Complete every field as accurately as possible. This permit records the planned arrangement for a high-risk crane lift and supports review by the relevant competent persons on site. It does not replace site-specific procedures, manufacturer instructions, or any obligations that apply at your location.
Permit reference number
Date of request
Planned lift date and start time
Planned lift completion time
Project, work order or job reference
Site, facility or work area name and location
Requesting organisation or contractor
Requested by (full name and position)
Contact number and radio call sign
How would you classify this lift?
Routine lift (standard, repeated, well-established method)
Planned non-routine lift (unusual but not classified as critical)
Critical or high-risk lift (detailed engineered plan required)
Trial, proof or load-test lift
Is this lift a repeat of a previously approved lift plan?
Describe the operation in enough detail that an independent reviewer could picture the lift from start to finish.
Describe the lift operation in detail
What is the objective or purpose of this lift?
Primary lifting equipment type
Mobile telescopic crane
Crawler or lattice-boom crane
Tower crane
Overhead travelling or gantry crane
Pedestal, deck or ship-mounted crane
Forklift used as a lifting machine
Other lifting device (please describe)
Lift method
Single crane lift
Tandem lift (two cranes sharing the load)
Multi-crane lift (three or more cranes)
Crane assisted by a tailing device or secondary machine
Crane with a lifting beam, spreader or davit
Will any person be elevated by, or work from, the load or a lifting attachment during the operation?
Special characteristics of this lift (select all that apply)
Blind or obstructed lift
Lift outside the crane's normal operating radius
Lift over live services or operating plant
Restricted headroom or overhead obstruction
Night-time or low-light lift
Highly wind-exposed location
Lift near water, edges or open excavations
Awkward, fragile or unusually shaped load
Time-critical or shutdown-window lift
None of the above
Record every machine and accessory taking part in the lift. Utilisation is calculated automatically from rated capacity and planned load weight.
Lifting equipment inventory and capacity utilisation
Equipment description | Identification or serial number | Rated capacity at planned radius (t) | Planned load share (t) | Utilisation of rated capacity (%) | Inspection current? | |
|---|---|---|---|---|---|---|
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 | ||||||
0.0 |
Crane owner, hire company or fleet provider
Crane configuration (boom length, jib, counterweight, reeving, outrigger extension)
Date of most recent thorough or structural examination
Date of most recent function and safety-device test
Is the crane fitted with a working load indicator or moment limiting device?
Rigging and lifting accessories to be used (select all that apply)
Wire rope slings
Chain slings
Synthetic web or round slings
Shackles and lifting eyes
Spreader beam
Lifting beam
Davit or lifting arm
Magnets or vacuum lifters
Other accessory (please describe)
Number of rigging legs or parts of line supporting the load
Stated working load limit of the rigging arrangement (t)
Are all lifting accessories within their inspection period and clearly marked with a working load limit?
Load description
Total load weight including all rigging below the hook (t)
Load length (m)
Load width (m)
Load height (m)
Location of the centre of gravity relative to the lifting points
Is the load weight confirmed from certified or manufacturer documentation?
Load condition or behaviour
Rigid and stable
Flexible or prone to swinging
Articulated or hinged (may shift during the lift)
Contains liquid or loose material
Hot, cold or thermally sensitive
Fragile or easily damaged
Does the load contain hazardous substances or stored energy?
Describe the lifting points, attachment method and any tag-line arrangements
Is a secondary retention or backup attachment required for the load?
Ground and setup information supports review of stability. Where values are unknown, state how they will be established before the lift begins.
Ground or supporting surface type at the crane setup position (select all that apply)
Prepared concrete pad or hardstanding
Compacted engineered fill
Asphalt or road surface
Timber or composite mats
Structural slab or suspended deck
Unmade or natural ground
Other (please describe)
Available ground bearing capacity (kPa)
Has a ground bearing pressure assessment or confirmation been completed?
Are outrigger mats, spreader plates or additional support required?
Is the crane set up on, beside or over an excavation, void, tunnel, buried service or undermined area?
Planned operating radius from crane centre (m)
Planned boom or jib length (m)
Planned hook height above ground (m)
Planned maximum boom angle (degrees)
Does the planned configuration remain within the crane's rated capacity chart at every point of the lift?
Load moment is commonly estimated as weight multiplied by radius. Use this only as a planning aid and verify against the crane's own documentation.
Load moment (weight × operating radius) is a simplified planning calculation only. It does not establish safe lifting capacity or replace verification against the manufacturer's load charts, approved crane configuration and applicable engineering assessments.
Break the lift into discrete steps. The load moment column is calculated automatically as weight multiplied by radius for each step.
Planned lift sequence and load moment
Calculated load moment is an indicative planning value only. Each lift stage must be independently checked against the applicable crane load chart and approved lifting configuration by a competent reviewer.
Step number | Description of the step | Load weight (t) | Radius (m) | Load moment (t.m) | Reviewed by supervisor? | |
|---|---|---|---|---|---|---|
1 | Rig and hoist load 300 mm clear of the trailer, hold for stability check | 12.00 | 9.00 | 108.00 | ||
2 | Slew load clear of the trailer and any personnel | 12.00 | 12.00 | 144.00 | ||
3 | Lower and land the load onto the prepared plinth | 12.00 | 11.00 | 132.00 | ||
0.00 | ||||||
0.00 | ||||||
0.00 | ||||||
0.00 | ||||||
0.00 | ||||||
0.00 | ||||||
0.00 |
Describe the full step-by-step lift sequence in narrative form
Planned load path
Vertical hoist and lower only
Vertical hoist followed by slew
Luffing or boom adjustment during the lift
Load travelled or carried by the crane
Combination of the above (please describe below)
Will the crane travel or carry the load over any distance?
Is a trial lift at low height required before the main lift?
Estimated total lift duration (hours)
Number of individual hoists planned
Describe the landing area preparation and how the load will be secured once landed
List everyone taking a defined role in the lift. Competency information should reflect whatever evidence is normally held at your site or organisation.
Lift team roster
Full name | Role in the lift | Competency or certification reference | Certification expiry date | Fit for duty today? | |
|---|---|---|---|---|---|
Appointed lift supervisor or lift director (full name)
Primary crane operator (full name)
Signaller or banksman (full name)
Rigger or slinger (full name)
Total number of people involved in or supporting the lift
Has a pre-lift briefing or toolbox talk been scheduled?
Which roles require additional authorisation or specialist input? (select all that apply)
Man-riding basket operator
Personnel working at height during the lift
Diver or water-side operations
Signal person working out of the operator's view
Specialist engineer for an engineered lift
None of the above
Are all team members familiar with the site's emergency and evacuation arrangements?
Has any team member reported fatigue, illness, medication effects or impairment that could affect safe performance?
Forecast or measured wind speed at lift time (km/h)
Maximum wind speed permitted for this lift by the equipment documentation (km/h)
Will the lift proceed if wind speeds approach or exceed the stated limit?
Weather or environmental factors of concern (select all that apply)
Rain or wet surfaces
Lightning risk
Snow, ice or frost
Fog or restricted visibility
High ambient temperature or heat stress risk
Cold exposure
Darkness or poor lighting
Dust, sand or airborne debris
Noise affecting communication
None of the above
Expected lighting conditions
Full daylight
Dawn or dusk
Artificial lighting provided
Night-time operation
Variable or intermittent lighting
Ambient temperature at lift time (degrees Celsius)
Are there overhead or underground services within the crane's operating radius?
Minimum planned clearance to the nearest service or obstruction (m)
Is there public access, occupied buildings or active work areas within the potential drop zone?
Will other work continue in the vicinity during the lift?
Will a formal exclusion zone be established around the lift area?
Planned exclusion zone radius or minimum distance from the load (m)
Communication methods to be used (select all that apply)
Two-way radio
Agreed hand signals
Mobile telephone
Wired intercom or onboard system
Air horn or audible alarm
Other (please describe)
Is a dedicated signaller required for the entire lift?
Is any part of the lift blind, meaning the operator cannot see the load or the landing point?
Describe traffic management, pedestrian routing and any road or access closures required
Is a standby or safety observer required to watch for unauthorised entry?
