Authorize EV Charging Installation and Grid Integration at Your Corporate Office Site

1. Section 1 — Facility Location & Parking Structure Zone Metadata

This intake form gathers the information a facility team typically needs when planning electric vehicle charging equipment and its connection to the site electrical supply. Please answer as completely as you can. Requirements, review processes and approval routes differ between jurisdictions and between electricity providers, so confirm local expectations with the relevant authority or network operator before scheduling work. Use "Not yet determined" where information is still being gathered.

 

Facility or site name

Internal site or asset reference

Requesting facility manager

Facility manager contact email

Street address of the site

City, town or municipality

Subnational region, province, state or county

Postal or ZIP code

Country or jurisdiction

What best describes the site tenure arrangement?

 

Please note any lease clauses relating to fixed equipment, alterations or reinstatement of the parking area:

 

Lease expiry date:

 

Please list the other occupiers and any shared-use agreements affecting the parking areas:

 

Property manager or managing agent name:

 

Please describe the tenure arrangement:

What type of parking provision does the site have?

 

Is mechanical ventilation or gas detection present in the below-grade parking area?

 

Please describe the ventilation system and any operating constraints relevant to adding electrical equipment:

 

Please note any ventilation or air-quality considerations being evaluated for the proposed equipment locations:

 

How many occupied levels sit above the parking levels?

Total number of parking stalls on site

Number of parking levels or distinct parking areas

Number of stalls proposed for electric vehicle charging in this phase

Number of stalls to be kept ready for future expansion (conduit or panel capacity reserved)

Which parking zone categories should be served by charging equipment?

 

How many fleet or pool vehicles are expected to require charging on a typical weekday?

 

Please describe any restrictions on charging during loading or delivery windows:

Parking zone inventory and charging allocation

Zone identifier

Level or area description

Primary zone purpose

Total stalls in zone

Stalls designated for charging

Share of zone stalls with charging (percent)

A
B
C
D
E
F
1
A-1
Level 1 - East bay
Employee commuter
120
12
10.0
2
A-2
Level 2 - North bay
Employee commuter
96
8
8.3
3
B-1
Ground - Visitor frontage
Visitor and guest
30
2
6.7
4
C-1
Ground - Service yard
Fleet and delivery
18
2
11.1
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Typical vehicle dwell time during charging windows (hours)

Facility operating hours and main occupancy pattern

Does the site form part of a multi-building campus with shared electrical infrastructure?

 

Please list the other buildings, the shared substations or switchrooms, and who controls them:

Are there already electric vehicle charging points installed at this site?

 

How many charging points are currently installed and in service?

 

Has any preparatory work such as trenching, conduit or panel capacity been carried out for future charging?

 

Please describe the preparatory work completed and where it is located:

Which charging connector or outlet styles are expected to be offered at this site?

 

Please describe the vehicle makes and models expected to use the site, so connector needs can be estimated:

Is a structural review of the parking deck or slab needed before equipment is mounted or vehicles are routed through new areas?

 

Who will carry out the structural review?

 

Consultant or firm name:

Which site conditions should the design team allow for?

 

Please describe the water or weather exposure and any drainage considerations:

 

Please describe the permitted working windows and any notice periods required:

Please upload a site plan or parking layout drawing showing the proposed charging zones

Choose a file or drop it here

Any additional notes on the site, parking structure or access arrangements

2. Section 2 — Power Grid Capacity, Amperage Draw & Load-Balancing Audit

This section records what is known about the existing electrical supply, how much spare capacity may be available, and how the new charging load is expected to be managed. Figures marked as measured should come from metering or monitoring data where possible. Where values are estimated, please say so in the notes so the reviewing engineer can weigh them appropriately.

 

Electrical contractor or engineering firm preparing this section

What is the site's main supply configuration?

 

Please state the measured phase-to-phase voltage (for example 400 V):

 

Please state the incoming supply voltage and transformer rating:

 

Please list each point of connection and its approximate capacity:

Main switchboard or service protective device rating (amperes)

Highest recorded site demand (kilowatts)

Estimated spare capacity available for new loads (amperes)

Estimated spare capacity available for new loads (kilowatts)

Is a documented load study or demand audit available for this site?

 

Please upload the load study or demand audit report

Choose a file or drop it here
 
 

Would you like a load study to be commissioned as part of this request?

 

Preferred provider or contact for the load study:

Date of the most recent electrical capacity assessment

Existing panel and feeder schedule

Panel or switchboard identifier

Area or zone served

Nominal voltage

Protective device rating (A)

Measured peak draw (A)

Remaining headroom (A)

A
B
C
D
E
F
1
MSB-01
Whole site main board
400 V three-phase
800.0
610.0
190.0
2
DB-L1E
Level 1 east parking
400 V three-phase
225.0
140.0
85.0
3
DB-L2N
Level 2 north parking
400 V three-phase
160.0
118.0
42.0
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Which charging power approach is proposed for this phase?

 

How many direct-current fast charging units are proposed?

 

Please describe the proposed mix, including how many units of each type:

Total number of charge points proposed in this phase

Rated output per charge point (kilowatts)

Estimated connected load if all charge points run at full output (kilowatts)

Estimated realistic peak charging demand after diversity (kilowatts)

Which load-management measures are planned or already in place?

 

Please describe how the dynamic load management will be controlled and which measurement point it will follow:

 

Please state the proposed charging windows (for example 20:00-06:00):

 

Usable battery storage capacity (kilowatt-hours)

 

Please describe the flexibility or demand-response arrangement and any notice obligations:

Is a supply upgrade, new service connection or additional metering expected to be required?

 

Which upgrade elements are expected?

 

Please note any space, access or civil works needed for new transformation equipment:

Rough order-of-magnitude budget set aside for electrical works

Have power quality factors such as harmonics, voltage drop or neutral loading been reviewed for the proposed installation?

 

Please summarise the findings and any mitigation proposed:

 

Please flag this item for review by the appointed electrical engineer

Please rate the current state of each capacity and load-balancing topic

Not yet reviewed

Reviewed - concerns noted

Reviewed - acceptable

Not applicable

Spare capacity documented from metering or monitoring data

Feeder and cable routes surveyed for the proposed charge point locations

Earthing and bonding arrangements reviewed

Load management strategy defined

Future expansion capacity considered in the design

Coordination with any on-site generation or storage confirmed

Please upload the site single-line diagram or relevant electrical drawings

Choose a file or drop it here
 

Additional notes on capacity, load balancing or electrical constraints

3. Section 3 — Municipal Electrical Permitting & Local Utility Interconnection Review

Approval routes for electrical work and for connecting new loads vary widely between locations and between electricity providers. The questions below simply record what has been identified so far and who is responsible for following it up. Nothing in this section should be read as a statement that any requirement has been met; please verify the applicable process with the local authority and the network operator.

 

Which body is expected to review or approve the electrical work at this site?

 

Name of the inspection body:

 

Please list each authority involved and the scope each one covers:

 

Please assign someone to identify the correct authority before design work begins

Main contact at the reviewing authority or their representative

Which review topics are expected to be part of the approval route at this location?

 

Please describe the environmental or stormwater considerations raised:

 

Please describe the land use or planning questions raised:

 

Please describe the interconnection review steps indicated by the network operator:

Permit and approval tracker

Approval or permit item

Issuing body or network operator

Reference number

Submission date

Current status

Target decision date

A
B
C
D
E
F
1
Electrical installation notification
Municipal building department
EL-2027-0148
2/15/2027
Under review
3/20/2027
2
Network interconnection application
Local electricity network operator
IC-88231
2/18/2027
Additional information requested
3/31/2027
3
Parking layout modification notice
Site property manager
PM-2027-07
2/20/2027
Approved with conditions
3/5/2027
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Has an interconnection or connection application been submitted to the local electricity network operator?

 

What response has been received so far?

 

Please list the conditions or limitations stated by the network operator:

 

Please describe the study requested, its scope and any indicative timeframe:

 

Please describe what needs to be corrected and resubmitted:

 

Would you like assistance preparing the interconnection enquiry?

 

Who should be contacted to start the enquiry?

Will the project require a new metering arrangement or a separate account for the charging equipment?

 

Which metering arrangement is preferred?

 

Please note any site works or network involvement expected for a dedicated service:

Which on-site provisions are expected to be reviewed alongside the charging equipment?

 

Please describe the accessibility provisions being considered for the charging bays:

 

Please describe the emergency stop and firefighting provisions being considered:

Is a commissioning inspection or handover check expected before the equipment can be used?

 

Please describe who will carry out the inspection and what documentation they will require:

Target date for submitting the main permit or notification

Target date for completing installation works

Target date for energising the charging equipment

The facility team has made contact with the relevant local authority and electricity network operator to confirm which approvals and reviews apply to this project

Known local conditions, restrictions or timelines that the project team should plan around

4. Section 4 — Employee Tariff Structure, Access Rules & Payment Gateway Setup

This section sets out how employees and other users will be charged, who may use the equipment, and how payments or internal cost recovery will be handled. Pricing and access rules should be reviewed against the organization's own internal policies and any local consumer or data-handling expectations before publication to users.

 

Which pricing model is proposed for charging at this site?

 

Proposed fee per session:

 

Proposed price per unit of energy (for example per kilowatt-hour):

 

Please describe the time bands and the rate for each band:

 

Please add this item to the agenda for the pricing working group

Tariff and charging schedule by user group

User group

Billing basis

Rate

Session fee

Daily cap

Effective from

Notes

A
B
C
D
E
F
G
1
Employees - standard
Per unit of energy
$0.28
$0.00
$12.00
4/1/2027
Reviewed annually against the site supply rate
2
Employees - off-peak window
Per unit of energy
$0.19
$0.00
$8.00
4/1/2027
Applies outside 09:00-17:00 on working days
3
Contractors and long-term visitors
Per hour
$2.50
$0.00
$20.00
4/1/2027
Access arranged through the site help desk
4
Company fleet vehicles
Internal cost allocation
$0.00
$0.00
$0.00
4/1/2027
Charged to the fleet operating cost centre
5
 
 
 
 
 
 
 
6
 
 
 
 
 
 
 
7
 
 
 
 
 
 
 
8
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
10
 
 
 
 
 
 
 

Which user groups will be permitted to use the charging equipment?

 

Please describe how public access would be managed, including hours of access and any charging arrangements:

How will access to the charging equipment be controlled?

 

Can the existing badge system report usage events for billing purposes?

 

Which team or system owner manages that reporting?

 

Name of the application or platform proposed for account-based access:

 

Please describe the combined access arrangement and which method takes priority:

Will users be required to pay at the point of charging through a payment gateway?

 

Which payment methods should be supported?

 

Please describe the payroll deduction process and any internal approvals it requires:

 

How will charging usage be recorded if no payment is taken at the point of charging?

 

Which finance team or cost-centre structure will receive the allocation?

How often should collected funds or internal charges be settled?

Maximum charging session length before a vehicle must be moved (hours)

Should an overstay or idle fee apply once a vehicle has finished charging?

 

Proposed overstay fee per hour or part hour:

 

How should vehicles that stay beyond the session limit be handled?

How should access to limited charging bays be allocated when demand exceeds supply?

 

Please describe the booking window, cancellation rules and any no-show handling:

 

Please describe how teams are rotated and who maintains the schedule:

 

Please describe the priority order and who can override it:

Which enforcement measures should be available if access rules are not followed?

 

Please describe the suspension process, its duration and how access is restored:

 

Please describe who may authorise relocation and how costs are handled:

Please rate how clearly each user-facing policy is currently defined

Not defined yet

Draft in progress

Clearly defined

Not applicable

Pricing and billing rules

Session length and overstay handling

Booking or allocation rules

Eligibility of different user groups

Procedure for reporting a faulty charge point

Handling of personal data used for access and billing

Personal data collected for access control and billing will be handled in line with the organization's internal data-handling policy and any applicable local expectations

Exceptions, accommodations or special arrangements to be built into the access rules

5. Section 5 — Chief Building Engineer & Corporate Sustainability Director Sign-Off

This final section records the internal review and authorisation of the request. Each reviewer confirms that they have examined the information provided within their area of responsibility and sets out any conditions attached to their approval. Signatures record an internal decision only and do not replace any external approval, inspection or connection agreement that may be required.

 

Chief Building Engineer - full name

Chief Building Engineer - job title

Chief Building Engineer - work email

Chief Building Engineer - contact number

Engineering review checklist

Not reviewed

Reviewed - concerns noted

Reviewed - acceptable

Not applicable

Structural capacity of the parking area reviewed for the proposed equipment and vehicle routing

Electrical capacity, protective devices and earthing arrangements reviewed

Egress routes, fire safety and emergency access reviewed

Ventilation and environmental conditions at the equipment locations reviewed

Ongoing maintenance access and service clearances reviewed

Coordination with existing building systems and controls reviewed

Future expansion provisions reviewed

Are there conditions attached to the engineering approval?

 

Please list each condition and the point in the project by which it must be met:

Does the engineering review require any further specialist input before installation begins?

 

Which specialist input is required?

 

Name of the structural engineer or firm to be engaged:

Chief Building Engineer signature

Date of engineering sign-off

Corporate Sustainability Director - full name

Corporate Sustainability Director - job title

Corporate Sustainability Director - work email

Sustainability review checklist

Not reviewed

Reviewed - concerns noted

Reviewed - acceptable

Not applicable

Alignment with the organization's stated emissions reduction goals

Availability of lower-carbon or renewable electricity for the charging load

Readiness to report charging energy use in internal sustainability reporting

Alignment with fleet electrification and commuter travel plans

Consideration of reuse, recycling and end-of-life handling for the equipment

Contribution to employee engagement and travel behaviour goals

Estimated annual energy delivered to vehicles (megawatt-hours)

Estimated annual emissions reduction compared with the current travel baseline (tonnes of carbon dioxide equivalent)

How will the emissions estimate be calculated and recorded?

 

Please state the source and date of the energy mix information to be used:

Are there conditions attached to the sustainability approval?

 

Please list each condition and how it will be tracked:

Corporate Sustainability Director signature

Date of sustainability sign-off

Both reviewers confirm that the information in this request has been examined within their area of responsibility and that any conditions noted above are recorded in the project file

Suggested date for the first post-installation review

Final comments, conditions or follow-up actions

Analysis for EV Charging Infrastructure Installation & Grid Integration Intake Request Form

Important Note:

This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes.

AI-Generated Content: This template and its accompanying guidance are AI-generated to provide a practical starting point for your form-building needs. Please review and customise the content to ensure it is accurate, appropriate and suitable for your intended use.

This guide is provided for general informational and planning purposes only. It does not constitute professional, legal, financial, medical, employment, privacy, regulatory, or advice of any other kind, nor does it certify that this template is suitable or compliant for any particular jurisdiction or purpose.

Laws, regulations, industry practices and business requirements vary. You are responsible for reviewing and customising the template to suit your intended use and obtaining advice from appropriately qualified professionals where necessary.

Please delete this section before publishing your form. See our Terms of Service for further information.


 

This intake request form is designed to capture the comprehensive set of information a facility team typically needs when planning, authorising and integrating electric vehicle charging equipment at corporate office sites. The form is organised into five clearly delineated sections that follow a logical project workflow: site and parking metadata, electrical capacity and load management, permitting and interconnection review, user-facing tariff and access policies, and internal engineering and sustainability sign-off. This sequential structure mirrors the real-world progression of an infrastructure project and helps respondents understand what information is needed at each stage.

 

Form Structure Overview

The form opens with an introductory paragraph in Section 1 that sets expectations, encourages respondents to use Not yet determined where appropriate, and acknowledges that requirements vary by jurisdiction and electricity provider. This is an effective design choice that reduces respondent anxiety and improves data quality by providing a clear fallback option. The five-section layout keeps related topics together and allows different stakeholders to contribute to their respective areas. The form makes extensive use of conditional follow-up questions, structured tables with formula columns, and matrix rating scales, all of which contribute to efficient data collection and analytical value.

 

Section 1 — Facility Location & Parking Structure Zone Metadata

This section establishes the physical and organisational context for the project. It captures where the site is, who is requesting the work, how the parking is laid out, and what conditions the design team must allow for.

 

Facility or site name — Identifies the specific building or campus where the installation is planned. This is the primary identifier that ties all subsequent data to a physical location and supports internal record-keeping and project tracking.

 

Internal site or asset reference — An optional field for the organisation's own asset or facility code. Including this helps cross-reference the request with existing property management or asset tracking systems.

 

Requesting facility manager — Records the person initiating the request, creating a clear point of contact for follow-up questions and helping route the request through the correct internal channels.

 

Facility manager contact email — Captures a digital contact channel for the requesting manager, supporting notifications, status updates and direct communication during the review process.

 

Street address of the site, City, town or municipality, Subnational region, province, state or county, Postal or ZIP code and Country or jurisdiction — Together these fields build a complete postal address. The address is essential for identifying which local authority and electricity network operator will be involved, since approval routes and interconnection processes vary by location. The country field is marked as mandatory, reflecting its role in determining the applicable operational context.

 

What best describes the site tenure arrangement? — Understanding whether the site is owned, leased or managed by a third party affects who has authority to approve physical alterations. The conditional follow-up questions are well designed: lease clauses are captured for long-term leases, expiry dates for short-term leases, other occupiers for shared campuses, and property manager details for third-party arrangements. This branching logic collects only the information relevant to each scenario.

 

What type of parking provision does the site have? — The parking type directly influences equipment selection, mounting methods and safety provisions. The follow-up questions for underground parking (ventilation and gas detection) and podium structures (number of occupied levels above) address real design constraints. The yes/no branching on ventilation is particularly thoughtful, as it prompts the respondent to describe either existing systems or considerations being evaluated.

 

Total number of parking stalls on site and Number of stalls proposed for electric vehicle charging in this phase — These two figures together establish the scope of the current phase relative to the overall parking provision. The optional field for Number of stalls to be kept ready for future expansion (conduit or panel capacity reserved) is a forward-looking design choice that encourages respondents to think about scalability.

 

Number of parking levels or distinct parking areas — Provides context on the complexity of the parking layout, which affects cable routing, panel placement and construction logistics.

 

Which parking zone categories should be served by charging equipment? — This multiple-choice question identifies the intended user groups and use cases. The follow-up questions for fleet vehicles (expected weekday charging demand) and delivery areas (restrictions during loading windows) demonstrate attention to operational realities.

 

Parking zone inventory and charging allocation — This table is an effective way to capture zone-level detail in a structured format. The formula column calculating the share of zone stalls with charging provides an immediate visual indicator of allocation density. The pre-populated example rows help respondents understand the expected format and level of detail.

 

Typical vehicle dwell time during charging windows (hours) — Dwell time informs the choice between lower-power and higher-power charging options, since longer dwell times may allow slower, less expensive equipment.

 

Facility operating hours and main occupancy pattern — Understanding when the building is occupied helps determine charging demand patterns, access control needs and whether off-peak charging windows are feasible.

 

Does the site form part of a multi-building campus with shared electrical infrastructure? — Shared infrastructure can affect capacity planning and coordination. The follow-up question prompts the respondent to identify other buildings, shared substations and who controls them.

 

Are there already electric vehicle charging points installed at this site? — This yes/no question with nested follow-ups efficiently distinguishes between sites with existing infrastructure (capturing current point count) and greenfield sites (checking for preparatory work such as trenching or conduit). The nested structure avoids asking irrelevant questions.

 

Which charging connector or outlet styles are expected to be offered at this site? — Connector type affects equipment procurement and user experience. The Undecided option with a follow-up asking about expected vehicle makes and models is a helpful design choice that supports informed recommendations.

 

Is a structural review of the parking deck or slab needed before equipment is mounted or vehicles are routed through new areas? — This question addresses a practical safety and engineering consideration. The follow-up identifies who will carry out the review and captures the consultant name if an external firm is appointed.

 

Which site conditions should the design team allow for? — This multiple-choice question covers common physical and logistical constraints such as clearance, weather exposure, lighting, wall space, pedestrian routes, heritage constraints and working-hour restrictions. The follow-up questions for weather exposure and restricted working windows add useful detail.

 

Please upload a site plan or parking layout drawing showing the proposed charging zones — A visual reference is invaluable for design teams. Making this optional is sensible since not all respondents will have a drawing readily available at the intake stage.

 

Any additional notes on the site, parking structure or access arrangements — A free-text field at the end of the section allows respondents to capture context that does not fit neatly into the structured fields.

 

Section 2 — Power Grid Capacity, Amperage Draw & Load-Balancing Audit

This section focuses on the electrical supply side of the project. It records what is known about existing capacity, how the new load will be managed, and what upgrades may be needed. The introductory paragraph wisely distinguishes between measured and estimated values, encouraging data quality.

 

Electrical contractor or engineering firm preparing this section — Identifies who compiled the electrical data, which helps the reviewing engineer assess the reliability and source of the information.

 

What is the site's main supply configuration? — The supply type (single-phase, three-phase low voltage, medium voltage with transformation, or multiple connections) fundamentally determines the charging equipment options and installation approach. The follow-up questions capture specific voltage, transformer ratings or connection details as appropriate.

 

Main switchboard or service protective device rating (amperes) — This figure establishes the upper bound of the site's electrical capacity and is a key input for load calculations.

 

Highest recorded site demand (kilowatts) — Peak demand data helps determine how much headroom exists for new loads. This is optional, reflecting that not all sites have detailed metering data available.

 

Estimated spare capacity available for new loads (amperes) and Estimated spare capacity available for new loads (kilowatts) — These two figures are central to feasibility assessment. Capturing both amperage and kilowatt values allows cross-checking and accommodates different ways of expressing capacity.

 

Is a documented load study or demand audit available for this site? — This branching question efficiently handles both scenarios: sites with existing studies can upload the report, while sites without one can indicate whether they want a study commissioned. The nested follow-up captures the preferred provider.

 

Date of the most recent electrical capacity assessment — Helps the reviewing engineer gauge how current the capacity data is.

 

Existing panel and feeder schedule — This table captures panel-level detail including voltage, protective device rating, measured peak draw and calculated remaining headroom. The formula column (remaining headroom equals device rating minus peak draw) provides an immediate capacity indicator at each panel.

 

Which charging power approach is proposed for this phase? — The choice between low-power alternating-current outlets, medium-power alternating-current charge points, direct-current fast charging, or a mix determines equipment type, cost and electrical demand. The follow-up questions capture unit counts and mix details.

 

Total number of charge points proposed in this phase and Rated output per charge point (kilowatts) — Together these establish the scale and per-unit power of the installation.

 

Estimated connected load if all charge points run at full output (kilowatts) — The theoretical maximum load is important for equipment sizing and protective device coordination.

 

Estimated realistic peak charging demand after diversity (kilowatts) — The diversified demand figure is more representative of actual operating conditions and is typically lower than the connected load. Capturing both figures supports balanced design.

 

Which load-management measures are planned or already in place? — This multiple-choice question covers a range of strategies from static load limiting to dynamic management, scheduled windows, on-site generation, storage and demand-response participation. The follow-up questions capture implementation details for each selected measure.

 

Is a supply upgrade, new service connection or additional metering expected to be required? — This branching question identifies whether the existing supply can accommodate the new load or whether upgrades are needed. The follow-up captures the specific upgrade elements.

 

Rough order-of-magnitude budget set aside for electrical works — A budget figure helps the project team assess feasibility and prioritise options. The framing appropriately sets expectations about precision.

 

Have power quality factors such as harmonics, voltage drop or neutral loading been reviewed for the proposed installation? — Power quality is an important consideration for charging installations. The branching structure allows respondents to either summarise findings or flag the item for review, which is a practical approach.

 

Please rate the current state of each capacity and load-balancing topic — This matrix rating question provides a structured assessment across six key topics including spare capacity documentation, feeder surveys, earthing, load management strategy, expansion provisions and coordination with on-site generation. The four-point scale (including Not applicable) is clear and practical.

 

Please upload the site single-line diagram or relevant electrical drawings — Visual electrical documentation supports the reviewing engineer's assessment. Making this optional is appropriate for the intake stage.

 

Additional notes on capacity, load balancing or electrical constraints — A free-text field captures nuances such as seasonal capacity variations that structured fields may miss.

 

Section 3 — Municipal Electrical Permitting & Local Utility Interconnection Review

This section documents the approval and interconnection landscape. The introductory paragraph is particularly well written: it clearly states that the section records what has been identified so far and explicitly notes that nothing in the section should be read as confirming that any requirement has been met. This is an important framing that avoids implying regulatory compliance.

 

Which body is expected to review or approve the electrical work at this site? — Identifying the approving authority is a critical early step. The options cover a range of scenarios from a single municipal authority to multiple bodies. The follow-up for Not yet identified includes a checkbox to assign someone to identify the correct authority, which is a practical action item.

 

Main contact at the reviewing authority or their representative — Captures a point of contact at the authority, which supports efficient communication during the review process.

 

Which review topics are expected to be part of the approval route at this location? — This multiple-choice question covers common review areas including electrical safety, structural works, fire and life safety, accessibility, environmental considerations, land use, network interconnection and signage. The follow-up questions for environmental, planning and interconnection topics capture relevant detail.

 

Permit and approval tracker — This table is an excellent project management tool. It captures each approval item, issuing body, reference number, submission date, current status and target decision date. The pre-populated examples illustrate the expected format and show a realistic mix of statuses.

 

Has an interconnection or connection application been submitted to the local electricity network operator? — This branching question handles both scenarios efficiently. If submitted, the follow-up captures the response status and details. If not submitted, it offers assistance and captures a contact person. The nested branching for different response types (approved with conditions, further study requested, returned for corrections) is thorough.

 

Will the project require a new metering arrangement or a separate account for the charging equipment? — Metering affects billing, cost allocation and network arrangements. The follow-up captures the preferred metering approach from a range of options.

 

Which on-site provisions are expected to be reviewed alongside the charging equipment? — This question addresses practical site provisions such as bollards, markings, lighting, accessibility, emergency stops and cable management. The follow-ups for accessibility and fire safety capture important detail.

 

Is a commissioning inspection or handover check expected before the equipment can be used? — Understanding the commissioning requirements helps plan the project timeline. The follow-up captures who will carry out the inspection and what documentation is needed.

 

Target date for submitting the main permit or notification, Target date for completing installation works and Target date for energising the charging equipment — These three date fields establish a project timeline. Only the permit submission date is mandatory, reflecting its role as a critical path item.

 

The facility team has made contact with the relevant local authority and electricity network operator to confirm which approvals and reviews apply to this project — This checkbox serves as a confirmation step, ensuring the respondent has taken the initiative to understand the applicable requirements.

 

Known local conditions, restrictions or timelines that the project team should plan around — A free-text field captures practical information about processing times, inspection booking lead times and other local nuances.

 

Section 4 — Employee Tariff Structure, Access Rules & Payment Gateway Setup

This section addresses the user-facing aspects of the charging programme: pricing, access control, payment handling and usage management. The introductory paragraph appropriately notes that pricing and access rules should be reviewed against internal policies and local expectations.

 

Which pricing model is proposed for charging at this site? — The pricing model determines the financial framework for the service. The options cover a range from fully subsidised to various fee structures. The follow-up questions capture specific rates and details for each model. The Not yet decided option includes a checkbox to add the item to a pricing working group agenda, which is a practical action item.

 

Tariff and charging schedule by user group — This table captures differentiated pricing across user groups with columns for billing basis, rate, session fee, daily cap, effective date and notes. The pre-populated examples show a realistic tariff structure with standard and off-peak rates for employees, hourly rates for contractors and internal cost allocation for fleet vehicles.

 

Which user groups will be permitted to use the charging equipment? — Identifying eligible user groups shapes access rules and communication. The follow-up for public access captures management arrangements.

 

How will access to the charging equipment be controlled? — Access control method affects user experience, security and billing integration. The follow-up questions for badge systems (usage reporting capability), mobile applications (platform name) and combined arrangements (priority method) are practical and well-targeted.

 

Will users be required to pay at the point of charging through a payment gateway? — This branching question addresses both payment and non-payment scenarios. If payment is taken, the follow-up captures supported methods. If not, it captures how usage will be recorded, with a follow-up for cost-centre allocation.

 

How often should collected funds or internal charges be settled? — Settlement frequency affects financial processes and is a practical operational detail.

 

Maximum charging session length before a vehicle must be moved (hours) — Session limits help ensure turnover of charging bays and fair access. This is an important operational parameter.

 

Should an overstay or idle fee apply once a vehicle has finished charging? — The branching structure handles both fee and no-fee scenarios. If a fee applies, the amount is captured. If not, the follow-up captures alternative handling approaches such as courtesy notifications or attendant action.

 

How should access to limited charging bays be allocated when demand exceeds supply? — Allocation policy is critical for user satisfaction and fairness. The options cover first-come-first-served, booking, rotation, waiting lists and fleet priority. The follow-up questions capture implementation details for each approach.

 

Which enforcement measures should be available if access rules are not followed? — Enforcement options range from written reminders to access suspension. The follow-up questions for suspension and vehicle relocation capture process details.

 

Please rate how clearly each user-facing policy is currently defined — This matrix rating provides a structured assessment of policy readiness across six areas including pricing, session rules, booking, eligibility, fault reporting and data handling. This is useful for identifying gaps before launch.

 

Personal data collected for access control and billing will be handled in line with the organization's internal data-handling policy and any applicable local expectations — This checkbox confirms awareness of data handling responsibilities. The wording is appropriately general and refers to internal policies rather than specific regulatory frameworks.

 

Exceptions, accommodations or special arrangements to be built into the access rules — A free-text field allows capture of practical accommodations such as reserved accessible bays.

 

Section 5 — Chief Building Engineer & Corporate Sustainability Director Sign-Off

This section captures the internal review and authorisation process. It is well structured with parallel review blocks for engineering and sustainability perspectives, each including contact details, structured checklists, condition tracking and signature capture.

 

Chief Building Engineer - full name, Chief Building Engineer - job title, Chief Building Engineer - work email and Chief Building Engineer - contact number — These fields identify the engineering reviewer and provide contact details for follow-up. The name and email are mandatory, reflecting their role in establishing accountability and communication.

 

Engineering review checklist — This matrix rating covers seven key engineering topics including structural capacity, electrical arrangements, egress and fire safety, ventilation, maintenance access, building systems coordination and future expansion. The four-point scale is clear and allows reviewers to flag concerns.

 

Are there conditions attached to the engineering approval? — This branching question captures conditional approvals with details and deadlines, which is important for tracking outstanding items.

 

Does the engineering review require any further specialist input before installation begins? — Identifying specialist needs early helps avoid delays. The follow-up captures the type of specialist and, for structural engineers, the firm name.

 

Chief Building Engineer signature and Date of engineering sign-off — The signature and date formalise the engineering approval and create an auditable record.

 

Corporate Sustainability Director - full name, Corporate Sustainability Director - job title and Corporate Sustainability Director - work email — These fields identify the sustainability reviewer. As with the engineering block, name and email are mandatory.

 

Sustainability review checklist — This matrix covers six sustainability topics including emissions goals alignment, renewable energy availability, reporting readiness, fleet electrification alignment, end-of-life handling and employee engagement. This is a well-rounded assessment framework.

 

Estimated annual energy delivered to vehicles (megawatt-hours) and Estimated annual emissions reduction compared with the current travel baseline (tonnes of carbon dioxide equivalent) — These quantitative estimates support sustainability reporting and project justification. The units are standard and clearly specified.

 

How will the emissions estimate be calculated and recorded? — Methodology transparency is important for the credibility of emissions estimates. The options cover internal methods, external tools and energy mix data. The follow-up for energy mix captures the source and date.

 

Are there conditions attached to the sustainability approval? — Similar to the engineering block, this captures conditional approvals with tracking details.

 

Corporate Sustainability Director signature and Date of sustainability sign-off — These formalise the sustainability approval.

 

Both reviewers confirm that the information in this request has been examined within their area of responsibility — This checkbox serves as a joint confirmation of the review process.

 

Suggested date for the first post-installation review — Planning a follow-up review is a practical step that supports continuous improvement.

 

Final comments, conditions or follow-up actions — A free-text field captures any remaining items or observations.

 

Overall Strengths and Areas for Improvement

The form demonstrates several notable strengths. Its five-section structure follows a logical project workflow that mirrors real-world infrastructure planning, making it intuitive for facility teams to navigate. The extensive use of conditional follow-up questions ensures that respondents only see fields relevant to their specific circumstances, reducing form length and cognitive load. The inclusion of structured tables with formula columns (such as the parking zone allocation percentage and panel headroom calculations) provides immediate analytical value. Pre-populated example rows in tables help respondents understand the expected format and level of detail. The introductory paragraphs in each section set appropriate expectations and provide useful guidance without being prescriptive.

 

Areas that could be enhanced include the overall form length, which is substantial and may require multiple sessions to complete. Consider whether all sections need to be completed by the same respondent or whether different stakeholders could contribute to their respective sections independently. The form could benefit from a progress indicator or section-by-section save functionality to support completion over time. Additionally, while the conditional logic is extensive, some follow-up chains are quite deep (three or four levels), which could occasionally confuse respondents about where they are in the branching structure. A brief summary or checklist at the end of each section confirming what has been captured could help respondents verify completeness before moving on. Overall, the form is well designed for its intended purpose and provides a thorough framework for capturing the information needed to plan and authorise electric vehicle charging infrastructure projects at corporate sites.

 

Mandatory Question Analysis for EV Charging Infrastructure Installation & Grid Integration Intake Request Form

Important Note:

This section explains why certain fields in this form are marked as required and provides general guidance on how these requirements may support the collection of complete, accurate and relevant information.

Required fields and information-collection obligations may vary depending on your industry, jurisdiction, business operations and intended use of the form. A field marked as required in this template does not necessarily mean that collecting the information is legally mandatory.

Please review each required field to determine whether it is necessary, appropriate and lawful for your particular purpose. Consider applicable privacy, data protection, consent and industry-specific requirements, and consult an appropriately qualified legal, privacy or compliance professional where necessary.

Please delete this section before publishing your form. See our Terms of Service for further information.

 

Mandatory Question Analysis

Facility or site name
Requiring this field ensures each request can be clearly associated with a specific building or campus. A site name serves as the primary identifier throughout the project lifecycle and supports accurate record-keeping and project tracking. Form administrators should confirm whether the naming convention expected here aligns with their internal facility registry.

 

Requesting facility manager
Marking this field as mandatory establishes a clear point of contact for the request. Having a named requester supports follow-up communication and helps route the submission through the correct internal channels. The necessity of this field depends on the organisation's internal workflow, but capturing the initiating party generally supports accountability.

 

Facility manager contact email
Requiring an email address supports direct communication during the review process and may enable automated status notifications. It serves as a practical digital touchpoint for clarifications and updates. Depending on the organisation's data-handling practices, consider providing clear information about how submitted contact details will be used and stored.

 

Street address of the site
This field is essential for identifying the physical location of the proposed installation. The street address helps determine which local authority and electricity network operator will be involved in the approval and interconnection process. Requiring it ensures that the request can be properly geolocated from the outset.

 

City, town or municipality
The municipality helps narrow down the applicable local authority and any jurisdiction-specific processes. Requiring this field supports efficient routing of the request to the correct review body. It also aids in identifying the relevant electricity network operator for interconnection purposes.

 

Country or jurisdiction
The country or jurisdiction is a foundational data point that influences which operational, permitting and interconnection frameworks apply. Requiring this field ensures the reviewing team can contextualise the request correctly from the start. The specific requirements vary widely between locations, so this field helps set the appropriate frame of reference.

 

What best describes the site tenure arrangement?
Site tenure affects who has authority to approve physical alterations to the property. Requiring this field helps the project team identify early whether landlord consent, lease amendments or third-party approvals may be needed. The conditional follow-up questions then capture only the details relevant to each tenure type, which supports efficient data collection.

 

What type of parking provision does the site have?
Parking type directly influences equipment selection, mounting methods, ventilation requirements and safety provisions. Requiring this field ensures the design team has the basic physical context needed to assess feasibility. The follow-up questions for underground and podium structures capture additional detail only where relevant.

 

Total number of parking stalls on site
This figure establishes the overall scale of the parking provision and provides context for the charging allocation. Requiring it supports capacity planning and helps the reviewing team understand the proportion of stalls being converted to charging use. It also aids in future-phase planning.

 

Number of stalls proposed for electric vehicle charging in this phase
This is the core scope figure for the current request. Requiring it ensures the project team can size the electrical demand, equipment procurement and installation effort accurately. Without this number, the request cannot be meaningfully assessed for feasibility or budget.

 

Facility operating hours and main occupancy pattern
Operating hours and occupancy patterns inform charging demand estimates, access control needs and the feasibility of off-peak charging windows. Requiring this field helps the reviewing team understand when the facility is active and how many users may compete for charging resources. This operational context is important for load management and tariff design.

 

What is the site's main supply configuration?
The supply configuration (single-phase, three-phase, medium voltage, or multiple connections) fundamentally determines what charging equipment can be installed and how. Requiring this field ensures the electrical feasibility assessment has a starting point. The follow-up questions capture specific voltage and transformer details as needed.

 

Main switchboard or service protective device rating (amperes)
This figure establishes the upper bound of the site's electrical capacity and is a key input for all subsequent load calculations. Requiring it ensures the reviewing engineer has a baseline against which to assess available headroom. Without this figure, the feasibility of the proposed installation cannot be evaluated.

 

Estimated spare capacity available for new loads (amperes)
Spare capacity is the central feasibility question for any new electrical load. Requiring this field ensures the respondent has considered how much room exists on the existing supply. The form also captures the equivalent figure in kilowatts, allowing cross-checking. The necessity of this field depends on the form creator's intended review depth, but it is generally a critical input for engineering assessment.

 

Which charging power approach is proposed for this phase?
The charging power approach determines equipment type, cost, electrical demand and user experience. Requiring this field ensures the project team understands the intended technology direction early in the process. The follow-up questions capture unit counts and mix details for more complex scenarios.

 

Total number of charge points proposed in this phase
This figure, combined with the per-unit power rating, establishes the total electrical demand and procurement scope. Requiring it ensures the request can be properly sized and costed. It also supports comparison against the available spare capacity.

