Dedicated High-Voltage EV Charging Infrastructure Installation Request for Commercial Garages

1. Section 1: Tenant & Parking Space Identifiers

Please provide accurate identification details for your organization and the specific parking spaces requiring EV charging infrastructure installation.


Legal Company Name

Trade Name (if different from legal name)

Registered Business Address

Primary Contact Person Full Name

Contact Person Job Title

Contact Email Address

Contact Phone Number

Alternative Contact Person (optional)

Alternative Contact Email

Lease Commencement Date

Lease Expiration Date


Total Number of Parking Spaces Leased

Number of Parking Spaces Requiring EV Charging Infrastructure

Are the requested parking spaces contiguous (adjacent to each other)?


Parking Space Location Type

Do you currently have any existing EV charging infrastructure installed?


Is there existing electrical conduit or raceway available near the requested parking spaces?


2. Section 2: Hardware Specifications & Power Load Requirements

Provide detailed technical specifications for the EV charging equipment you intend to install. This information is critical for electrical load calculations and infrastructure planning.


EV Charging Unit Specifications

Unit Identifier

Charger Type

Quantity of Identical Units

Voltage Rating (VAC)

Amperage Rating (A)

Power Output (kW)

Connector Type(s)

Unit-01
Level 2 AC (Dual Port)
5
208
40
16.6
Type 2 (Mennekes)
Unit-02
DC Fast Charge (CCS)
2
480
200
150
CCS Combo 2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Will the charging equipment support dynamic load management or load balancing across multiple units?


Total Simultaneous Peak Power Demand (kW)

Estimated Annual Energy Consumption (kWh)

Network Connectivity Requirement

Do you require integration with building management systems (BMS) or energy management platforms?


Additional Hardware Features Required (select all that apply)

Do you anticipate future expansion of charging infrastructure beyond this initial request?


Special Installation Requirements or Constraints

3. Section 3: Structural Electrical Panel Impact & Sub-Metering Plan

Provide comprehensive details about the existing electrical infrastructure and requirements for sub-metering to ensure accurate billing and load management in this shared facility.


Nearest Electrical Room or Panel Designation

Current Main Service Panel Capacity (Amperes)

Estimated Available Spare Capacity (Amperes)

Is a new dedicated electrical panel required for this installation?


Assess the following electrical infrastructure components for compatibility and condition

Inadequate

Marginal

Adequate

Optimal

Unknown

Existing conduit pathways adequacy

Panel busbar capacity for additional breakers

Grounding system compliance

Arc-fault protection availability

Surge protection adequacy

Thermal management (cooling/ventilation)

Accessibility for maintenance

Will you require dedicated electrical sub-metering for tenant billing purposes?


Sub-Meter Communication & Data Requirements (select all that apply)

Does your organization require utility-grade meter certification (e.g., MID, ANSI C12.20)?

Describe any existing power quality issues or voltage fluctuations observed in the facility

Will this installation require utility company involvement for service upgrade or new service drop?


Estimated Distance from Electrical Panel to Farthest Parking Space (meters)

Are there any asbestos-containing materials (ACM) or other hazardous materials present in the installation path?


4. Section 4: Installation Schedule & Facility Safety Disruption Protocols

Coordinate installation timeline and establish safety protocols to minimize disruption to shared garage operations and ensure compliance with facility safety standards.


Preferred Installation Start Date

Required Installation Completion Date


Installation Phasing Preference

Can installation work be performed during normal business hours (08:00-18:00)?


Will installation require temporary closure of parking spaces or traffic lanes?


Safety Protocols & Compliance Measures (select all that apply)

Rate the anticipated disruption level for each facility operation during installation (1 = Minimal, 5 = Severe)

Vehicle traffic flow

Pedestrian access

Elevator operation

Lighting systems

Security systems

Fire suppression systems

HVAC operation

Tenant access to spaces

Will you provide a dedicated safety supervisor on-site during all installation activities?


Describe your noise mitigation plan for installation activities

Will installation require core drilling, concrete cutting, or structural modifications?


Installation Milestone & Communication Plan

Milestone Phase

Scheduled Date

Affected Areas

Tenant Notification Plan

Requires Facility Approval?

Electrical Rough-In
8/15/2025
Electrical Room 3B, Parking Level 2
Email notice 48 hours prior
Yes
Conduit Installation
8/20/2025
Parking Level 2, Zones A-C
Signage 72 hours prior + email
Yes
Charger Mounting
8/25/2025
Parking Spaces A101-A110
Individual space notices 1 week prior
 
Final Connection & Testing
9/1/2025
Electrical Room 3B
Email notice 24 hours prior
Yes
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Do you agree to restore any disturbed surfaces to original condition upon completion?

Additional coordination requirements with other tenants or facility operations

5. Section 5: Asset Management & Electrical Engineering Sign-Off

Define long-term asset management responsibilities and obtain required engineering approvals to ensure safe, compliant, and maintainable installation.


Post-Installation Maintenance Responsibility


Will you provide 24/7 emergency response for charger malfunctions or safety incidents?


Monitoring & Reporting Requirements (select all that apply)

Required Equipment Warranty Period (Years)

Will you maintain liability insurance covering the charging infrastructure?


Has a licensed electrical engineer reviewed and approved the electrical design?


Will you provide as-built electrical drawings and single-line diagrams upon completion?

Do you agree to indemnify the facility owner against damages arising from defective installation or equipment?

Confirm compliance with the following engineering standards (Rate as Fully Compliant, Partially Compliant, Non-Compliant, or Not Applicable)

Non-Compliant

Partially Compliant

Fully Compliant

Not Applicable

IEC 61851 (EV Conductive Charging)

IEC 62196 (Plugs & Sockets)

IEC 60364 (Electrical Installations)

ISO 15118 (Vehicle-to-Grid Communication)

Local Electrical Code Compliance

Fire Safety Standards

Accessibility Standards (Universal Design)

Cybersecurity Requirements

Describe your end-of-life equipment disposal and recycling plan

Will you participate in a facility-wide load management consortium if established?

Tenant Authorized Representative Signature - Acknowledgment of Terms and Accuracy of Information

Signature Date

Printed Name and Title

Upload Electrical Engineer Stamped Drawings (PDF format)

Choose a file or drop it here
 

Upload Equipment Technical Specifications & Data Sheets

Choose a file or drop it here
 

Upload Insurance Certificate of Coverage

Choose a file or drop it here
 

I confirm that all information provided is accurate and complete to the best of my knowledge

Editing this form takes less effort than deciding what to watch next! (And way more satisfying.) Pass the clicker—your turn! 🥔➔🏃‍♂️ Edit this Corporate EV Charging Infrastructure Installation Request Form
Want forms that only ask the questions that are relevant to each person, saving them time like catching the early train? Zapof lets you build your own with conditional logic and question branching – no time-wasting detours allowed, let's get straight to the good stuff!
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof