This permit is intended to document the planning and authorisation of critical crane lifts, including lifts approaching or exceeding 75% of rated capacity and tandem dual-crane maneuvers. Please record the information as accurately as possible. This template is a general planning aid and does not replace site-specific engineering review, manufacturer instructions, or applicable local requirements.
Permit reference number
Project or job site name
Site area, zone, or work front
Requesting company and site superintendent
Planned lift date
Planned lift start time
Planned lift completion time
Lift category
Single-crane lift above 75% of rated capacity
Tandem dual-crane maneuver
Multi-crane lift involving three or more units
Tandem lift above 75% of rated capacity
Other critical lift scenario
Crane 1 make and model
Crane 1 asset or serial identifier
Crane 1 rated capacity in the planned configuration (tonnes)
Crane 1 load share in the lift (tonnes)
Is a second crane participating in a tandem maneuver?
Crane 2 asset or serial identifier
Crane 2 rated capacity in the planned configuration (tonnes)
Crane 2 load share in the lift (tonnes)
Total suspended load weight including rigging and below-hook devices (tonnes)
Distance from the load centre of gravity to the pick point (m)
Load centre of gravity assessment method
Manufacturer data plate or documentation
Engineered drawing or model
Test lift or physical measurement
Estimate by a qualified rigger
Other method
Rigging attachment method to the load
Below-hook lifting device
Basket hitch
Choke hitch
Shackle and lug connection
Spreader beam or lifting beam
Other arrangement
Pick location description
Placement location description
Horizontal travel distance from pick to placement (m)
Vertical travel height of the load (m)
Number of planned crane repositioning steps during the lift
Load type
Structural steel member
Pre-cast concrete element
Mechanical or process equipment
Container or module
Pipe spool, ductwork, or cable drum
Personnel-carrying platform
Other load type
Do you have engineered drawings or a documented lift plan for this load?
Site factors affecting the pick or placement area
Congested work area
Live operations nearby
Overhead services or structures
Public or third-party access adjacent
Sloped or uneven ground
Limited egress or escape routes
Restricted working hours or noise windows
Other factor
Sequence of operations and critical steps for this lift
Known hazards specific to this pick or placement
Record the geometry and ground conditions used to assess the planned configuration. Calculations shown here should be verified against the crane manufacturer's load chart for the exact configuration, and by a competent person where ground conditions or outrigger reactions are uncertain.
Crane 1 boom length (m)
Crane 1 boom angle from horizontal (degrees)
Crane 1 load radius from the centre of rotation (m)
Load moment relationship used in the verification table
Calculated load moment for Crane 1 (tonne-metres)
Crane 1 rated capacity at the planned radius (tonnes)
Crane 1 capacity utilisation at peak lift point (%)
Does any crane exceed 75% of rated capacity at any point in the lift cycle?
Crane 2 boom length (m)
Crane 2 boom angle from horizontal (degrees)
Crane 2 load radius from the centre of rotation (m)
Is the tandem lift controlled by a documented load-share and synchronisation plan?
Maximum permitted load share imbalance between the two cranes (%)
Capacity and Utilisation Verification
Lift configuration or phase | Boom length (m) | Load radius (m) | Rated capacity at radius (tonnes) | Actual load share (tonnes) | Capacity utilisation (%) | |
|---|---|---|---|---|---|---|
Crane 1 - initial hoist | 42.50 | 18.00 | 12.40 | 10.20 | 82.3 | |
Crane 1 - swing and set | 42.50 | 21.00 | 10.10 | 10.20 | 101.0 | |
Crane 2 - tandem partner | 38.00 | 16.00 | 10.80 | 5.60 | 51.9 | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | ย |
Outrigger configuration for the planned setup
Fully extended outriggers
Partially extended outriggers
Mid-outrigger or reduced position
Crawler or track mounted with no outriggers
Other configuration
Outrigger pad or mat bearing area per leg (m2)
Bearing pressure relationship used for outrigger pads
Maximum calculated outrigger reaction force (kN)
Calculated ground bearing pressure under the outrigger (kPa)
Allowable soil bearing capacity at the setup location (kPa)
How was the allowable soil bearing capacity determined?
Geotechnical investigation report
Field bearing test
Assessment by a competent engineer
Manufacturer or supplier guidance
Estimate based on surface observation
Other basis
Is ground preparation, compaction, or improvement required before crane setup?
Ground reinforcement measures to be used under the outriggers
Timber crane mats
Steel spreader plates
Concrete slab or pad
Piled or driven supports
Compacted fill
Ground improvement treatment
None required
Other measure
Are there underground voids, basements, tanks, or services within the outrigger influence zone?
Depth to the competent bearing layer below the setup surface (m)
Minimum clearance from outrigger pad edge to any excavation, trench, or edge (m)
Please upload the ground assessment, mat design, or outrigger calculation
The physical outrigger setup has been checked against the planned configuration and marked on the ground
Notes on boom, radius, and ground bearing calculations
Document the rigging gear, load control arrangements, and communication roles for the lift. Only hardware that is identifiable, in serviceable condition, and suited to the load should be recorded as approved for use.
Rigging hardware categories used in this lift
Wire rope slings
Chain slings
Synthetic web or round slings
Shackles and connecting links
Eyebolts and engineered lifting points
Spreader beam
Lifting beam
Below-hook lifting device
Vacuum or magnetic lifter
Other hardware
Rigging Hardware Inspection Register
Rigging item description | Type, size, or capacity class | Working load limit (tonnes) | Quantity in use | Last inspection date | Condition acceptable for use | Asset or serial identifier | |
|---|---|---|---|---|---|---|---|
Round sling | 3 tonne endless synthetic | 3.00 | 2 | 4/12/2026 | RS-0142 | ||
Bow shackle | 4.75 tonne screw pin | 4.75 | 4 | 4/12/2026 | SH-2210 | ||
Spreader beam | 10 tonne rated, 4 m span | 10.00 | 1 | 3/28/2026 | SB-0088 | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย | ||
ย | ย | ย | ย | ย | ย |
Has every rigging component been inspected within its required inspection interval?
Defects or removals identified during inspection
Broken or damaged wires
Corrosion or pitting
Deformation or distortion
Missing or illegible identification tags
Worn or damaged fittings
Heat or arc damage
No defects found
Other finding
All damaged or suspect rigging has been removed from service and set aside for disposal or repair
Number of qualified riggers assigned to the lift
Tag line arrangement for load control
Single tag line
Multiple tag lines
Tag line with remote or mechanical handler
No tag line used
Other arrangement
Tag line length (m)
Number of tag line handlers
Are tag line handlers positioned outside the potential fall or swing zone of the load?
Signal person arrangement
One dedicated signal person
Two signal persons with relay
Signal person plus lift director in contact
Hand signals only
Radio communication only
Combined hand signals and radio
Other arrangement
Primary signal person full name
Primary signal person competency or certification reference
Is a backup signal person designated and briefed?
Communication methods to be used during the lift
Two-way radio
Standardised hand signals
Whistle or audible signals
Visual flags or lights
Digital or telematics messaging
Other method
Has a pre-lift communication check been completed with all parties?
Lift director full name
Roles, responsibilities, and stop-work authority for the lift team
Pre-lift briefing notes for the lift team
All rigging hardware is tagged, traceable, and recorded in the register above
Will any person be positioned under or immediately beside the suspended load at any stage?
Record the environmental and spatial checks carried out before the lift. Wind limits, obstruction clearances, and exclusion zone dimensions should reflect the crane manufacturer's guidance and the planned configuration for this specific lift.
Current sustained wind speed at lift height (km/h)
Current gust speed (km/h)
Wind monitoring source
Handheld anemometer
Crane-mounted wind telematics
On-site weather station
Forecast or weather service data
Visual estimation only
Other source
Will continuous wind telematics monitoring run for the full duration of the lift?
Maximum wind speed permitted for the planned configuration (km/h)
Is there a documented procedure to suspend the lift if wind limits are exceeded?
Wind Reading Log
Reading time | Sustained wind speed (km/h) | Gust speed (km/h) | Reading location or height | Action taken | |
|---|---|---|---|---|---|
8:00 AM | 12.4 | 18.2 | Load height approx. 22 m | Within planned limit, lift continues | |
9:00 AM | 19.6 | 27.8 | Load height approx. 22 m | Approaching limit, load secured and monitored | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย | |
ย | ย | ย | ย | ย |
Are overhead obstructions present within the lift path or operating radius?
Minimum vertical clearance to the nearest overhead obstruction (m)
Obstruction and Clearance Register
Obstruction or feature | Horizontal distance from lift path (m) | Vertical clearance above load (m) | Control measure applied | Verified on site | |
|---|---|---|---|---|---|
Overhead power line | 6.50 | 4.20 | Dedicated spotter and boom swing limit marked | ||
Scaffold edge, level 3 | 2.10 | 1.80 | Section of scaffold removed before lift | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย | ||
ย | ย | ย | ย |
Exclusion zone controls to be applied
Physical barriers or fencing
Warning signage
Dedicated spotter or banksman
Access control or entry permit for the zone
Temporary suspension of adjacent work
Public route diversion
Other control
Egress or exclusion zone radius from the load swing path (m)
Have clear egress routes been identified for all personnel within the zone?
Number of people expected inside the exclusion zone during the lift
Will the lift take place in low-light or night conditions?
Conditions that will trigger an immediate stop of the lift
Wind or gusts above the permitted limit
Lightning in the area
Reduced visibility such as fog, dust, or heavy rain
Ice, snow, or slippery surfaces
Unexpected ground movement or settlement
Loss of communication with the signal person
Other trigger
Minimum horizontal distance from the load to adjacent live operations or occupied structures (m)
The exclusion zone has been physically established and inspected before the lift begins
Additional environmental or obstruction notes
This section records the joint readiness review and clearance decision. Both reviewers should satisfy themselves that the recorded information is complete and that the planned controls are workable before signing. Where concerns remain, the lift should be deferred until the listed actions are closed out.
Pre-lift readiness review
Not ready | Needs improvement | Partially ready | Ready with minor actions | Fully ready | |
|---|---|---|---|---|---|
Lift plan and load data are complete and verified | |||||
Crane configuration matches the recorded calculations | |||||
Ground conditions and outrigger setup have been verified | |||||
Rigging hardware inspection is complete and documented | |||||
Communication and signal arrangements are confirmed | |||||
Wind and environmental limits are within the planned range | |||||
Exclusion zone and egress routes are established | |||||
All lift team members have been briefed on their roles |
I confirm the information recorded in this permit is accurate and complete to the best of my knowledge
Master Rigging Supervisor full name
Master Rigging Supervisor company and role
Master Rigging Supervisor competency or certification reference
Date of supervisor review
Time of supervisor review
Master Rigging Supervisor signature
Site EHS Director full name
Site EHS Director company and role
Site EHS Director competency or certification reference
Date of EHS review
Time of EHS review
Site EHS Director signature
Joint clearance decision
Approved to proceed as planned
Approved with additional conditions
Deferred pending corrective actions
Not approved
Are hold points or re-inspection steps required before the lift proceeds?
Permit validity expiry date and time
Maximum permitted duration of the lift once started (hours)
Distribution of the signed permit
Crane operator or operators
Lift director
Signal persons
Rigging crew
Site supervision
Site EHS team
Client or third-party representative
Other recipient
A copy of this permit is displayed at the lift control point
Is a post-lift review or debrief scheduled?
Post-lift observations, deviations from plan, and lessons learned
Final remarks from the joint sign-off review