 

Which body is expected to review or approve the electrical work at this site?
Identifying the approving authority is a critical early step that affects project timeline and documentation requirements. Requiring this field ensures the respondent has at least begun to identify the applicable review route. The follow-up for Not yet identified includes an action item to assign someone to determine the correct authority.

 

Target date for submitting the main permit or notification
A target submission date establishes the project timeline and helps the reviewing team plan their own workload. Requiring this field ensures the respondent has considered the permitting schedule as part of the project plan. The other milestone dates (installation completion and energisation) are optional, reflecting that these may not yet be determined at the intake stage.

 

Which pricing model is proposed for charging at this site?
The pricing model determines the financial framework for the charging service and affects user communication, billing setup and cost recovery. Requiring this field ensures the project team has a clear direction on how charging will be monetised or subsidised. The Not yet decided option with an action-item checkbox acknowledges that this may still be under discussion.

 

How will access to the charging equipment be controlled?
Access control method affects user experience, security, billing integration and operational overhead. Requiring this field ensures the project team understands the intended access mechanism early in the design process. The follow-up questions capture integration details for badge systems, mobile applications and combined arrangements.

 

How should access to limited charging bays be allocated when demand exceeds supply?
Allocation policy is critical for user satisfaction, fairness and operational smoothness. Requiring this field ensures the project team has considered how contention for charging resources will be managed. The follow-up questions capture implementation details for each allocation approach, from booking systems to waiting lists.

 

Chief Building Engineer - full name
Requiring the engineering reviewer's name establishes clear accountability for the engineering sign-off. It creates an auditable record of who examined the technical aspects of the request. This supports internal governance and provides a point of contact for any follow-up on engineering conditions.

 

Chief Building Engineer - work email
A work email for the engineering reviewer supports direct communication regarding any conditions, clarifications or specialist input needed. Requiring this field ensures the reviewing team can reach the approver efficiently. It also supports the formal record-keeping associated with the sign-off process.

 

Chief Building Engineer signature
The signature formalises the engineering approval and creates an auditable record of the internal decision. Requiring it ensures the sign-off process is completed and documented. The form appropriately notes that this signature records an internal decision only and does not replace any external approval that may be required.

 

Date of engineering sign-off
Recording the date of sign-off establishes when the engineering review was completed. Requiring this field supports timeline tracking and helps identify when conditions attached to the approval need to be met. It also provides a clear chronological record for project files.

 

Corporate Sustainability Director - full name
Requiring the sustainability reviewer's name establishes clear accountability for the sustainability sign-off. It creates an auditable record of who examined the environmental and organisational alignment aspects of the request. This supports internal governance and provides a point of contact for follow-up on sustainability conditions.

 

Corporate Sustainability Director - work email
A work email for the sustainability reviewer supports direct communication regarding any conditions or follow-up actions. Requiring this field ensures the project team can reach the approver efficiently. It also supports formal record-keeping associated with the sign-off process.

 

Corporate Sustainability Director signature
The signature formalises the sustainability approval and creates an auditable record of the internal decision. Requiring it ensures the sign-off process is completed and documented. As with the engineering signature, the form notes that this records an internal decision only.

 

Date of sustainability sign-off
Recording the date of sign-off establishes when the sustainability review was completed. Requiring this field supports timeline tracking and helps identify when conditions attached to the approval need to be met. It provides a clear chronological record for project files.

 

Overall Mandatory Field Strategy Recommendation

The form contains 29 mandatory fields distributed across all five sections, with the heaviest concentration in Section 1 (11 mandatory fields) and Section 5 (8 mandatory fields). This distribution is broadly proportionate: Section 1 captures the foundational site and project data without which the request cannot be meaningfully reviewed, while Section 5 captures the sign-off details that formalise the internal authorisation. Sections 2, 3 and 4 each contain between 2 and 5 mandatory fields, focusing on the most critical technical, permitting and policy decisions.

 

Balancing data collection depth against user completion rates: The form is comprehensive and may require significant time to complete. While the mandatory fields are generally well chosen, the overall form length combined with 29 required fields could create friction, particularly if a single respondent is expected to complete all sections. Consider whether different stakeholders could be assigned to their respective sections, or whether a progress-saving mechanism could allow completion across multiple sessions. The optional fields are appropriately numerous and provide depth without creating barriers.

 

Potential use of conditional logic: The form already makes extensive use of conditional follow-up questions, which is a significant strength. This approach ensures that detailed information is collected only when relevant, reducing unnecessary form length. The branching chains in Sections 1 through 4 are generally well structured, though some chains reach three or four levels of depth. Reviewers may wish to test these chains to ensure respondents can follow the branching without losing their place.

 

Best practices for mandatory field selection and placement: The mandatory fields are logically distributed and generally appear early in their respective sections, which is a sound practice. Respondents encounter the required items before optional detail fields, helping them understand the minimum information needed. The sign-off section in particular follows a clear pattern: name and email are required, while job title and phone number are optional. This is a sensible approach that captures the essential identity and contact information without over-collecting.

 

Overarching observations: With 29 mandatory fields, the form requires a substantial commitment from respondents. This is understandable given the complexity and scope of an electric vehicle charging infrastructure project, but form administrators should monitor completion rates and consider whether any mandatory fields could be relaxed to optional without significantly affecting data quality. For example, some of the address sub-fields (such as postal code and subnational region) are already optional, which is a pragmatic choice. The mandatory fields in Section 5 are largely identity and sign-off items, which are appropriate to require given their role in establishing accountability. Overall, the mandatory field strategy is well aligned with the form's purpose and the information needed to support a thorough project review.

 

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.