Tell us the story of your project so we can align our premium solutions with your design intent, schedule, and budget.
Project Name/Code
Project Stage
Concept Design
Design Development
Construction Documentation
Tender/Pricing
Under Construction
Post-Construction (Retrofit)
Expected Site Possession/Start on Site
Required On-Site Delivery Date
Total Project Interior Floor Area (m²)
Procurement Route
Design-Bid-Build (Traditional)
Design & Build
Construction Management
Integrated Project Delivery
Other
Is this a phased/staged project?
Accurate contact information ensures rapid response times and dedicated account management.
Company/Client Name
Primary Contact Full Name
Job Title/Role
Preferred Communication Language
Email Address
Mobile/WhatsApp
Preferred Contact Method
Time Zone & Best Time to Contact
Identify every space that will receive our products so we can recommend finishes optimized for traffic, humidity, UV, and maintenance regimes.
Areas Requiring Our Products
Kitchen (Residential)
Kitchen (Commercial/F&B)
Bath & Spa
Living Areas
Bedrooms
Walk-in Closet/Dressing Room
Home Office/Study
Lobby/Reception
Conference/Meeting
Retail Floor
Restaurant Dining
Bar/Lounge
Hotel Guestroom
Hotel Suite
Wellness/Gym
Outdoor Terrace/Balcony
Other
Any high-traffic or public-facing areas?
Any wet or submerged applications?
Exterior or semi-exposed locations?
Select every category you wish to specify; we will coordinate compatibility and installation sequences across trades.
Primary Product Categories
Custom Cabinetry & Millwork
Natural Stone Slabs & Tiles
Engineered Quartz Surfaces
Sintered Stone/Porcelain Slabs
Hardwood Flooring & Parquet
Designer Architectural Lighting
Bespoke Hardware & Ironmongery
Acoustic Wall Panels
Decorative Metal Mesh/Screens
Smart Glass/Electrochromic Glazing
Other
Budget Band per Category (Currency Agnostic)
Entry-Luxury
Mid-Luxury
High-Luxury
Ultra-Luxury/Bespoke
Do you require sustainable/low-carbon options?
Are acoustic performance targets critical?
Share imagery, palettes, and narratives so our proposals resonate with your creative vision.
Concept Narrative/Atmosphere Keywords
Mood-Board or Reference Images
Preferred Palette Dominance
Light/Neutral
Dark/Dramatic
Monochrome
Rich Jewel Tones
Earth Tones
High Contrast
Pastels
Texture & Finish Preferences
Matte/Velvet
Satin/Low-Sheen
High-Gloss Piano
Brushed/Directional
Polished Mirror
Textured/Relief
Hand-Aged/Patinated
Any patterns or veining to avoid?
Is contrast seam minimisation critical?
Precise interface data prevents costly rework on site.
Substrate/Base Build-ups
Concrete Slab
Lightweight Screed
Plywood Subfloor
Metal Stud Plasterboard
Blockwork
Existing Stone/Tile (Overlay)
Raised Access Floor
Other
Maximum Finished Floor Thickness Allowed (mm)
Maximum Dead Load Capacity (kg/m²)
Under-floor heating or cooling present?
Integrated lighting or electrified hardware?
Seismic or movement-joint requirements?
Define measurable benchmarks so finishes maintain integrity over their design life.
Rate Importance of Each Performance Attribute
Not Required | Nice to Have | Important | Critical | |
|---|---|---|---|---|
Slip Resistance | ||||
Scratch Resistance | ||||
Stain Resistance | ||||
Colour-Fade Resistance | ||||
Fire Reaction | ||||
Thermal Shock Resistance | ||||
Chemical Resistance (Pool Chlorine) |
Any hygienic or food-safe certifications needed?
Are there VOC emission limits?
Does the project require third-party testing?
Early logistics planning avoids hoisting surprises and storage damage.
Site/Building Address
Street Address
Street Address Line 2
City/Suburb
State/Province/Region
Postal/Zip Code
Is site access restricted?
Maximum Single Lift Weight (kg)
Lift/Hoist Car Internal Dimensions (L x W x H in cm)
Require temperature-controlled storage on site?
Any trade sequence constraints?
Provide quantities or provisional sums so we can validate market pricing and Value-Engineering options.
Elemental Cost Schedule
Element Description | UOM | Provisional Quantity | Unit Rate (Ex-Works) | Subtotal | VE Priority (1=low, 5=high) | |
|---|---|---|---|---|---|---|
Custom Kitchen Island Cabinetry | lm | 5.2 | $1,200.00 | $6,240.00 | ||
Calacatta Marble Slabs 20 mm | m² | 45 | $850.00 | $38,250.00 | ||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 |
Currency Preference for Quotation
Include freight & insurance to site?
Include installation by specialist contractor?
Is escalation clause required?
Specify deliverables to ensure transparency and risk mitigation.
Samples Required
Material Chip
A4 Finish Board
Prototyped Corner
Full-Scale Mock-Up
None
Number of Sample Sets
Require Factory Audit?
Require shop drawings for approval?
Require O&M Manuals & Warranties?
Require as-built drawings after install?
Attach NBS Specification or BIM objects (optional)
Help us propose low-impact solutions and end-of-life strategies.
Embodied Carbon Target
No Target
<350 kgCO₂e/m²
<250 kgCO₂e/m²
<150 kgCO₂e/m²
Net-Zero (offset)
Require take-back programme at end-of-life?
Is recycled content mandatory?
Is bio-based content desired?
Require packaging take-back?
Proactively identify risks so mitigation strategies can be engineered early.
Top Three Project Risks from Your Perspective
Is early procurement (long-lead) lock-in required?
Are there penalties for late delivery?
Is design freeze already achieved?
Is currency hedging required?
Any additional context accelerates our response accuracy.
Additional Requirements or Notes
Preferred Response Format
Detailed Proposal PDF
Video Conference Follow-Up
In-Person Presentation
Budgetary Estimate Only
Other
How many firms are you comparing?
How urgent is this inquiry?
No Rush
Moderate
Urgent
Critical
I consent to the storage of my data for quotation and marketing purposes.
Authorised Signature
Analysis for Architectural & Design Specification Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This inquiry form is a master-class in capturing the nuanced requirements of high-end architectural finishes. By guiding specifiers through a narrative arc—from project vision to risk mitigation—it ensures the vendor can quote accurately, plan logistics, and pre-empt costly site surprises. The form’s sectional progression mirrors a typical design workflow (concept → technical → commercial → compliance), which reduces cognitive load and reinforces trust with professional clientele.
Mandatory fields are restrained to the absolute minimum needed for triage and legal consent, while extensive optional branching collects rich contextual data without overwhelming the user. This balance maximises completion rates without sacrificing data depth, a critical consideration when a single project may be worth six or seven figures.
Purpose: Acts as the primary key in the CRM and links all future correspondence, samples, revisions, and invoices to a unique identifier. In multi-unit developments or repeat-client studios, an internal code (e.g., “22-PEM-001”) prevents ambiguity between similarly named jobs.
Effective Design: Single-line open text with a creative placeholder (“The Meridian Penthouse”) nudges the user to supply something memorable yet professional. The field is short, front-loaded, and mandatory—exactly where a busy specifier expects it.
Data Quality: Because the field is free-text rather than autogenerated, the vendor receives human-readable labels that integrate seamlessly with project-management tools, drawing sets, and delivery dockets.
Purpose: Determines urgency, level of detail, and which internal team (concept design, value-engineering, or site-support) should own the enquiry. A project still at “Concept Design” needs finish samples and budget bands, whereas “Under Construction” demands 10-day lead-times and dimensional shop drawings.
Strengths: Single-choice radio list prevents contradictory answers and maps directly to stage-gate workflows used by most architectural firms. The progression from early to post-construction is logical and reduces mental friction.
User Experience: Because the list is exhaustive yet mutually exclusive, specifiers can quickly self-categorise without second-guessing vendor terminology.
Purpose: These two dates enable the vendor to perform backward-scheduling through design freeze, sample approval, fabrication, sea-freight, and quality-control holds. Missing a delivery window on a luxury build can trigger five-figure liquidated damages.
Design Merit: Date pickers eliminate ambiguous text such as “early Q3” and automatically flag impossible spans (e.g., delivery before possession). Both fields are mandatory, ensuring every enquiry enters the ERP with a baseline programme.
Privacy Consideration: Dates alone are low-risk personal data, yet they reveal project cadence—information competitors could exploit. The form mitigates this by gating access behind user authentication and SSL.
Purpose: Creates a spatial inventory that drives performance specifications: a “Hotel Spa” needs slip-resistant, chemically tolerant stone, whereas a “Walk-in Closet” prioritises scratch-free cabinetry lighting.
Strength: Multiple-choice checkboxes allow overlapping spaces without forcing false hierarchies. The option list mixes residential and commercial labels, acknowledging that many luxury towers contain both.
Data Collection: The resulting array can be exported to BIM tools as space-tags, enabling automated clash detection and quantity take-offs.
Purpose: Routes the enquiry to the correct product manager (stone, lighting, hardware). It also triggers category-specific questionnaires downstream (e.g., CRI rating for lighting, flexural-strength for stone).
Design: The list is curated to high-margin, bespoke categories—omitting commodity items that would waste sales time. Mandatory status prevents blank submissions that would otherwise require manual triage.
Commercial Impact: Early visibility of basket mix allows dynamic pricing strategies and bundled shipping, protecting margin while offering apparent savings to the client.
Purpose: Feeds freight calculators, duty calculations (if cross-border), and site-access risk profiles (city-centre crane restrictions, island barges, etc.).
Strengths: Free-text entry accepts everything from a full street address to a GPS pin, accommodating both confidential sites (e.g., “plot 12B, Sector 9”) and legacy building names. Mandatory status guarantees logistics can begin without back-and-forth emails.
Privacy: Address information is classified as personal data under GDPR when linked to a named contact; the form addresses this with encrypted storage and a checkboxed privacy consent.
Purpose: Provides the lawful basis for storing personal data and adding the contact to marketing automation. Without it, the vendor could not legally send quotations, brochures, or webinar invites.
Design: A single, clearly worded checkbox with mandatory enforcement removes ambiguity—no pre-ticked boxes, no bundled consents, fully GDPR-compliant.
Risk Mitigation: The signature field below, although optional, adds a further layer of enforceability should disputes arise over terms and conditions.
Mandatory Question Analysis for Architectural & Design Specification Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Project Name/Code
This identifier is the backbone of every downstream workflow—CRM records, sample labels, shop drawings, delivery notes, and invoices. Without it, the vendor cannot group related emails or track revision control, leading to misquoted quantities and mis-timed deliveries that jeopardise premium construction schedules.
Project Stage
The stage determines which internal department owns the enquiry and which commercial terms apply (e.g., concept-stage budgets are ±20%, while tender-stage are ±5%). Making this mandatory ensures the correct technical team and risk profile are assigned from day one, preventing costly hand-offs later.
Expected Site Possession/Start on Site
Backward-scheduling from this date drives factory slot allocation, sea-freet booking, and sample approval cadence. A missing date would force the vendor to quote blindly, inflating risk premiums or, worse, promising an unachievable delivery.
Required On-Site Delivery Date
This is the non-negotiable milestone against which liquidated damages are measured. Capturing it up-front locks the critical-path and prevents over-promising, protecting both parties from breach-of-contract scenarios.
Company/Client Name
Required for credit checks, VAT invoicing, and NDA issuance. Luxury projects often involve shell companies or offshore trusts; capturing the legal entity early prevents regulatory and payment disputes.
Primary Contact Full Name
Essential for attribution in BIM comments, sample approvals, and change orders. Without a named individual, decisions stall in committee, delaying fast-track programmes.
Email Address
The primary asynchronous channel for sending quotations, CAD files, and programme updates. Email is still the de-facto legal record in international supply contracts, making its capture non-negotiable.
Preferred Contact Method
Dictates SLA expectations—WhatsApp for urgent site issues, email for formal transmittals, video for design workshops. Misalignment causes missed RFIs and programme slippage, hence the mandatory status.
Areas Requiring Our Products
Drives performance specifications (slip, UV, abrasion) and therefore product line-up and pricing. Without this list, the vendor cannot exclude unsuitable materials, leading to liability exposure if an incorrect finish is supplied.
Primary Product Categories
Routes the enquiry to specialised product managers and triggers category-specific compliance checks (e.g., CE marking for lighting, NSF for food-safe stone). Omitting this would clog the generic pipeline and delay response times.
Site/Building Address
Impacts freight cost, duty, crane reach, and delivery risk. Luxury builds often sit in restricted zones (embassies, islands, high-security towers); early address capture allows logistics teams to book hoist slots and security clearances.
Consent to Data Storage
GDPR and CCPA compliant lawful basis for processing personal data and sending quotations/marketing. Mandatory status protects both vendor and client from regulatory penalties.
The current form employs a “minimum viable mandatory” philosophy: only 12 of 70+ fields are required. This balances rich data collection with completion psychology, ensuring high-value enquiries are not abandoned mid-form. To further optimise, consider making “Budget Band per Category” conditionally mandatory when “Tender/Pricing” stage is selected—this would sharpen quotations without adding friction for early-stage designers.
Additionally, introduce progressive disclosure: once a user selects “Exterior or semi-exposed locations,” elevate substrate type and wind-load to mandatory status. This keeps the initial cognitive load low while guaranteeing technical compliance when environmental risks are high. Finally, add micro-copy beneath each mandatory field explaining why it is needed; transparency increases trust and reduces user frustration, especially for first-time specifiers unfamiliar with luxury supply-chain constraints.