Comprehensive Lease Closeout & Final Walk-Through Inspection Report for Commercial Properties

1. Section 1: Lease Agreement & Demised Premises Metadata

This section captures all contractual and identification details necessary to establish the legal framework for the lease termination and closeout process.

 

Master Lease Agreement Reference Number

Premises Identification Code

Complete Demised Premises Address

Total Demised Area (Square Feet/Square Meters)

Total Usable Area (Square Feet/Square Meters)

Primary Tenant Legal Entity Name

Tenant Authorized Representative Full Name

Tenant Authorized Representative Position Title

Property Manager Full Name

Property Management Company Legal Name

Original Lease Commencement Date

Original Lease Expiration Date

Actual Lease Termination Date (if different from expiration)

Has the tenant provided written notice of termination as required by the lease agreement?

 

Date written notice was received

 

Explain circumstances and any penalties applied:

Original Condition Documentation Reference (e.g., move-in report, photographs)

Handover Documentation Reference (if applicable)

Total Number of Physical Keys Provided to Tenant

Total Number of Access Cards/Fobs Provided to Tenant

Total Number of Parking Spaces Allocated

Total Number of Storage Units Allocated

Did the lease include signage rights?

 

Describe signage installed and restoration requirements:

Was the tenant required to maintain liability insurance throughout the lease term?

 

Final insurance certificate expiration date

Did the tenant sublease any portion of the premises?

 

Provide sublease details and confirmation of subtenant move-out:

2. Section 2: Physical Structural Alteration & Dilapidations Audit

Conduct a meticulous inspection of all physical elements to identify alterations, damage, and deviations from original condition. Document all findings with photographic evidence.

 

Were any structural alterations made during the tenancy?

 

List all structural alterations requiring landlord approval and provide permit numbers:

Structural Elements Condition Assessment

Element Type

Location/Area

Condition Status

Estimated Restoration Cost

Photographic Evidence Captured?

Detailed Observations & Notes

A
B
C
D
E
F
1
Load-Bearing Walls
North perimeter, West perimeter
Original Condition
$0.00
Yes
No visible damage or alterations
2
Partition Walls
Interior office areas
Altered - Requires Restoration
$3,500.00
Yes
Non-permanent partitions installed, require removal
3
Ceiling System
Main office area
Normal Wear & Tear
$800.00
Yes
Minor scuff marks and discoloration
4
Flooring - Carpet
Office zones
Damage Requiring Repair
$4,200.00
Yes
Stains and tears in high-traffic areas
5
Flooring - Hardwood
Reception area
Normal Wear & Tear
$1,200.00
Yes
Light scratches, refinishing recommended
6
Windows & Glazing
Exterior facade
Original Condition
$0.00
Yes
No damage, all seals intact
7
Doors & Frames
Interior and exterior
Damage Requiring Repair
$1,800.00
Yes
Dents on two metal doors, lock damage
8
HVAC Ductwork
Ceiling plenum
Altered - Acceptable
$0.00
Yes
Additional vents installed with approval
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Are there any signs of water damage, mold, or moisture intrusion?

 

Describe location, extent, and suspected cause of water damage:

Were all mechanical, electrical, and plumbing (MEP) systems restored to original configuration?

 

MEP Systems Requiring Restoration

System Type

Specific Component

Alteration Description

Estimated Restoration Cost

Requires Licensed Contractor?

A
B
C
D
E
1
Electrical
Additional circuits
Three new 20A circuits added for server room
$2,800.00
Yes
2
Plumbing
Sink relocation
Kitchenette sink moved 15 feet, requires pipe rerouting
$3,500.00
Yes
3
Mechanical
Thermostat addition
Two wireless thermostats installed for zoned control
$900.00
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Is there any evidence of unauthorized signage, branding, or tenant-specific markings remaining on the premises?

 

Describe all remaining markings and removal requirements:

Have all tenant-installed fixtures, furniture, and equipment (FF&E) been removed?

 

List all remaining items and disposal plan:

Have all data and telecommunications cabling been removed or properly abandoned-in-place?

 

Describe cabling location and remediation required:

Are there any hazardous materials present (e.g., asbestos, lead paint, chemical residues)?

 

Describe material type, location, and required remediation protocol:

Were professional inspections conducted (e.g., structural engineer, environmental consultant)?

 

Professional Inspection Reports

Inspection Type

Professional/Company Name

Inspection Date

Report Reference Number

Issues Identified?

Recommended Remediation Cost

A
B
C
D
E
F
1
Structural
ABC Engineering
7/15/2024
SE-2024-0789
 
$0.00
2
Environmental
SafeEnviro Consultants
7/18/2024
ENV-2024-1123
Yes
$7,500.00
3
 
 
 
 
 
 
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

3. Section 3: Utility Decommissioning & Facility Sub-Meter Verification

Verify all utility accounts are properly closed or transferred, record final meter readings, and confirm decommissioning of all systems.

 

Primary Utility Account Status & Final Readings

Utility Type

Account Number

Provider Name

Account Closure/Transfer Date

Final Meter Reading

Reading Units

Final Bill Received?

Final Bill Amount

A
B
C
D
E
F
G
H
1
Electricity
ELEC-98765-GB
Metro Power Co.
8/20/2024
45892
kWh
Yes
$3,420.50
2
Natural Gas
GAS-55432-GB
City Gas Utility
8/20/2024
12845
therms
Yes
$890.30
3
Water
WTR-22345-GB
Regional Water Auth.
8/20/2024
9876
gallons
 
$0.00
4
Data/Telecom
TEL-66778-GB
Global Data Corp
8/18/2024
0
N/A
Yes
$125.00
5
 
 
 
 
 
 
 
 
6
 
 
 
 
 
 
 
 
7
 
 
 
 
 
 
 
 
8
 
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
 
10
 
 
 
 
 
 
 
 

Does the premises have sub-metering for individual systems or departments?

 

Sub-Meter Final Readings Verification

Sub-Meter ID

System/Area Served

Final Reading

Reading Units

Reading Verified by Tenant?

Comments/Discrepancies

A
B
C
D
E
F
1
ELEC-SUB-01
Server Room
12567
kWh
Yes
No discrepancies noted
2
ELEC-SUB-02
Kitchenette
3421
kWh
Yes
Minor variance, tenant acknowledged
3
WTR-SUB-01
Restroom 1
567
gallons
Yes
Final reading confirmed
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Have all HVAC systems been properly decommissioned and shut down?

 

Describe systems still active and decommissioning plan:

Have all specialized systems (e.g., server cooling, refrigeration, process equipment) been decommissioned?

 

List remaining equipment and removal responsibility:

Are there any shared utility services with adjacent tenants that require special handling?

 

Describe shared service arrangement and separation status:

Have all final utility readings been jointly verified with the tenant representative?

 

Explain verification method and any disputes:

Have all utility disconnections been completed in compliance with safety regulations?

 

Describe outstanding safety concerns:

Are there any outstanding utility liens or encumbrances on the premises?

 

Detail each lien including amount and resolution status:

4. Section 4: Restoration Cost Assessment & Security Deposit Settlement Calculation

Calculate all costs associated with restoring the premises to original condition and determine the final security deposit settlement amount.

 

Total Security Deposit Held

Total Prepaid Rent Credit (if applicable)

Detailed Restoration Cost Breakdown

Cost Category

Scope of Work Description

Labor Cost Estimate

Material Cost Estimate

Professional/Permit Fees

Subtotal

Contingency Percentage (%)

Total with Contingency

A
B
C
D
E
F
G
H
1
Partition Removal
Remove all non-permanent office partitions
$2,800.00
$1,200.00
$450.00
$4,450.00
10
$4,895.00
2
Flooring Replacement
Replace damaged carpet and refinish hardwood
$3,200.00
$5,800.00
$0.00
$9,000.00
15
$10,350.00
3
MEP Restoration
Restore electrical and plumbing to original layout
$4,500.00
$2,800.00
$650.00
$7,950.00
12
$8,904.00
4
Painting
Repaint all walls and ceiling to base building standard
$3,800.00
$2,100.00
$0.00
$5,900.00
8
$6,372.00
5
Cleaning
Deep clean and debris removal
$1,500.00
$800.00
$0.00
$2,300.00
5
$2,415.00
6
Signage Removal
Remove all tenant signage and repair facade
$2,200.00
$1,100.00
$300.00
$3,600.00
10
$3,960.00
7
HVAC Balancing
Rebalance HVAC system after partition removal
$1,800.00
$600.00
$0.00
$2,400.00
7
$2,568.00
8
 
 
 
 
 
 
 
$0.00
9
 
 
 
 
 
 
 
$0.00
10
 
 
 
 
 
 
 
$0.00

Are there any outstanding rent arrears or late fees?

 

Total Outstanding Rent Arrears

Are there any unpaid common area maintenance (CAM) charges or operating expense reconciliations?

 

Total Outstanding CAM/Operating Expenses

Are there any legal or administrative fees associated with the closeout process?

 

Total Legal/Administrative Fees

Total Restoration Costs (Auto-Calculated)

Total Deductions and Offsets (Auto-Calculated)

Net Security Deposit Refund Due to Tenant (Auto-Calculated)

Does the tenant dispute any of the assessed restoration costs?

 

Detail disputed items and tenant's proposed resolution:

Security Deposit Settlement Method

 

Provide detailed justification for each deduction:

 

Expected resolution date

Has the tenant provided forwarding address for refund and final communications?

 

Explain communication plan for settlement:

Are there any third-party claims on the security deposit (e.g., sublandlord, lender)?

 

Detail claimant information and legal basis:

5. Section 5: Property General Manager & Leasing Director Clearance Sign-Off

Final verification and approval section to confirm all closeout requirements have been satisfied and authorize release of security deposit settlement.

 

Have all Sections 1-4 been completed in full?

 

Identify incomplete sections and action items:

Have all mandatory photographs and supporting documentation been collected and archived?

 

List missing documentation and timeline for completion:

Are there any outstanding tenant obligations that would prevent clearance?

 

Detail outstanding obligations and remediation plan:

Has the tenant returned all keys, access cards, and parking transponders?

 

List unreturned items and associated replacement costs:

Has the premises been officially vacated and is ready for re-leasing?

 

Describe barriers to re-leasing and timeline:

Has a final walk-through been conducted with tenant representation present?

 

Final joint inspection date

 

Explain why joint inspection was not possible and documentation method used:

Property General Manager Full Name

Property General Manager Position Title

Property General Manager Review Date

Property General Manager Digital Signature

Does the Property General Manager approve the closeout and settlement calculation?

 

Provide reasons for non-approval and required corrections:

Leasing Director Full Name

Leasing Director Position Title

Leasing Director Review Date

Leasing Director Digital Signature

Does the Leasing Director concur with the closeout approval and settlement?

 

Detail concerns or alternative recommendations:

General Manager Comments and Final Notes

Leasing Director Comments and Re-Leasing Strategy Notes

Should this closeout be flagged for process improvement review?

 

Describe issues encountered and recommendations for future leases:

Final Documentation Package Reference Number

Has the complete documentation package been archived in the property management system?

 

Explain archival timeline and location:

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.