High-Risk Crane Lift Clearance Permit

1. Crane Model, Load Weight and Pick/Placement Location Metadata

This permit is intended to document the planning and authorisation of critical crane lifts, including lifts approaching or exceeding 75% of rated capacity and tandem dual-crane maneuvers. Please record the information as accurately as possible. This template is a general planning aid and does not replace site-specific engineering review, manufacturer instructions, or applicable local requirements.


Permit reference number

Project or job site name

Site area, zone, or work front

Requesting company and site superintendent

Planned lift date

Planned lift start time


Planned lift completion time

Lift category


Crane 1 make and model

Crane 1 asset or serial identifier

Crane 1 rated capacity in the planned configuration (tonnes)

Crane 1 load share in the lift (tonnes)

Is a second crane participating in a tandem maneuver?


Crane 2 asset or serial identifier

Crane 2 rated capacity in the planned configuration (tonnes)

Crane 2 load share in the lift (tonnes)

Total suspended load weight including rigging and below-hook devices (tonnes)

Distance from the load centre of gravity to the pick point (m)

Load centre of gravity assessment method


Rigging attachment method to the load


Pick location description

Placement location description

Horizontal travel distance from pick to placement (m)

Vertical travel height of the load (m)

Number of planned crane repositioning steps during the lift

Load type


Do you have engineered drawings or a documented lift plan for this load?


Site factors affecting the pick or placement area


Sequence of operations and critical steps for this lift

Known hazards specific to this pick or placement

2. Boom Angle, Load Radius and Outrigger Soil Bearing Pressure Calculations

Record the geometry and ground conditions used to assess the planned configuration. Calculations shown here should be verified against the crane manufacturer's load chart for the exact configuration, and by a competent person where ground conditions or outrigger reactions are uncertain.


Crane 1 boom length (m)

Crane 1 boom angle from horizontal (degrees)


Crane 1 load radius from the centre of rotation (m)

Load moment relationship used in the verification table

M=Wร—RM = W \times R


Calculated load moment for Crane 1 (tonne-metres)

Crane 1 rated capacity at the planned radius (tonnes)

Crane 1 capacity utilisation at peak lift point (%)

Does any crane exceed 75% of rated capacity at any point in the lift cycle?


Crane 2 boom length (m)

Crane 2 boom angle from horizontal (degrees)


Crane 2 load radius from the centre of rotation (m)

Is the tandem lift controlled by a documented load-share and synchronisation plan?


Maximum permitted load share imbalance between the two cranes (%)

Capacity and Utilisation Verification

Lift configuration or phase

Boom length (m)

Load radius (m)

Rated capacity at radius (tonnes)

Actual load share (tonnes)

Capacity utilisation (%)

Crane 1 - initial hoist
42.50
18.00
12.40
10.20
82.3
Crane 1 - swing and set
42.50
21.00
10.10
10.20
101.0
Crane 2 - tandem partner
38.00
16.00
10.80
5.60
51.9
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 

Outrigger configuration for the planned setup


Outrigger pad or mat bearing area per leg (m2)

Bearing pressure relationship used for outrigger pads

p=FAp = \frac{F}{A}


Maximum calculated outrigger reaction force (kN)

Calculated ground bearing pressure under the outrigger (kPa)

Allowable soil bearing capacity at the setup location (kPa)

How was the allowable soil bearing capacity determined?


Is ground preparation, compaction, or improvement required before crane setup?


Ground reinforcement measures to be used under the outriggers


Are there underground voids, basements, tanks, or services within the outrigger influence zone?


Depth to the competent bearing layer below the setup surface (m)

Minimum clearance from outrigger pad edge to any excavation, trench, or edge (m)

Please upload the ground assessment, mat design, or outrigger calculation

Choose a file or drop it here
ย 

The physical outrigger setup has been checked against the planned configuration and marked on the ground

Notes on boom, radius, and ground bearing calculations

3. Section 3: Rigging Hardware Inspection, Tag Line Setup and Signal Person Assignment

Document the rigging gear, load control arrangements, and communication roles for the lift. Only hardware that is identifiable, in serviceable condition, and suited to the load should be recorded as approved for use.


Rigging hardware categories used in this lift


Rigging Hardware Inspection Register

Rigging item description

Type, size, or capacity class

Working load limit (tonnes)

Quantity in use

Last inspection date

Condition acceptable for use

Asset or serial identifier

Round sling
3 tonne endless synthetic
3.00
2
4/12/2026
RS-0142
Bow shackle
4.75 tonne screw pin
4.75
4
4/12/2026
SH-2210
Spreader beam
10 tonne rated, 4 m span
10.00
1
3/28/2026
SB-0088
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 

Has every rigging component been inspected within its required inspection interval?


