This form helps us recommend stainless steel cabinetry, fume hoods, ESD-safe seating or modular cleanroom partitions that meet your contamination-control and ergonomic goals. Mandatory questions are marked.
Company/Organisation Name
Your role in this project
End-user/Operator
Contractor/Installer
Distributor/Reseller
Consultant
OEM Integrator
Other:
Project codename or reference
Brief description of the product(s) you need
Target industries (select all that apply)
Biotechnology/Pharma
Medical Device
Aerospace
Electronics/Semiconductor
Food & Beverage
Chemical
Academic/R&D
Other
Other:
GMP/ISO classification of controlled space
ISO 5 / Grade A
ISO 6 / Grade B
ISO 7 / Grade C
ISO 8 / Grade D
ISO 9 (controlled, not classified)
Not applicable/Uncontrolled
Applicable standards & guidelines
ISO 14644
FDA 21 CFR Part 211
EU GMP Annex 1
ICH Q7
SEMI S2
NASA-STD-5005
USP <797>/<800>
OSHA/local safety
Other:
Do you require third-party certification documentation?
Choose materials that will survive your chemicals and cleaning regime without particle shedding or corrosion.
Preferred stainless steel grade
304 (general)
316L (low carbon, molybdenum)
316L electro-polished
Duplex 2205
904L
Not sure/need advice
List primary chemicals/disinfectants used
Any chloride exposure (>80 ppm) or coastal site?
Surface finish requirement
Mill finish
180 grit brushed
240 grit brushed
Ra ≤0.4 µm
Ra ≤0.25 µm
Electropolished
Need guidance
Maximum acceptable particle count >0.5 µm per m³ during operation
Antimicrobial coating required?
Type of ventilation
Not needed/open bench
Ducted fume hood
Ductless fume hood
Laminar flow cabinet
Biological safety cabinet
Pass-through with purge
Custom air-tight enclosure
Is this replacing an existing unit?
Required face velocity (m/s)
Maximum allowable differential pressure (Pa) to adjacent room
Exhaust treatment needed
None
HEPA
Carbon
Scrubber
Thermal oxidiser
Need advice
Variable air volume (VAV) control required?
Alarm integration into BMS?
Available duct size/material
Do you handle ESD-sensitive components (e.g. wafers, sensors)?
Preferred ESD chair ground path
Dissipative castors to floor
Conductive drag chain
Wrist-strap banana jack
Not required
Required surface resistance (Ω) for worksurface
Need ESD continuous monitoring?
Unit size matrix (add rows as needed)
Tag/ID | Length (mm) | Depth (mm) | Height (mm) | Max. distributed load (kg) | Importance (1 = low, 5 = critical) | ||
|---|---|---|---|---|---|---|---|
1 | BENCH-01 | 2400 | 750 | 900 | 500 | ||
2 | HOOD-03 | 1500 | 900 | 2500 | 150 | ||
3 | |||||||
4 | |||||||
5 | |||||||
6 | |||||||
7 | |||||||
8 | |||||||
9 | |||||||
10 |
Height adjustability
Fixed
Manual crank
Electric 1-motor
Electric 2-motor
Electric 3-motor
Not needed
Wheelchair accessibility required?
Need integrated monitor arm/keyboard tray?
Need anti-fatigue mat?
Will you reconfigure the layout within 3 years?
Panel finish (for cleanroom partitions)
White melamine FRL
Aluminium honeycomb core
Stainless steel skin
Transparent acrylic
Static-dissipative PVC
Not applicable
Need pass-through chamber?
Need ceiling grid integration?
Required utilities on unit
Compressed air
Nitrogen
Vacuum
DI water
Hot water
Chilled water
Steam
Electric 110–120 V
Electric 220–240 V
Data RJ45
Fiber optic
Not required
Number of Schuko/NEMA/BS sockets needed
Need emergency stop mushroom button?
Need integrated LED lighting?
Need UV-C decontamination lamp?
Is site accessible only via freight elevator?
Cleanroom already operational (limited downtime window)?
Preferred incoterms
EXW
FCA
CPT
CIP
DAP
DPU
DDP
Special packing/crating notes
Need FAT (Factory Acceptance Test) witness?
Need IQ/OQ documents for validation?
Need on-site operator training?
Need multilingual manuals?
Number of hard copies required
Indicative budget range (optional)
Purchase order target date
Required on-site delivery date
Decision timeline
Within 1 week
Within 1 month
Within 3 months
Exploratory only
Upload reference photos/existing lab layout
Upload CAD/BIM/PDF drawings
Upload SDS or chemical compatibility chart
Additional comments or special requests
Subscribe to quarterly contamination-control newsletter?
Analysis for Laboratory & Cleanroom Infrastructure Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This inquiry form excels at translating highly technical, regulated cleanroom requirements into a structured, conversational flow. By grouping questions into logical macro-topics—contamination control, airflow, ESD, logistics, validation—it mirrors the way engineers and quality managers actually specify equipment. The progressive disclosure (dynamic follow-ups after Yes/No or "Other") keeps cognitive load low while still capturing the depth needed for accurate quoting. Mandatory fields are limited to the minimum data set required for a first-pass quotation, which reduces early-stage abandonment yet still protects the vendor from wasting engineering time on incomplete inquiries.
The embedded guidance (placeholder text, default table rows, and short paragraphs) acts as micro-training for junior engineers who may be filling out the form on behalf of their company. Finally, the form anticipates downstream workflow: file uploads for SDS and CAD mean the vendor’s compliance team can start material certification checks immediately, shortening the total sales cycle.
The vendor must verify legal entity for NDA, export control, and eventual PO issuance. A single-line open field keeps the barrier low while still allowing global UTF-8 characters for non-Latin names. Because this value propagates into CRM and quotation templates, accuracy here prevents costly re-issuance of documents.
From a UX perspective, auto-complete from public company registers or past CRM entries would reduce typos and duplicates, but the current free-text design is the lowest-friction fallback.
Data-quality risk is low: duplicates can be merged later, whereas a dropdown of pre-approved companies would block legitimate new prospects.
This open multiline box is the single most important unstructured data field. It lets the prospect describe the process context ("316L sink benches for GMP API plant") that no set of dropdowns could ever anticipate. Sales engineers use NLP snippets from this field to pre-select surface finish, welding standards, and documentation packages before the first call.
Because it is mandatory, the vendor avoids the common quoting delay of "we don’t know what they actually want." The 3–4 sentence sweet spot is encouraged by the visible row count and placeholder example, which acts as a lightweight priming mechanism.
Privacy implications are minimal—no personal data—yet the text may contain proprietary process details; the form should therefore be served over HTTPS and stored in an access-controlled CRM, which the meta description already implies.
Cleanroom classification drives 70% of cost (HEPA area, stainless grade, number of welds, documentation). Making this single-choice mandatory prevents the classic error of underspecifying a hood for Grade A when the customer actually needs Grade B, which would trigger a costly redesign after FAT.
The options are ordered from strictest to least strict, matching mental models of QA managers and avoiding numeric confusion (ISO 5 = Grade A). Including "Not applicable/Uncontrolled" is crucial for R&D or aerospace floor-mounted benches where particle limits come from process, not room class.
Because this field controls downstream branching (e.g., electropolish defaults), keeping it mandatory protects both vendor margin and customer compliance.
Ventilation type is the single biggest determinant of sheet-metal geometry, fan selection, and energy consumption. By forcing a choice, the vendor can immediately filter out requests that fall outside their catalogue (e.g., custom explosion-proof BSCs) and suggest a partner, saving weeks of engineering time.
The radio-button layout prevents the ambiguity that would arise if users could select both "Ducted" and "Ductless." The follow-up questions on face velocity and VAV only appear when relevant, avoiding clutter for customers who just need an open bench.
Data collected here feeds directly into CFD modelling and quotation BOMs, so accuracy is more valuable than completeness; hence the field is mandatory.
These two dates are the backbone of production slotting and cash-flow forecasting. Making both mandatory prevents the CRM from filling up with "exploratory" leads that claim to need delivery "yesterday" but cannot commit, which historically wreaks havoc on finite-capacity scheduling of stainless welding bays.
The date picker widget reduces formatting errors across locales, and the 3-month forward visibility allows the vendor to reserve raw material (316L plate is long-lead) at commodity prices, protecting margin.
From a user-experience angle, small businesses often have board-driven capex calendars; forcing them to articulate a date range upfront aligns expectations and reduces re-quotes later.
Mandatory Question Analysis for Laboratory & Cleanroom Infrastructure Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Company/Organisation Name
Justification: A legally verifiable entity name is required for quotations, NDAs, export-control checks, and eventual invoicing. Without it, the vendor cannot assign the inquiry to the correct CRM account or perform compliance screening, leading to rework and potential legal exposure.
Brief description of the product(s) you need
Justification: This free-text field captures the unique process context—chemical exposure, GMP grade, ergonomic constraints—that predefined dropdowns cannot enumerate. Its mandatory status ensures that sales engineers receive enough narrative detail to pre-select material grade, surface finish, and documentation package before the first technical call, eliminating the most common cause of quotation delays.
GMP/ISO classification of controlled space
Justification: Cleanroom classification directly dictates stainless grade, welding standard, and filter area, impacting up to 70% of system cost. Making this field mandatory prevents underspecification, which would otherwise trigger expensive redesigns after Factory Acceptance Tests and jeopardize regulatory compliance.
Type of ventilation
Justification: Whether the customer needs an open bench, a ducted fume hood, or a laminar flow cabinet determines sheet-metal geometry, fan selection, and energy consumption. A mandatory single choice allows the configurator to instantly filter catalogue compatibility and initiate CFD calculations, avoiding wasted engineering hours on infeasible designs.
Purchase order target date
Justification: This date drives production slotting and long-lead material procurement (316L plate, HEPA filters). A mandatory entry ensures that finite-capacity planning can reserve welding-bay time and lock in commodity prices, protecting both margin and delivery commitments.
Required on-site delivery date
Justification: Aligns customer expectations with manufacturing lead times and site-access windows. A mandatory date prevents CRM pollution with speculative inquiries that claim urgent delivery but have no executive approval, thereby stabilizing the master production schedule.
The current form strikes an effective balance by mandating only six high-impact fields that collectively unlock 80% of the quotation workflow. This restraint keeps the initial barrier low for small-business prospects while still capturing the minimum viable data set for engineering feasibility and price anchoring. To further optimize, consider making Project codename conditionally mandatory only when the same contact creates multiple inquiries, thereby avoiding duplicate quotes without burdening first-time users.
For future iterations, implement progressive mandatoriness: once a user selects "ISO 5 / Grade A," automatically require Maximum acceptable particle count and List primary chemicals because these fields become critical for regulatory compliance. Conversely, if a prospect indicates an Indicative budget range, relax the delivery-date mandatoriness for inquiries tagged "Exploratory only," thereby reducing perceived friction during early-stage scouting. Finally, add visual cues—such as a red asterisk with a tooltip explaining the business reason—to reinforce trust and reduce abandonment among privacy-conscious users.