Daily Clearance Permit for Heavy Excavation & Pile-Driving Operations Near Critical Buried Utilities

1. Project Location Coordinates & Excavation Grid Metadata

Provide precise geospatial data and excavation parameters. Accurate positioning is critical for utility avoidance and emergency response. All coordinate systems must be clearly defined and consistently applied.


Project Identification Number

Site Manager Name

Permit Validity Start Date/Time

Permit Validity End Date/Time


GPS Latitude (Decimal Degrees)

GPS Longitude (Decimal Degrees)


Grid Reference System

Grid Northing/Y-Coordinate

Grid Easting/X-Coordinate


Planned Maximum Excavation Depth (meters)

Planned Minimum Depth of Utilities (meters)

Excavation Operation Type

Detailed Description of Excavation Purpose and Scope

Excavation Equipment Specifications

Equipment Type

Model/Specification

Operating Weight (tonnes)

Maximum Reach/Depth (meters)

Impact Energy (kJ) if applicable

Hydraulic Excavator
CAT 336
36
6.5
0
Vibratory Pile Driver
ICE 416L
12.5
8
416
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Is the planned excavation within 5 meters of any known high-voltage or gas utility corridor?


Planned Horizontal Clearance Distance from Marked Utility (meters)

2. Ground-Penetrating Radar (GPR) & Electromagnetic Utility Locating Results

Document all sub-surface detection survey results. Incomplete or inconclusive surveys must be resolved before authorization. Attach all raw data and marked site photographs.


GPR Survey Completion Date/Time

Electromagnetic Locating Survey Completion Date/Time

Survey Equipment and Technician Details

Survey Type

Equipment Model

Frequency/Configuration

Last Calibration Date

Certified Technician ID

Data Quality Score (1-5)

GPR
Sensors & Software PulseEKKO Pro
250 MHz
6/1/2025
TECH-GRP-784
 
EM Locator
Radiodetection RD8200
Active/Passive
6/15/2025
TECH-EM-452
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Was complete grid coverage achieved with both GPR and EM methods?


Survey Methodology and Grid Spacing Details

Detected Sub-Surface Utilities and Anomalies

Utility/Anomaly ID

Detection Method

Estimated Depth (meters)

Horizontal Position Offset (meters)

Confidence Level

Surface Marking Method

UTIL-001
Both GPR & EM
1.2
0.5
High - Confirmed
Paint + Flags
UTIL-002
EM Only
0.8
2.1
Medium - Probable
Paint Only
ANOM-003
GPR Only
2.5
1.8
Low - Uncertain
Caution Tape
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Were any utility depth or position conflicts identified between GPR and EM results?


Did surveys detect any unknown or unrecorded utilities?


Technical Interpretation Notes and Survey Limitations

Upload Raw GPR Data Files (e.g., .dzx, .sgy format)

Choose a file or drop it here
 

Upload Site Photographs Showing Utility Markings

Choose a file or drop it here

Overall Survey Reliability Rating (1 = Unreliable, 10 = Highly Reliable)

3. Municipal 811 / Utility Owner Clearance Verification

Obtain and verify official utility clearance before proceeding. Direct confirmation from utility owners is mandatory for high-risk corridors. Document all reference numbers and conditions.


Municipal One-Call Service Reference Number

One-Call Ticket Issuance Date/Time

One-Call Ticket Expiration Date/Time


Individual Utility Owner Clearance Verification

Utility Type

Owner/Operator Organization

Contact Person Name

Contact Phone

Clearance Reference Number

Clearance Status

Conditions or Restrictions

High-Voltage Electric
PowerGrid Corp
John Smith
+1-555-0101
PWR-CL-78452
Conditional Clearance
Maintain 3m horizontal clearance, monitor for vibrations
Natural Gas
GasNet Utility
Sarah Chen
+1-555-0102
GAS-CL-45218
Full Clearance Granted
None
Telecom/Fiber
FiberComm Inc
Mike Johnson
+1-555-0103
TEL-CL-96532
Requires On-Site Rep
Owner rep must be present during pile-driving
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Have all utility owners provided positive clearance or agreed terms?


Primary Clearance Verification Method

Applicable Clearance Limitations (select all that apply)

Is a utility owner representative required to be on-site during operations?


Summary of All Special Conditions and Restrictions

Upload All Utility Clearance Documentation and Correspondence

Choose a file or drop it here
 

4. Emergency Sub-Surface Strike Response & Shut-Off Plan

A strike on high-voltage or gas utilities can be catastrophic. This section must be completed with absolute precision. All personnel must be briefed on these procedures before work begins.


Emergency Response Contact Directory

Emergency Role

Contact Name

Primary Phone

Alternative Phone

Expected Response Time

Site Manager
Robert Martinez
+1-555-0201
+1-555-0202
Immediate
Lead Safety Engineer
Jennifer Park
+1-555-0203
+1-555-0204
Within 15 minutes
Utility Emergency (Electric)
PowerGrid Emergency
+1-555-URGENT
112
Within 30 minutes
Utility Emergency (Gas)
GasNet Emergency
+1-555-GAS-911
112
Within 20 minutes
Medical Emergency
On-Site Medic
+1-555-0205
911
Immediate
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Have all emergency shut-off valve and isolation point locations been identified and physically verified?


Step-by-Step Emergency Shut-Off Procedure

Strike Severity Level Classification



Emergency Response Equipment Status

Equipment Type

Equipment Location

Quantity Available

Last Inspection Date

Operational Status

Combustible Gas Detector
Tool Crib - Unit 5
2
6/25/2025
Yes
Non-Contact Voltage Detector
Safety Trailer
3
6/27/2025
Yes
CO2 Fire Extinguisher
Equipment Staging
4
6/20/2025
Yes
Trauma First Aid Kit
Site Office
2
6/28/2025
Yes
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Is a site-wide evacuation plan established and communicated?


Are nearby structures, buildings, or public areas at risk from a potential utility strike?


Immediate Actions to be Taken by Equipment Operator Upon Suspected Strike

Confidence Level in Emergency Preparedness (1 star = Low, 5 stars = High)

Upload Comprehensive Emergency Response Plan Document

Choose a file or drop it here
 

5. Site Superintendent & Lead Safety Engineer Joint Clearance Sign-Off

This joint sign-off confirms that all safety protocols have been reviewed, all hazards identified, and all necessary precautions are in place. Both signatories share equal responsibility for authorizing this high-risk operation.


Have all four preceding sections been thoroughly reviewed and verified as complete and accurate?


Additional Observations, Concerns, or Special Precautions

Has a pre-excavation safety briefing been conducted with all personnel and subcontractors?


Joint Authorization Sign-Off

Authorized Role

Name (Printed)

Employee/Professional ID

Signature

Date/Time of Sign-Off

Site Superintendent
 
 
 
 
Lead Safety Engineer
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

I acknowledge that this clearance permit is valid ONLY for the specific date, time, location, and conditions detailed in this form.

I understand that any deviation from the approved plan, including changes in equipment, depth, location, or timing, requires a new clearance permit.

I confirm that all emergency contact numbers have been tested and are operational at the time of sign-off.

Overall Site Risk Assessment for This Operation (1 = Minimal Risk, 10 = Extreme Risk)

Final Joint Authorization Signature (Both parties must be present)


This permit becomes effective only upon completion of both signatures above. Work must not commence before authorization. Keep this permit readily accessible at the work site at all times.

Curious what you can change? Explore the editor! Edit this Daily Excavation Clearance Permit Form
Want forms that adapt and evolve? Zapof's got the smarts – let's build something seriously clever!
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof