Critical Crane Lift High-Risk Clearance Permit

I. General Project & Site Information

Project Name

Project Location / Area

General Contractor / Employer

Lifting Subcontractor

Permit Date

Permit Valid Time Period

Start

End

Specific Location of Lift

Description of Load / Work

II. Critical Lift Categorization

Select all conditions that trigger this critical lift permit

III. Key Personnel & Responsibilities

Role

Name

Phone Number

Certification #

Certification Exp

Lift Director
 
 
 
 
Crane Operator
 
 
 
 
Primary Signal Person
 
 
 
 
Lead Rigger
 
 
 
 
Site Safety Manager
 
 
 
 

IV. Crane & Equipment Specifications

Crane Identification & Configuration

Crane Make & Model

Crane Type

Crane Serial / Equipment ID

Third-Party Annual Inspection Date

Counterweight Installed (tons)

Main Boom Length (m)

Jib Length (m)

Jib Angle (°)

Outrigger Extension

V. Weight Verification & Capacity Analysis

A. Load Calculations

Weight of Load / Object (kg)

Source of weight

Weight of Main Hook Block & Ball (kg)

Weight of Rigging Hardware (slings, shackles, spreader bars) (kg)

Weight of Jib / Boom Attachments (effective weight) (kg)

Weight of Hoist Cable below Boom Tip (kg)

Total Gross Load Weight (kg)

0

B. Crane Capacity & Margin

Maximum Planned Operating Radius (m)

Crane Rated Capacity at Max Radius (from Chart) (kg)

Percentage of Rated Capacity

​

Critical Threshold Policy: Lifts exceeding 85% capacity require written concurrence from a certified Professional Engineer (PE). Lifts exceeding 100% capacity are strictly prohibited.

VI. Site & Environmental Safety Pre-Checks

Check Pass, Fail, or N/A for each requirement:

Safety Requirement

Pass

Fail

N/A

1

Ground & Soil Conditions: Ground compaction tested or matting installed per engineered bearing capacity calculations.

2

Outrigger Cribbing/Pads: Steel plates or engineered timber mats properly sized and placed under outrigger floats.

3

Underground Hazards: Location of underground utilities, vaults, pipes, or voids verified and clear of outriggers.

4

Power Line Distances: Minimum approach distance maintained per OSHA Table T-1 (e.g., 20 ft for up to 350 kV).

5

Weather & Wind Limits: Sustained wind speed is below maximum manufacturer limit

6

Rigging Inspection: All slings, shackles, spreader beams, and eye bolts inspected and tagged with safe working load (SWL).

7

Tag Lines: Minimum of two tag lines available and assigned to control load rotation.

8

Exclusion Zone: Drop zone barricaded with warning tape; unauthorized personnel cleared from area.

9

Communications: Two-way radios tested on dedicated channel, or visual signals agreed upon by Operator and Signal Person.

10

Safety Devices: Anti-Two Block (A2B) device, boom angle indicator, and LMI (Load Moment Indicator) operational and calibrated.

VII. Pre-Lift Safety Briefing Checklist

Before lifting, the Lift Director must conduct a mandatory toolbox talk with all involved personnel.

VIII. Sign-Off & Approvals

By signing below, all parties confirm that the pre-lift checks are complete, calculations are verified, and conditions are safe to perform the critical lift.

1. Lift Director Approval

I certify that I have inspected the lift site, reviewed the critical lift plan, verified all load calculations, and conducted the pre-lift briefing.


Lift Director Signature

2. Crane Operator Acknowledgment

I confirm that I have reviewed the crane capacity chart, inspected the crane safety devices, and agree that the lift can be performed safely under current site conditions.


Crane Operator Signature

3. Site Safety Manager / Authority Having Jurisdiction (AHJ)

This Critical Crane Lift Permit is approved based on the verified safety measures and conditions noted above.


Site Safety Manager / Authority Having Jurisdiction Signature

IX. Post-Lift Closure & Sign-Out

To be completed immediately following the conclusion of the lifting operation.

Lift Director Post-Lift Signature

This form is dough—your edits are the toppings! What masterpiece will YOU create? 🍕🎨 Edit this Critical Crane Lift High-Risk Clearance Permit Form
Need a form that's both brainy and a breeze to use? Zapof's got the smarts with tables that auto-calculate and have all those cool spreadsheet gadgets!
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof