Corporate Office EV Charging Infrastructure: Comprehensive Intake & Authorization Request

1. Section 1: Facility Location & Parking Structure Zone Metadata

Provide detailed information about your facility and the specific parking zones where EV charging infrastructure will be installed. Accurate metadata ensures proper planning and installation.


Facility Official Name

Facility Complete Address

Facility Identification Code (if applicable)

Facility Ownership Status

Total Facility Gross Floor Area (square meters)


Parking Structure Overview


Primary Parking Structure Type

Total Number of Parking Spaces in Facility

Number of Parking Levels or Zones


Is the parking facility accessible to the public?


Proposed EV Charging Installation Zone Details


Proposed Zone Identifier or Name

Number of Parking Spaces in Proposed Zone

Maximum Number of EV Chargers Planned for This Zone

Installation Area Environment

Is there existing electrical infrastructure in the proposed zone?


Will installation require structural modifications?


Are there waterproofing or drainage considerations?


Is the installation zone designated for accessibility-compliant parking?


Does the zone have existing network/communications cabling?


Are there plans for future expansion beyond this initial installation?


Upload Site Plan or Parking Layout Map (showing proposed zone)

Choose a file or drop it here

Upload Photographs of Proposed Installation Area (minimum 3 angles)

Choose a file or drop it here

Upload Existing Electrical Drawings (if available)

Choose a file or drop it here
 

2. Section 2: Power Grid Capacity, Amperage Draw & Load-Balancing Audit

Provide comprehensive details about current electrical infrastructure and projected load from EV charging. This audit determines grid readiness and identifies required upgrades.


Main Electrical Service Provider/Grid Operator Name

Main Service Capacity (kVA)

Main Service Voltage (V)


Electrical Service Phase Configuration

Number of Existing Main Distribution Panels


Current Load Profile Analysis


Average Baseline Electrical Load (kW)

Peak Historical Demand (kW)


Date/Time of Peak Demand Recording

Current Spare Capacity at Peak (kW)


Do you have 12 months of interval meter data available?


Proposed EV Charging Equipment Specifications


EV Charger Configuration Details

Charger Model/Type

Quantity

Power per Unit (kW)

Voltage (V)

Max Current per Unit (A)

Connector Type(s)

Dynamic Load Management Capable?

Level 2 AC Charger - Dual Port
8
22
400
32
Type 2
Yes
DC Fast Charger - Single Port
2
150
400
217
CCS2
Yes
Level 2 AC Charger - Single Port
2
7.4
230
32
Type 2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Total Simultaneous Maximum Draw (kW)

Total Simultaneous Maximum Current (A)


Will this installation require main service upgrade?


Will additional transformers be required?


Is load-balancing or dynamic load management planned?


Will on-site energy storage (battery) be integrated?


Will renewable energy generation (solar/wind) supplement charging?


Is backup generator power available for emergency charging?


Technical Risk Assessment - Rate the following concerns

Very Low Risk

Low Risk

Medium Risk

High Risk

Very High Risk

Voltage drop over cable runs

Harmonic distortion from chargers

Grid stability impact

Equipment overheating risk

Cybersecurity vulnerabilities

Upload Preliminary Single Line Diagram (SLD)

Choose a file or drop it here
 

Upload Load Calculation Summary Report

Choose a file or drop it here
 

3. Section 3: Municipal Electrical Permitting & Local Utility Interconnection Review

Detail all regulatory, permitting, and utility coordination requirements. This section ensures compliance with local authorities and grid operators.


Are municipal electrical permits required for this installation?


Permit Application Status

Primary Municipal Authority Contact Name

Authority Organization Name

Authority Contact Email

Authority Contact Phone

Expected Permit Approval Date

Estimated Total Permit Fees


Is the facility located in a special regulatory zone?


Utility Interconnection Requirements


Local Distribution Utility Company Name

Utility Account Number for Facility

Has formal interconnection application been submitted to utility?


Utility Interconnection Study Requirements

Utility Interconnection Approval Deadline

Will the installation include export to grid (V2G capability)?


Are there grid reinforcement costs to be borne by project?


Is a power quality impact study required?


Are there export power limitations imposed by utility?


Is a witness test or inspection required by utility before energization?


Does the project require third-party technical certification?


Describe any known regulatory barriers or special approval conditions:

Regulatory Submission Timeline Tracker

Submission Item

Planned Submission Date

Actual Submission Date

Expected Approval Date

Responsible Party

Associated Fees

Municipal Electrical Permit
7/15/2025
 
8/30/2025
Facility Management
$2,500.00
Utility Interconnection Application
7/1/2025
 
9/15/2025
Electrical Engineer
$0.00
Fire Safety Approval
7/20/2025
 
8/20/2025
Safety Officer
$1,500.00
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4. Section 4: Employee Tariff Structure, Access Rules & Payment Gateway Setup

Define the operational model for employee and visitor access, pricing, payment processing, and energy cost allocation. This establishes the user experience and financial framework.


Intended User Groups (select all that apply)

Will charging be offered free to employees?


Will time-of-use pricing be implemented?


Will there be different tariffs for different user groups?


Primary Access Control Method

Will reservations be required or allowed?


Maximum Charging Session Duration (hours)

Will idle fees apply after charging completes?


Payment Gateway & Financial Integration


Will payment processing be handled internally or externally?


Will charging costs be integrated with employee payroll deduction?


Will corporate sustainability incentives or subsidies apply?


Is VAT/sales tax recovery applicable for business use?


Will multi-tenant cost allocation be required?


Energy Management & Reporting


Will chargers be enrolled in utility demand response programs?


Is real-time energy monitoring and reporting required?


Will renewable energy certificates (RECs) be tracked for green charging?


Describe any additional operational policies (e.g., fair use, priority access, visitor etiquette):

Upload Draft User Terms & Conditions Document

Choose a file or drop it here
 

5. Section 5: Chief Building Engineer & Corporate Sustainability Director Sign-Off

Final authorization requires technical validation from the Chief Building Engineer and strategic approval from the Corporate Sustainability Director. Complete all attestations and attach supporting documentation.

Chief Building Engineer Technical Validation


Chief Building Engineer Full Name

Professional Engineering License Number (if applicable)

Engineer Email Address

Technical Feasibility Assessment - Chief Engineer Rating

Not Feasible

Major Concerns

Moderate Concerns

Minor Concerns

Fully Feasible

Electrical capacity adequacy

Structural integrity of installation zones

Network/communications infrastructure readiness

Safety and code compliance

Maintainability and access for repairs

Chief Engineer Technical Comments and Reservations:

Does the Chief Engineer approve the technical design as submitted?


Corporate Sustainability Director Strategic Approval


Corporate Sustainability Director Full Name

Director Email Address

Estimated Annual CO2 Emissions Avoided (metric tons)

Percentage of Corporate Fleet Targeted for Electrification

Does this project align with corporate carbon neutrality goals?


Has the project budget been approved by Finance?


Have all stakeholders been consulted (HR, IT, Legal, Facilities)?


Is a pilot program recommended before full deployment?


Sustainability Director Strategic Comments:

Does the Sustainability Director approve the project as submitted?


Final Authorization & Risk Acknowledgment


I acknowledge that all information provided is accurate to the best of my knowledge

I acknowledge that project delays may occur due to regulatory or utility approval processes beyond our control

I acknowledge that final costs may vary based on actual site conditions and utility requirements

I confirm that maintenance and operations responsibilities have been assigned post-installation


Chief Building Engineer Digital Signature

Corporate Sustainability Director Digital Signature

Authorization Date

Upload Signed Project Charter or Authorization Memo

Choose a file or drop it here
 

Upload Risk Register and Mitigation Plan

Choose a file or drop it here
 
How can you best shape this form template to reflect your individual needs and the way you like to work? Let's customize it! Edit this EV Charging Infrastructure Installation & Grid Integration Intake Request Form
Imagine the efficiency of forms that provide instant, calculated results! Create this time-saving solution with Zapof's spreadsheet-powered tables.
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof