1. Crane Model, Load Weight and Pick/Placement Location Metadata

This permit is intended to document the planning and authorisation of critical crane lifts, including lifts approaching or exceeding 75% of rated capacity and tandem dual-crane maneuvers. Please record the information as accurately as possible. This template is a general planning aid and does not replace site-specific engineering review, manufacturer instructions, or applicable local requirements.

 

Permit reference number

Project or job site name

Site area, zone, or work front

Requesting company and site superintendent

Planned lift date

Planned lift start time

Planned lift completion time

Lift category

 

Please describe the lift scenario and why it is considered critical:

Crane 1 make and model

Crane 1 asset or serial identifier

Crane 1 rated capacity in the planned configuration (tonnes)

Crane 1 load share in the lift (tonnes)

Is a second crane participating in a tandem maneuver?

 

Crane 2 make and model

Crane 2 asset or serial identifier

Crane 2 rated capacity in the planned configuration (tonnes)

Crane 2 load share in the lift (tonnes)

Total suspended load weight including rigging and below-hook devices (tonnes)

Distance from the load centre of gravity to the pick point (m)

Load centre of gravity assessment method

 

Please describe the method used to estimate the centre of gravity:

Rigging attachment method to the load

 

Please describe the rigging attachment arrangement:

Pick location description

Placement location description

Horizontal travel distance from pick to placement (m)

Vertical travel height of the load (m)

Number of planned crane repositioning steps during the lift

Load type

 

Please describe the load type:

Do you have engineered drawings or a documented lift plan for this load?

 

Please upload the engineered drawings or lift plan

Choose a file or drop it here
 

Site factors affecting the pick or placement area

 

Please describe the other site factor and its effect on the lift:

Sequence of operations and critical steps for this lift

Known hazards specific to this pick or placement

2. Boom Angle, Load Radius and Outrigger Soil Bearing Pressure Calculations

Record the geometry and ground conditions used to assess the planned configuration. Calculations shown here should be verified against the crane manufacturer's load chart for the exact configuration, and by a competent person where ground conditions or outrigger reactions are uncertain.

 

Crane 1 boom length (m)

Crane 1 boom angle from horizontal (degrees)

Crane 1 load radius from the centre of rotation (m)

Load moment relationship used in the verification table

M=W×RM = W \times R

 

Calculated load moment for Crane 1 (tonne-metres)

Crane 1 rated capacity at the planned radius (tonnes)

Crane 1 capacity utilisation at peak lift point (%)

Does any crane exceed 75% of rated capacity at any point in the lift cycle?

 

Please describe the configuration, radius, and expected duration at peak utilisation:

Crane 2 boom length (m)

Crane 2 boom angle from horizontal (degrees)

Crane 2 load radius from the centre of rotation (m)

Is the tandem lift controlled by a documented load-share and synchronisation plan?

 

Please upload the load-share or synchronisation plan

Choose a file or drop it here
 

Maximum permitted load share imbalance between the two cranes (%)

Capacity and Utilisation Verification

Lift configuration or phase

Boom length (m)

Load radius (m)

Rated capacity at radius (tonnes)

Actual load share (tonnes)

Capacity utilisation (%)

A
B
C
D
E
F
1
Crane 1 - initial hoist
42.50
18.00
12.40
10.20
82.3
2
Crane 1 - swing and set
42.50
21.00
10.10
10.20
101.0
3
Crane 2 - tandem partner
38.00
16.00
10.80
5.60
51.9
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Outrigger configuration for the planned setup

 

Please describe the outrigger configuration:

Outrigger pad or mat bearing area per leg (m2)

Bearing pressure relationship used for outrigger pads

p=FAp = \frac{F}{A}

 

Maximum calculated outrigger reaction force (kN)

Calculated ground bearing pressure under the outrigger (kPa)

Allowable soil bearing capacity at the setup location (kPa)

How was the allowable soil bearing capacity determined?

 

Please describe the basis of the estimate and any assumptions made:

Is ground preparation, compaction, or improvement required before crane setup?

 

Please describe the preparation work and how completion will be verified:

Ground reinforcement measures to be used under the outriggers

 

Please describe the other ground reinforcement measure:

Are there underground voids, basements, tanks, or services within the outrigger influence zone?

 

Please describe the location, depth, and the measures used to protect or avoid them:

Depth to the competent bearing layer below the setup surface (m)

Minimum clearance from outrigger pad edge to any excavation, trench, or edge (m)

Please upload the ground assessment, mat design, or outrigger calculation

Choose a file or drop it here
 

The physical outrigger setup has been checked against the planned configuration and marked on the ground

Notes on boom, radius, and ground bearing calculations

3. Section 3: Rigging Hardware Inspection, Tag Line Setup and Signal Person Assignment

Document the rigging gear, load control arrangements, and communication roles for the lift. Only hardware that is identifiable, in serviceable condition, and suited to the load should be recorded as approved for use.

 

Rigging hardware categories used in this lift

 

Please describe the other rigging hardware:

Rigging Hardware Inspection Register

Rigging item description

Type, size, or capacity class

Working load limit (tonnes)

Quantity in use

Last inspection date

Condition acceptable for use

Asset or serial identifier

A
B
C
D
E
F
G
1
Round sling
3 tonne endless synthetic
3.00
2
4/12/2026
RS-0142
2
Bow shackle
4.75 tonne screw pin
4.75
4
4/12/2026
SH-2210
3
Spreader beam
10 tonne rated, 4 m span
10.00
1
3/28/2026
SB-0088
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Has every rigging component been inspected within its required inspection interval?

