Corporate Office EV Charging Infrastructure: Comprehensive Intake & Authorization Request

1. Section 1: Facility Location & Parking Structure Zone Metadata

Provide detailed information about your facility and the specific parking zones where EV charging infrastructure will be installed. Accurate metadata ensures proper planning and installation.

 

Facility Official Name

Facility Complete Address

Facility Identification Code (if applicable)

Facility Ownership Status

Total Facility Gross Floor Area (square meters)

 

Parking Structure Overview

 

Primary Parking Structure Type

Total Number of Parking Spaces in Facility

Number of Parking Levels or Zones

Is the parking facility accessible to the public?

 

Describe public access hours and restrictions:

 

Proposed EV Charging Installation Zone Details

 

Proposed Zone Identifier or Name

Number of Parking Spaces in Proposed Zone

Maximum Number of EV Chargers Planned for This Zone

Installation Area Environment

Is there existing electrical infrastructure in the proposed zone?

 

Describe existing infrastructure (panels, conduits, capacity):

Will installation require structural modifications?

 

Describe required structural modifications:

Are there waterproofing or drainage considerations?

 

Describe waterproofing requirements:

Is the installation zone designated for accessibility-compliant parking?

 

How many accessible spaces will be equipped with chargers?

Does the zone have existing network/communications cabling?

 

Describe network infrastructure available:

Are there plans for future expansion beyond this initial installation?

 

Describe future expansion plans and timeline:

Upload Site Plan or Parking Layout Map (showing proposed zone)

Choose a file or drop it here

Upload Photographs of Proposed Installation Area (minimum 3 angles)

Choose a file or drop it here

Upload Existing Electrical Drawings (if available)

Choose a file or drop it here
 

2. Section 2: Power Grid Capacity, Amperage Draw & Load-Balancing Audit

Provide comprehensive details about current electrical infrastructure and projected load from EV charging. This audit determines grid readiness and identifies required upgrades.

 

Main Electrical Service Provider/Grid Operator Name

Main Service Capacity (kVA)

Main Service Voltage (V)

Electrical Service Phase Configuration

Number of Existing Main Distribution Panels

 

Current Load Profile Analysis

 

Average Baseline Electrical Load (kW)

Peak Historical Demand (kW)

Date/Time of Peak Demand Recording

Current Spare Capacity at Peak (kW)

Do you have 12 months of interval meter data available?

 

Upload Interval Meter Data File (CSV or Excel format)

Choose a file or drop it here
 
 

Proposed EV Charging Equipment Specifications

 

EV Charger Configuration Details

Charger Model/Type

Quantity

Power per Unit (kW)

Voltage (V)

Max Current per Unit (A)

Connector Type(s)

Dynamic Load Management Capable?

A
B
C
D
E
F
G
1
Level 2 AC Charger - Dual Port
8
22
400
32
Type 2
Yes
2
DC Fast Charger - Single Port
2
150
400
217
CCS2
Yes
3
Level 2 AC Charger - Single Port
2
7.4
230
32
Type 2
 
4
 
 
 
 
 
 
 
5
 
 
 
 
 
 
 
6
 
 
 
 
 
 
 
7
 
 
 
 
 
 
 
8
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
10
 
 
 
 
 
 
 

Total Simultaneous Maximum Draw (kW)

Total Simultaneous Maximum Current (A)

Will this installation require main service upgrade?

 

Describe required service upgrade scope:

Will additional transformers be required?

 

Specify transformer specifications and locations:

Is load-balancing or dynamic load management planned?

 

Load Management Strategy

Will on-site energy storage (battery) be integrated?

 

Describe energy storage capacity and integration strategy:

Will renewable energy generation (solar/wind) supplement charging?

 

Describe renewable generation capacity and configuration:

Is backup generator power available for emergency charging?

 

Describe generator capacity and automatic transfer switch availability:

Technical Risk Assessment - Rate the following concerns

Very Low Risk

Low Risk

Medium Risk

High Risk

Very High Risk

Voltage drop over cable runs

Harmonic distortion from chargers

Grid stability impact

Equipment overheating risk

Cybersecurity vulnerabilities

Upload Preliminary Single Line Diagram (SLD)

Choose a file or drop it here
 

Upload Load Calculation Summary Report

Choose a file or drop it here
 

3. Section 3: Municipal Electrical Permitting & Local Utility Interconnection Review

Detail all regulatory, permitting, and utility coordination requirements. This section ensures compliance with local authorities and grid operators.

 

Are municipal electrical permits required for this installation?

 

List all required permit types and issuing authorities:

Permit Application Status

Primary Municipal Authority Contact Name

Authority Organization Name

Authority Contact Email

Authority Contact Phone

Expected Permit Approval Date

Estimated Total Permit Fees

Is the facility located in a special regulatory zone?

 

Select all applicable special zones:

 

Utility Interconnection Requirements

 

Local Distribution Utility Company Name

Utility Account Number for Facility

Has formal interconnection application been submitted to utility?

 

Utility Interconnection Application Reference Number:

 

Explain delay and planned submission date:

Utility Interconnection Study Requirements

Utility Interconnection Approval Deadline

Will the installation include export to grid (V2G capability)?

 

Describe V2G export capacity and revenue metering arrangement:

Are there grid reinforcement costs to be borne by project?