Rate each hazard for likelihood and severity using the 1 to 5 scales provided. Ratings support discussion and prioritisation; they are not a substitute for your organisation's own assessment method.
Likelihood rating for each identified hazard (1 = very unlikely, 5 = very likely)
Load or part of the load falls | |
Crane overturns or becomes unstable | |
Contact with overhead or underground services | |
Ground failure beneath the crane or outrigger | |
Person struck by swinging or moving load | |
Rigging or lifting accessory failure | |
Adverse weather interrupts or destabilises the lift | |
Communication failure between team members | |
Unauthorised person enters the exclusion zone |
Severity rating for each identified hazard (1 = minor, 5 = catastrophic)
Load or part of the load falls | |
Crane overturns or becomes unstable | |
Contact with overhead or underground services | |
Ground failure beneath the crane or outrigger | |
Person struck by swinging or moving load | |
Rigging or lifting accessory failure | |
Adverse weather interrupts or destabilises the lift | |
Communication failure between team members | |
Unauthorised person enters the exclusion zone |
Control measures to be applied (select all that apply)
Physical barriers and signage
Exclusion of all non-essential personnel
Tag lines to control load swing
Secondary retention or backup attachment
Dedicated standby person or spotter
Wind and weather monitoring with stop-work triggers
Additional permits or isolation of services
Rehearsal or walk-through before the lift
Reduced load or split lift into smaller lifts
Other (please describe)
Has the residual risk been assessed against the organisation's approved risk acceptance criteria, and are any additional controls required?
Yes — residual risk is within acceptable limits
No — residual risk exceeds acceptable limits
Further assessment required
What additional controls or corrective actions are required before the lift can proceed?
Have residual risks been reviewed and accepted by a competent person?
List any residual concerns, assumptions or conditions attached to this assessment
Emergency scenarios planned for (select all that apply)
Crane or structural failure
Load swing, snag or uncontrolled movement
Contact with live services
Medical emergency or injury
Fire or spill
Sudden weather deterioration
Loss of power or control
Ground collapse or subsidence
Other (please describe)
Is an emergency rescue plan required for persons working at height or in a man-riding basket?
Emergency contact name and number
Nearest first aid point or medical facility and its location
Will trained first aiders be present on site throughout the lift?
Is firefighting or spill-response equipment required to be on standby?
State the abort criteria and stop-work triggers for this lift
Does every team member have the authority to stop the lift without seeking approval?
Which documents are attached or available on site? (select all that apply)
Detailed lift plan or engineered lift study
Crane load chart for the planned configuration
Lifting accessory certificates and inspection records
Ground bearing pressure assessment
Site drawing or lift route layout
Task risk assessment
Manufacturer instructions for the load or lifting device
Communication plan or signal chart
Other (please describe)
Upload the lift plan or supporting documents
Upload a rigging sketch, site photo or lift route layout
Drawing, sketch or document reference numbers
Are all attachments current, legible and available to the lift team on the day?
By signing below, each person confirms they have reviewed the information relevant to their role. Any change to the load, crane configuration, weather, ground conditions or personnel requires the lift to be paused and this permit to be reviewed again.
I confirm that the information recorded in this permit is accurate and complete to the best of my knowledge
I understand that the lift must stop if conditions change or if any stop-work trigger is reached
I confirm that the lift team has been briefed on the plan, the hazards and the emergency arrangements
Additional conditions, restrictions or comments attached to this permit
Review outcome
Approved — no further conditions
Approved with conditions (state below)
Deferred — further information required (state below)
Rejected — not acceptable in the proposed form (state below)
Approval records the outcome of the designated site review. It does not independently establish regulatory compliance or replace applicable permits, engineering approvals, site procedures or other required authorisations.
Name of the person requesting the permit
Signature of the person requesting the permit
Name of the lift supervisor or competent reviewer
Signature of the lift supervisor or competent reviewer
Name of the site representative or permit issuer
Signature of the site representative or permit issuer
Date of authorisation
Permit valid from
Permit valid until
Has a close-out or post-lift review been scheduled?