 

Date of the most recent inspection

Defects or removals identified during inspection

 

Please describe the other finding and the action taken:

All damaged or suspect rigging has been removed from service and set aside for disposal or repair

Number of qualified riggers assigned to the lift

Tag line arrangement for load control

 

Please explain why no tag line is used and describe the alternative load control measures:

Tag line length (m)

Number of tag line handlers

Are tag line handlers positioned outside the potential fall or swing zone of the load?

 

Please confirm the stand-off distance applied

Signal person arrangement

 

Please describe the signal person arrangement:

Primary signal person full name

Primary signal person competency or certification reference

Is a backup signal person designated and briefed?

 

Backup signal person full name

Communication methods to be used during the lift

 

Please describe the other communication method:

Has a pre-lift communication check been completed with all parties?

 

Time the communication check was completed

Lift director full name

Roles, responsibilities, and stop-work authority for the lift team

Pre-lift briefing notes for the lift team

All rigging hardware is tagged, traceable, and recorded in the register above

Will any person be positioned under or immediately beside the suspended load at any stage?

 

Please describe the exposure and the measures used to reduce it:

4. Section 4: Wind Speed Telematics, Overhead Obstruction and Egress Radius Check

Record the environmental and spatial checks carried out before the lift. Wind limits, obstruction clearances, and exclusion zone dimensions should reflect the crane manufacturer's guidance and the planned configuration for this specific lift.

 

Current sustained wind speed at lift height (km/h)

Current gust speed (km/h)

Wind monitoring source

 

Please describe the other wind monitoring source:

Will continuous wind telematics monitoring run for the full duration of the lift?

 

Monitoring device or system identifier

Maximum wind speed permitted for the planned configuration (km/h)

Is there a documented procedure to suspend the lift if wind limits are exceeded?

 

Please describe the suspension, securing, and restart procedure:

Wind Reading Log

Reading time

Sustained wind speed (km/h)

Gust speed (km/h)

Reading location or height

Action taken

A
B
C
D
E
1
8:00 AM
12.4
18.2
Load height approx. 22 m
Within planned limit, lift continues
2
9:00 AM
19.6
27.8
Load height approx. 22 m
Approaching limit, load secured and monitored
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Are overhead obstructions present within the lift path or operating radius?

 

Types of overhead obstructions present

 

Please describe the other overhead obstruction:

Minimum vertical clearance to the nearest overhead obstruction (m)

Obstruction and Clearance Register

Obstruction or feature

Horizontal distance from lift path (m)

Vertical clearance above load (m)

Control measure applied

Verified on site

A
B
C
D
E
1
Overhead power line
6.50
4.20
Dedicated spotter and boom swing limit marked
2
Scaffold edge, level 3
2.10
1.80
Section of scaffold removed before lift
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Exclusion zone controls to be applied

 

Please describe the other exclusion zone control:

Egress or exclusion zone radius from the load swing path (m)

Have clear egress routes been identified for all personnel within the zone?

 

Please describe the egress routes and how they are kept clear during the lift:

Number of people expected inside the exclusion zone during the lift

Will the lift take place in low-light or night conditions?

 

Lighting measures provided

Conditions that will trigger an immediate stop of the lift

 

Please describe the other stop trigger:

Minimum horizontal distance from the load to adjacent live operations or occupied structures (m)

The exclusion zone has been physically established and inspected before the lift begins

Additional environmental or obstruction notes

5. Section 5: Master Rigging Supervisor and Site EHS Director Joint Clearance Sign-Off

This section records the joint readiness review and clearance decision. Both reviewers should satisfy themselves that the recorded information is complete and that the planned controls are workable before signing. Where concerns remain, the lift should be deferred until the listed actions are closed out.

 

Pre-lift readiness review

Not ready

Needs improvement

Partially ready

Ready with minor actions

Fully ready

Lift plan and load data are complete and verified

Crane configuration matches the recorded calculations

Ground conditions and outrigger setup have been verified

Rigging hardware inspection is complete and documented

Communication and signal arrangements are confirmed

Wind and environmental limits are within the planned range

Exclusion zone and egress routes are established

All lift team members have been briefed on their roles

I confirm the information recorded in this permit is accurate and complete to the best of my knowledge

Master Rigging Supervisor full name

Master Rigging Supervisor company and role

Master Rigging Supervisor competency or certification reference

Date of supervisor review

Time of supervisor review

Master Rigging Supervisor signature

Site EHS Director full name

Site EHS Director company and role

Site EHS Director competency or certification reference

Date of EHS review

Time of EHS review

Site EHS Director signature

Joint clearance decision

 

Please list the additional conditions attached to this clearance:

 

Please list the corrective actions required before the permit is re-submitted:

 

Please describe the reasons for not approving this lift:

Are hold points or re-inspection steps required before the lift proceeds?

 

Please describe each hold point and who authorises its release:

Permit validity expiry date and time

Maximum permitted duration of the lift once started (hours)

Distribution of the signed permit

 

Please name the other recipient:

A copy of this permit is displayed at the lift control point

Is a post-lift review or debrief scheduled?

 

Date of the post-lift review

Post-lift observations, deviations from plan, and lessons learned

Final remarks from the joint sign-off review

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.