High-Risk Crane Lift Clearance Permit — Plan, Review and Authorisation

1. Permit Identification and Request Details

Complete every field as accurately as possible. This permit records the planned arrangement for a high-risk crane lift and supports review by the relevant competent persons on site. It does not replace site-specific procedures, manufacturer instructions, or any obligations that apply at your location.

 

Permit reference number

Date of request

Planned lift date and start time

Planned lift completion time

Project, work order or job reference

Site, facility or work area name and location

Requesting organisation or contractor

Requested by (full name and position)

Contact number and radio call sign

How would you classify this lift?

 

Which factors make this a critical or high-risk lift? (select all that apply)

 

Please describe the additional critical factor:

Is this lift a repeat of a previously approved lift plan?

 

Reference number of the previously approved permit or plan

 

Briefly explain what makes this lift different from previous work

2. Lift Scope, Method and Description

Describe the operation in enough detail that an independent reviewer could picture the lift from start to finish.

 

Describe the lift operation in detail

What is the objective or purpose of this lift?

Primary lifting equipment type

 

Please describe the lifting device:

Lift method

 

Describe the load-sharing arrangement, sequencing and communication between crane operators

 

Describe the role of each crane and the person coordinating the multi-crane lift

Will any person be elevated by, or work from, the load or a lifting attachment during the operation?

 

What arrangement is planned? (select all that apply)

 

Please describe the arrangement and the controls applied:

Special characteristics of this lift (select all that apply)

3. Crane, Lifting Equipment and Accessories

Record every machine and accessory taking part in the lift. Utilisation is calculated automatically from rated capacity and planned load weight.

 

Lifting equipment inventory and capacity utilisation

Equipment description

Identification or serial number

Rated capacity at planned radius (t)

Planned load share (t)

Utilisation of rated capacity (%)

Inspection current?

A
B
C
D
E
F
1
 
 
 
 
0.0
2
 
 
 
 
0.0
3
 
 
 
 
0.0
4
 
 
 
 
0.0
5
 
 
 
 
0.0
6
 
 
 
 
0.0
7
 
 
 
 
0.0
8
 
 
 
 
0.0
9
 
 
 
 
0.0
10
 
 
 
 
0.0

Crane owner, hire company or fleet provider

Crane configuration (boom length, jib, counterweight, reeving, outrigger extension)

Date of most recent thorough or structural examination

Date of most recent function and safety-device test

Is the crane fitted with a working load indicator or moment limiting device?

 

Date of most recent calibration or verification of that device

 

Explain how load monitoring will be achieved without the device

Rigging and lifting accessories to be used (select all that apply)

 

Please describe the accessory and its stated working load limit:

Number of rigging legs or parts of line supporting the load

Stated working load limit of the rigging arrangement (t)

Are all lifting accessories within their inspection period and clearly marked with a working load limit?

 

Who verified the accessories and on what date?

 

Describe the deficiency and the corrective action required before the lift proceeds

4. Load Details and Weight Verification

Load description

Total load weight including all rigging below the hook (t)

Load length (m)

Load width (m)

Load height (m)

Location of the centre of gravity relative to the lifting points

Is the load weight confirmed from certified or manufacturer documentation?

 

Document reference or certificate number

 

How was the load weight determined?

Load condition or behaviour

Does the load contain hazardous substances or stored energy?

 

Which hazards may be present? (select all that apply)

 

Please describe the hazard and the controls in place:

Describe the lifting points, attachment method and any tag-line arrangements

Is a secondary retention or backup attachment required for the load?

5. Ground Conditions, Crane Setup and Operating Envelope

Ground and setup information supports review of stability. Where values are unknown, state how they will be established before the lift begins.

 

Ground or supporting surface type at the crane setup position (select all that apply)

 

Please describe the surface:

Available ground bearing capacity (kPa)

Has a ground bearing pressure assessment or confirmation been completed?

 

Assessment reference and who completed it

 

Explain how ground suitability will be confirmed before setup

Are outrigger mats, spreader plates or additional support required?

 

Type, size and arrangement of mats or plates

Is the crane set up on, beside or over an excavation, void, tunnel, buried service or undermined area?

 

Describe the feature, its distance from the crane and the protective measures applied

Planned operating radius from crane centre (m)

Planned boom or jib length (m)

Planned hook height above ground (m)

Planned maximum boom angle (degrees)

Does the planned configuration remain within the crane's rated capacity chart at every point of the lift?

 

Who checked the load chart and on what date?

 

Describe the exceedance and the revised arrangement proposed to bring the lift within capacity

 

Load moment is commonly estimated as weight multiplied by radius. Use this only as a planning aid and verify against the crane's own documentation.

M=W×rM = W \times r

 

Load moment (weight × operating radius) is a simplified planning calculation only. It does not establish safe lifting capacity or replace verification against the manufacturer's load charts, approved crane configuration and applicable engineering assessments.

6. Lift Sequence and Load Moment Check

Break the lift into discrete steps. The load moment column is calculated automatically as weight multiplied by radius for each step.

 

Planned lift sequence and load moment


Calculated load moment is an indicative planning value only. Each lift stage must be independently checked against the applicable crane load chart and approved lifting configuration by a competent reviewer.


Step number

Description of the step

Load weight (t)

Radius (m)

Load moment (t.m)

Reviewed by supervisor?

A
B
C
D
E
F
1
1
Rig and hoist load 300 mm clear of the trailer, hold for stability check
12.00
9.00
108.00
2
2
Slew load clear of the trailer and any personnel
12.00
12.00
144.00
3
3
Lower and land the load onto the prepared plinth
12.00
11.00
132.00
4
 
 
 
 
0.00
5
 
 
 
 
0.00
6
 
 
 
 
0.00
7
 
 
 
 
0.00
8
 
 
 
 
0.00
9
 
 
 
 
0.00
10
 
 
 
 
0.00

Describe the full step-by-step lift sequence in narrative form

Planned load path

 

Please describe the combined movement:

Will the crane travel or carry the load over any distance?

 

Describe the travel route, surface condition, gradient and the controls applied during travel

Is a trial lift at low height required before the main lift?

 

Trial lift height above the supporting surface (m)

Estimated total lift duration (hours)

Number of individual hoists planned

Describe the landing area preparation and how the load will be secured once landed

7. Personnel, Roles and Competency

List everyone taking a defined role in the lift. Competency information should reflect whatever evidence is normally held at your site or organisation.

 

Lift team roster

Full name

Role in the lift

Competency or certification reference

Certification expiry date

Fit for duty today?

A
B
C
D
E
1
 
 
 
 
2
 
 
 
 
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Appointed lift supervisor or lift director (full name)

Primary crane operator (full name)

Signaller or banksman (full name)

Rigger or slinger (full name)

Total number of people involved in or supporting the lift

Has a pre-lift briefing or toolbox talk been scheduled?

 

Briefing date and time

 

Explain how the team will be briefed before work starts

Which roles require additional authorisation or specialist input? (select all that apply)

Are all team members familiar with the site's emergency and evacuation arrangements?

 

Describe the induction or briefing that will be provided before the lift

Has any team member reported fatigue, illness, medication effects or impairment that could affect safe performance?

 

Describe the situation and how it has been managed (do not include sensitive medical detail beyond what is necessary)

8. Environmental Conditions and Surrounding Hazards

Forecast or measured wind speed at lift time (km/h)

Maximum wind speed permitted for this lift by the equipment documentation (km/h)

Will the lift proceed if wind speeds approach or exceed the stated limit?

 

Explain the additional assessment, monitoring and stop-work triggers that will apply

 

Who will monitor wind conditions and how often?

Weather or environmental factors of concern (select all that apply)

Expected lighting conditions

 

Describe the lighting arrangement, coverage and any shadow or glare risks

Ambient temperature at lift time (degrees Celsius)

Are there overhead or underground services within the crane's operating radius?

 

Which services are present? (select all that apply)

 

Please describe the service:

Minimum planned clearance to the nearest service or obstruction (m)

Is there public access, occupied buildings or active work areas within the potential drop zone?

 

Describe the area, the number of people potentially affected and how they will be protected or excluded

Will other work continue in the vicinity during the lift?

 

Describe the other work and how interfaces will be coordinated

9. Exclusion Zones, Access Control and Communication

Will a formal exclusion zone be established around the lift area?

 

Describe the boundaries, physical barriers, signage and who controls entry

 

Explain how people will be kept clear of the load path and drop zone

Planned exclusion zone radius or minimum distance from the load (m)

Communication methods to be used (select all that apply)

 

Please describe the method:

Is a dedicated signaller required for the entire lift?

 

Name the dedicated signaller and state the agreed signal set

Is any part of the lift blind, meaning the operator cannot see the load or the landing point?

 

How will control be maintained during the blind section? (select all that apply)

 

Please describe the arrangement:

Describe traffic management, pedestrian routing and any road or access closures required

Is a standby or safety observer required to watch for unauthorised entry?

 

Name the standby observer and their position

10. Risk Assessment and Control Measures

Rate each hazard for likelihood and severity using the 1 to 5 scales provided. Ratings support discussion and prioritisation; they are not a substitute for your organisation's own assessment method.

 

Likelihood rating for each identified hazard (1 = very unlikely, 5 = very likely)

Load or part of the load falls

Crane overturns or becomes unstable

Contact with overhead or underground services

Ground failure beneath the crane or outrigger

Person struck by swinging or moving load

Rigging or lifting accessory failure

Adverse weather interrupts or destabilises the lift

Communication failure between team members

Unauthorised person enters the exclusion zone

Severity rating for each identified hazard (1 = minor, 5 = catastrophic)

Load or part of the load falls

Crane overturns or becomes unstable

Contact with overhead or underground services

Ground failure beneath the crane or outrigger

Person struck by swinging or moving load

Rigging or lifting accessory failure

Adverse weather interrupts or destabilises the lift

Communication failure between team members

Unauthorised person enters the exclusion zone

Control measures to be applied (select all that apply)

 

Please describe the additional control measure:

Has the residual risk been assessed against the organisation's approved risk acceptance criteria, and are any additional controls required?

What additional controls or corrective actions are required before the lift can proceed?

Have residual risks been reviewed and accepted by a competent person?

 

Name of the reviewing person and date of review

 

Explain what further review is required before the lift can proceed

List any residual concerns, assumptions or conditions attached to this assessment

11. Emergency Preparedness and Stop-Work Criteria

Emergency scenarios planned for (select all that apply)

 

Please describe the scenario and the planned response:

Is an emergency rescue plan required for persons working at height or in a man-riding basket?

 

Describe the rescue arrangement, equipment and the persons responsible

Emergency contact name and number

Nearest first aid point or medical facility and its location

Will trained first aiders be present on site throughout the lift?

 

Name the first aider(s) on duty

Is firefighting or spill-response equipment required to be on standby?

 

Describe the equipment and its location

State the abort criteria and stop-work triggers for this lift

Does every team member have the authority to stop the lift without seeking approval?

 

Explain the escalation process and who may authorise a restart

12. Supporting Documentation and Attachments

Which documents are attached or available on site? (select all that apply)

 

Please describe the document and its reference:

Upload the lift plan or supporting documents

Choose a file or drop it here
 

Upload a rigging sketch, site photo or lift route layout

Choose a file or drop it here

Drawing, sketch or document reference numbers

Are all attachments current, legible and available to the lift team on the day?

 

Describe what is missing and how it will be resolved before the lift

13. Declarations, Review and Permit Sign-Off

By signing below, each person confirms they have reviewed the information relevant to their role. Any change to the load, crane configuration, weather, ground conditions or personnel requires the lift to be paused and this permit to be reviewed again.

 

I confirm that the information recorded in this permit is accurate and complete to the best of my knowledge

I understand that the lift must stop if conditions change or if any stop-work trigger is reached

I confirm that the lift team has been briefed on the plan, the hazards and the emergency arrangements

Additional conditions, restrictions or comments attached to this permit

Review outcome

 

Approval records the outcome of the designated site review. It does not independently establish regulatory compliance or replace applicable permits, engineering approvals, site procedures or other required authorisations.

 

State the conditions attached to this approval:

 

State the information required before the permit can be reconsidered:

 

State the reasons for rejection and the changes needed:

Name of the person requesting the permit

Signature of the person requesting the permit

Name of the lift supervisor or competent reviewer

Signature of the lift supervisor or competent reviewer

Name of the site representative or permit issuer

Signature of the site representative or permit issuer

Date of authorisation

Permit valid from

Permit valid until

Has a close-out or post-lift review been scheduled?

 

Date of the post-lift review

 

Explain how lessons or issues identified during the lift will be captured

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.