculating Materials for a Construction Project
Scenario: A construction company needs to order concrete bags for a new sidewalk project. The concrete is sold in bags that cover exactly 0.5 square meters. The company has calculated the total area of the sidewalk sections in square meters, and they need to determine the exact number of bags to order for each section.
Problem: Standard rounding might lead to ordering too few bags. For example, if a section requires 12.3 bags, rounding down to 12 would leave the company short. Even standard rounding to 12 would still be an underestimate. The company must always round up to ensure they have enough material to complete each section.
Solution: The ROUNDUP function is the perfect tool for this task. It rounds a number away from zero to the nearest specified multiple.
The formula would be: ROUNDUP(Area / Coverage_per_Bag, 0)
Data and Calculation
Below is a representation of the data and the results of the ROUNDUP function.
Sidewalk Section | Calculated Area (m2) | Bags Needed (Calculated) | ROUNDUP Formula | Bags to Order | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Main Path | 12.75 | 25.5 | ROUNDUP(12.75 / 0.5, 0) | 26 | |
2 | Side Walk A | 8.1 | 16.2 | ROUNDUP(8.1 / 0.5, 0) | 17 | |
3 | Side Walk B | 10.4 | 20.8 | ROUNDUP(10.4 / 0.5, 0) | 21 | |
4 | Front Entrance | 5 | 10 | ROUNDUP(5.0 / 0.5, 0) | 10 |
Explanation of the Results:
By using the ROUNDUP function, the construction company eliminates the risk of ordering insufficient materials, which would cause costly delays and additional shipping fees. This ensures that every project section has enough concrete to be completed on time.