Defects or removals identified during inspection


All damaged or suspect rigging has been removed from service and set aside for disposal or repair

Number of qualified riggers assigned to the lift

Tag line arrangement for load control


Tag line length (m)

Number of tag line handlers


Are tag line handlers positioned outside the potential fall or swing zone of the load?


Signal person arrangement


Primary signal person full name

Primary signal person competency or certification reference

Is a backup signal person designated and briefed?


Communication methods to be used during the lift


Has a pre-lift communication check been completed with all parties?


Lift director full name

Roles, responsibilities, and stop-work authority for the lift team

Pre-lift briefing notes for the lift team

All rigging hardware is tagged, traceable, and recorded in the register above

Will any person be positioned under or immediately beside the suspended load at any stage?


4. Section 4: Wind Speed Telematics, Overhead Obstruction and Egress Radius Check

Record the environmental and spatial checks carried out before the lift. Wind limits, obstruction clearances, and exclusion zone dimensions should reflect the crane manufacturer's guidance and the planned configuration for this specific lift.


Current sustained wind speed at lift height (km/h)

Current gust speed (km/h)

Wind monitoring source


Will continuous wind telematics monitoring run for the full duration of the lift?


Maximum wind speed permitted for the planned configuration (km/h)

Is there a documented procedure to suspend the lift if wind limits are exceeded?


Wind Reading Log

Reading time

Sustained wind speed (km/h)

Gust speed (km/h)

Reading location or height

Action taken

8:00 AM
12.4
18.2
Load height approx. 22 m
Within planned limit, lift continues
9:00 AM
19.6
27.8
Load height approx. 22 m
Approaching limit, load secured and monitored
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 

Are overhead obstructions present within the lift path or operating radius?


Minimum vertical clearance to the nearest overhead obstruction (m)

Obstruction and Clearance Register

Obstruction or feature

Horizontal distance from lift path (m)

Vertical clearance above load (m)

Control measure applied

Verified on site

Overhead power line
6.50
4.20
Dedicated spotter and boom swing limit marked
Scaffold edge, level 3
2.10
1.80
Section of scaffold removed before lift
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 
ย 

Exclusion zone controls to be applied


Egress or exclusion zone radius from the load swing path (m)

Have clear egress routes been identified for all personnel within the zone?


Number of people expected inside the exclusion zone during the lift

Will the lift take place in low-light or night conditions?


Conditions that will trigger an immediate stop of the lift


Minimum horizontal distance from the load to adjacent live operations or occupied structures (m)

The exclusion zone has been physically established and inspected before the lift begins

Additional environmental or obstruction notes

5. Section 5: Master Rigging Supervisor and Site EHS Director Joint Clearance Sign-Off

This section records the joint readiness review and clearance decision. Both reviewers should satisfy themselves that the recorded information is complete and that the planned controls are workable before signing. Where concerns remain, the lift should be deferred until the listed actions are closed out.


Pre-lift readiness review

Not ready

Needs improvement

Partially ready

Ready with minor actions

Fully ready

Lift plan and load data are complete and verified

Crane configuration matches the recorded calculations

Ground conditions and outrigger setup have been verified

Rigging hardware inspection is complete and documented

Communication and signal arrangements are confirmed

Wind and environmental limits are within the planned range

Exclusion zone and egress routes are established

All lift team members have been briefed on their roles

I confirm the information recorded in this permit is accurate and complete to the best of my knowledge

Master Rigging Supervisor full name

Master Rigging Supervisor company and role

Master Rigging Supervisor competency or certification reference

Date of supervisor review

Time of supervisor review


Master Rigging Supervisor signature

Site EHS Director full name

Site EHS Director company and role

Site EHS Director competency or certification reference

Date of EHS review

Time of EHS review


Site EHS Director signature

Joint clearance decision



Are hold points or re-inspection steps required before the lift proceeds?


Permit validity expiry date and time

Maximum permitted duration of the lift once started (hours)

Distribution of the signed permit


A copy of this permit is displayed at the lift control point

Is a post-lift review or debrief scheduled?


Post-lift observations, deviations from plan, and lessons learned

Final remarks from the joint sign-off review

What if we could make this form template even more effective and engaging? Curious to see how? Let's edit! ๐ŸŽฏ๐Ÿ˜Š Edit this High-Risk Critical Crane Lift Clearance Permit Form Template
Don't worry if this isn't perfect. You can easily build your own form like this with Zapof!
This form is protected by Google reCAPTCHA. Privacy - Terms.
ย 
Powered by Zapof