 

Estimated Utility Grid Reinforcement Cost:

Is a power quality impact study required?

 

Describe study scope and consultant details:

Are there export power limitations imposed by utility?

 

Describe export limitations and curtailment conditions:

Is a witness test or inspection required by utility before energization?

 

Describe witness test requirements and scheduling constraints:

Does the project require third-party technical certification?

 

Select required certification types:

Describe any known regulatory barriers or special approval conditions:

Regulatory Submission Timeline Tracker

Submission Item

Planned Submission Date

Actual Submission Date

Expected Approval Date

Responsible Party

Associated Fees

A
B
C
D
E
F
1
Municipal Electrical Permit
7/15/2025
 
8/30/2025
Facility Management
$2,500.00
2
Utility Interconnection Application
7/1/2025
 
9/15/2025
Electrical Engineer
$0.00
3
Fire Safety Approval
7/20/2025
 
8/20/2025
Safety Officer
$1,500.00
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

4. Section 4: Employee Tariff Structure, Access Rules & Payment Gateway Setup

Define the operational model for employee and visitor access, pricing, payment processing, and energy cost allocation. This establishes the user experience and financial framework.

 

Intended User Groups (select all that apply)

Will charging be offered free to employees?

 

Describe corporate subsidy arrangement and budget allocation:

 

Tariff Model

Will time-of-use pricing be implemented?

 

Time-of-Use Rate Schedule

Time Period

Start Time

End Time

Rate per kWh

Session Fee

A
B
C
D
E
1
Off-Peak Overnight
10:00 PM
6:00 AM
$0.12
$0.00
2
Mid-Peak Daytime
6:00 AM
4:00 PM
$0.18
$0.50
3
Peak Evening
4:00 PM
10:00 PM
$0.25
$1.00
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Will there be different tariffs for different user groups?

 

Describe differential pricing structure:

Primary Access Control Method

Will reservations be required or allowed?

 

Describe reservation policy, time limits, and no-show penalties:

Maximum Charging Session Duration (hours)

Will idle fees apply after charging completes?

 

Idle Fee Rate (per minute):

 

Payment Gateway & Financial Integration

 

Will payment processing be handled internally or externally?

 

Describe internal payment processing system and PCI compliance status:

 

External Payment Processor Provider Name:

Will charging costs be integrated with employee payroll deduction?

 

Describe payroll integration process and accounting codes:

Will corporate sustainability incentives or subsidies apply?

 

Describe incentive program details:

Is VAT/sales tax recovery applicable for business use?

 

Describe tax treatment and documentation requirements:

Will multi-tenant cost allocation be required?

 

Describe allocation methodology and metering arrangement:

 

Energy Management & Reporting

 

Will chargers be enrolled in utility demand response programs?

 

Describe demand response capacity and curtailment agreements:

Is real-time energy monitoring and reporting required?

 

Select required reporting features:

Will renewable energy certificates (RECs) be tracked for green charging?

 

Describe REC tracking and attribution method:

Describe any additional operational policies (e.g., fair use, priority access, visitor etiquette):

Upload Draft User Terms & Conditions Document

Choose a file or drop it here
 

5. Section 5: Chief Building Engineer & Corporate Sustainability Director Sign-Off

Final authorization requires technical validation from the Chief Building Engineer and strategic approval from the Corporate Sustainability Director. Complete all attestations and attach supporting documentation.

Chief Building Engineer Technical Validation

 

Chief Building Engineer Full Name

Professional Engineering License Number (if applicable)

Engineer Email Address

Technical Feasibility Assessment - Chief Engineer Rating

Not Feasible

Major Concerns

Moderate Concerns

Minor Concerns

Fully Feasible

Electrical capacity adequacy

Structural integrity of installation zones

Network/communications infrastructure readiness

Safety and code compliance

Maintainability and access for repairs

Chief Engineer Technical Comments and Reservations:

Does the Chief Engineer approve the technical design as submitted?

 

List required design modifications for re-submission:

 

Corporate Sustainability Director Strategic Approval

 

Corporate Sustainability Director Full Name

Director Email Address

Estimated Annual CO2 Emissions Avoided (metric tons)

Percentage of Corporate Fleet Targeted for Electrification

Does this project align with corporate carbon neutrality goals?

 

Explain misalignment and required goal adjustment:

Has the project budget been approved by Finance?

 

Budget Approval Reference Number:

 

Explain budget status and expected approval timeline:

Have all stakeholders been consulted (HR, IT, Legal, Facilities)?

 

List outstanding stakeholder consultations needed:

Is a pilot program recommended before full deployment?

 

Describe pilot scope, timeline, and success metrics:

Sustainability Director Strategic Comments:

Does the Sustainability Director approve the project as submitted?

 

List required strategic modifications for re-submission:

 

Final Authorization & Risk Acknowledgment

 

I acknowledge that all information provided is accurate to the best of my knowledge

I acknowledge that project delays may occur due to regulatory or utility approval processes beyond our control

I acknowledge that final costs may vary based on actual site conditions and utility requirements

I confirm that maintenance and operations responsibilities have been assigned post-installation

 

Describe maintenance responsibility assignment:

Chief Building Engineer Digital Signature

Corporate Sustainability Director Digital Signature

Authorization Date

Upload Signed Project Charter or Authorization Memo

Choose a file or drop it here
 

Upload Risk Register and Mitigation Plan