Comprehensive Lease Closeout & Final Walk-Through Inspection Report for Commercial Properties

1. Section 1: Lease Agreement & Demised Premises Metadata

This section captures all contractual and identification details necessary to establish the legal framework for the lease termination and closeout process.


Master Lease Agreement Reference Number

Premises Identification Code

Complete Demised Premises Address

Total Demised Area (Square Feet/Square Meters)

Total Usable Area (Square Feet/Square Meters)

Primary Tenant Legal Entity Name

Tenant Authorized Representative Full Name

Tenant Authorized Representative Position Title

Property Manager Full Name

Property Management Company Legal Name

Original Lease Commencement Date

Original Lease Expiration Date


Actual Lease Termination Date (if different from expiration)

Has the tenant provided written notice of termination as required by the lease agreement?


Original Condition Documentation Reference (e.g., move-in report, photographs)

Handover Documentation Reference (if applicable)

Total Number of Physical Keys Provided to Tenant

Total Number of Access Cards/Fobs Provided to Tenant

Total Number of Parking Spaces Allocated

Total Number of Storage Units Allocated


Did the lease include signage rights?


Was the tenant required to maintain liability insurance throughout the lease term?


Did the tenant sublease any portion of the premises?


2. Section 2: Physical Structural Alteration & Dilapidations Audit

Conduct a meticulous inspection of all physical elements to identify alterations, damage, and deviations from original condition. Document all findings with photographic evidence.


Were any structural alterations made during the tenancy?


Structural Elements Condition Assessment

Element Type

Location/Area

Condition Status

Estimated Restoration Cost

Photographic Evidence Captured?

Detailed Observations & Notes

Load-Bearing Walls
North perimeter, West perimeter
Original Condition
$0.00
Yes
No visible damage or alterations
Partition Walls
Interior office areas
Altered - Requires Restoration
$3,500.00
Yes
Non-permanent partitions installed, require removal
Ceiling System
Main office area
Normal Wear & Tear
$800.00
Yes
Minor scuff marks and discoloration
Flooring - Carpet
Office zones
Damage Requiring Repair
$4,200.00
Yes
Stains and tears in high-traffic areas
Flooring - Hardwood
Reception area
Normal Wear & Tear
$1,200.00
Yes
Light scratches, refinishing recommended
Windows & Glazing
Exterior facade
Original Condition
$0.00
Yes
No damage, all seals intact
Doors & Frames
Interior and exterior
Damage Requiring Repair
$1,800.00
Yes
Dents on two metal doors, lock damage
HVAC Ductwork
Ceiling plenum
Altered - Acceptable
$0.00
Yes
Additional vents installed with approval
 
 
 
 
 
 
 
 
 
 
 
 

Are there any signs of water damage, mold, or moisture intrusion?


Were all mechanical, electrical, and plumbing (MEP) systems restored to original configuration?


Is there any evidence of unauthorized signage, branding, or tenant-specific markings remaining on the premises?


Have all tenant-installed fixtures, furniture, and equipment (FF&E) been removed?


Have all data and telecommunications cabling been removed or properly abandoned-in-place?


Are there any hazardous materials present (e.g., asbestos, lead paint, chemical residues)?


Were professional inspections conducted (e.g., structural engineer, environmental consultant)?


3. Section 3: Utility Decommissioning & Facility Sub-Meter Verification

Verify all utility accounts are properly closed or transferred, record final meter readings, and confirm decommissioning of all systems.


Primary Utility Account Status & Final Readings

Utility Type

Account Number

Provider Name

Account Closure/Transfer Date

Final Meter Reading

Reading Units

Final Bill Received?

Final Bill Amount

Electricity
ELEC-98765-GB
Metro Power Co.
8/20/2024
45892
kWh
Yes
$3,420.50
Natural Gas
GAS-55432-GB
City Gas Utility
8/20/2024
12845
therms
Yes
$890.30
Water
WTR-22345-GB
Regional Water Auth.
8/20/2024
9876
gallons
 
$0.00
Data/Telecom
TEL-66778-GB
Global Data Corp
8/18/2024
0
N/A
Yes
$125.00
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Does the premises have sub-metering for individual systems or departments?


Have all HVAC systems been properly decommissioned and shut down?


Have all specialized systems (e.g., server cooling, refrigeration, process equipment) been decommissioned?


Are there any shared utility services with adjacent tenants that require special handling?


Have all final utility readings been jointly verified with the tenant representative?


Have all utility disconnections been completed in compliance with safety regulations?


Are there any outstanding utility liens or encumbrances on the premises?


4. Section 4: Restoration Cost Assessment & Security Deposit Settlement Calculation

Calculate all costs associated with restoring the premises to original condition and determine the final security deposit settlement amount.


Total Security Deposit Held

Total Prepaid Rent Credit (if applicable)


Detailed Restoration Cost Breakdown

Cost Category

Scope of Work Description

Labor Cost Estimate

Material Cost Estimate

Professional/Permit Fees

Subtotal

Contingency Percentage (%)

Total with Contingency

Partition Removal
Remove all non-permanent office partitions
$2,800.00
$1,200.00
$450.00
$4,450.00
10
$4,895.00
Flooring Replacement
Replace damaged carpet and refinish hardwood
$3,200.00
$5,800.00
$0.00
$9,000.00
15
$10,350.00
MEP Restoration
Restore electrical and plumbing to original layout
$4,500.00
$2,800.00
$650.00
$7,950.00
12
$8,904.00
Painting
Repaint all walls and ceiling to base building standard
$3,800.00
$2,100.00
$0.00
$5,900.00
8
$6,372.00
Cleaning
Deep clean and debris removal
$1,500.00
$800.00
$0.00
$2,300.00
5
$2,415.00
Signage Removal
Remove all tenant signage and repair facade
$2,200.00
$1,100.00
$300.00
$3,600.00
10
$3,960.00
HVAC Balancing
Rebalance HVAC system after partition removal
$1,800.00
$600.00
$0.00
$2,400.00
7
$2,568.00
 
 
 
 
 
 
 
$0.00
 
 
 
 
 
 
 
$0.00
 
 
 
 
 
 
 
$0.00

Are there any outstanding rent arrears or late fees?


Are there any unpaid common area maintenance (CAM) charges or operating expense reconciliations?


Are there any legal or administrative fees associated with the closeout process?


Total Restoration Costs (Auto-Calculated)

Total Deductions and Offsets (Auto-Calculated)

Net Security Deposit Refund Due to Tenant (Auto-Calculated)

Does the tenant dispute any of the assessed restoration costs?


Security Deposit Settlement Method


Has the tenant provided forwarding address for refund and final communications?


Are there any third-party claims on the security deposit (e.g., sublandlord, lender)?


5. Section 5: Property General Manager & Leasing Director Clearance Sign-Off

Final verification and approval section to confirm all closeout requirements have been satisfied and authorize release of security deposit settlement.


Have all Sections 1-4 been completed in full?


Have all mandatory photographs and supporting documentation been collected and archived?


Are there any outstanding tenant obligations that would prevent clearance?


Has the tenant returned all keys, access cards, and parking transponders?


Has the premises been officially vacated and is ready for re-leasing?


Has a final walk-through been conducted with tenant representation present?


Property General Manager Full Name

Property General Manager Position Title

Property General Manager Review Date

Property General Manager Digital Signature

Does the Property General Manager approve the closeout and settlement calculation?


Leasing Director Full Name

Leasing Director Position Title

Leasing Director Review Date

Leasing Director Digital Signature

Does the Leasing Director concur with the closeout approval and settlement?


General Manager Comments and Final Notes

Leasing Director Comments and Re-Leasing Strategy Notes

Should this closeout be flagged for process improvement review?


Final Documentation Package Reference Number

Has the complete documentation package been archived in the property management system?


New high score unlocked: ‘Form Awesomeness.’ Press EDIT to play! Edit this Commercial Lease Closeout & Final Walk-Through Inspection Form
This form's the trailer... Zapof is the IMAX 3D premiere! 🍿
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof