Use this form to ask the property owner, landlord, or their appointed representative for a decision on a proposed subletting arrangement, a proposed alteration, or both. Complete every section that applies to your request and attach the supporting documents listed later in the form.
This template is provided for general information and organisation only. It is not legal, financial, engineering, or safety advice, and it does not replace the wording of your own lease or any approvals that may be required in your location. Where the form uses words such as "may be required" or "if applicable", you should confirm the actual requirements with your own advisers and with the relevant approving party before work begins.
Fields marked as required must be completed before the form can be submitted. Incomplete submissions may take longer to review or may be returned for further information.
Date of this request
Reference number assigned to this request (if known)
Tell us who is making the request and how to reach them. If an agent, adviser, or colleague is submitting on behalf of the tenant, complete both the tenant details and the contact person details.
Who is submitting this request?
Named tenant under the lease
Authorised employee of the tenant
External agent or adviser acting for the tenant
Other
Tenant organisation or trading name
Primary contact person
Job title or role
Email address
Telephone number (including country and area code)
Alternative or out-of-hours contact number
Registered or correspondence address for the tenant
Should all correspondence about this request be copied to a third party, such as a lawyer, agent, or facilities contact?
Identify the premises and the lease under which the request is being made. If you hold more than one lease at the same building, please submit a separate form for each lease unless the works or subletting clearly span both.
Building or property name
Full address of the premises
Suite, unit, floor, or demised area reference
Lease or agreement reference number
Lease start date
Lease expiry or next break date
Approximate area of the demised premises
Which unit of area applies to the figure above?
Square metres
Square feet
Square yards
Other
Does your lease contain a clause that specifically governs subletting, assignment, sharing of occupation, or alterations?
Are there any side letters, previous written consents, or variations that already modify the lease terms relevant to this request?
Name of the landlord, owner, or approving party
Property manager or managing agent (if any)
Select what you are asking for. The sections that follow will help you describe the proposal in enough detail for a fair and timely review.
What type of approval are you requesting?
Subletting or sharing of occupation only
Alterations or works only
Both subletting and alterations
Assignment or transfer of the lease
Not sure yet — seeking guidance before a formal application
Is this request for part of the premises or the whole of the premises?
Part of the premises
Whole of the premises
Part now, with the possibility of more later
Preferred date for the arrangement or works to begin
Target completion or occupation date
Is there a fixed deadline driving this request, such as a project launch, a client commitment, or a scheduled move?
In your own words, summarise the proposal and the outcome you are hoping for
Complete this section if any part of the request involves another party occupying all or part of the premises, whether by sublease, licence, informal sharing, or a similar arrangement.
Which arrangement best describes what you are proposing?
Formal sublease to a single sub-tenant
Licence to occupy a defined area
Sharing of occupation with a group company or partner
Co-working or desk-sharing arrangement
Short-term or seasonal occupancy
Other arrangement
Proposed sub-occupier's legal or trading name
Nature of the sub-occupier's business
How the space will be used day to day, including typical activities, equipment, and any goods stored on site
Is the proposed sub-occupier a related company, subsidiary, or affiliate of the tenant?
Proposed start date of the sub-occupancy
Proposed end date of the sub-occupancy
Proposed term length in months
Area to be sublet or shared
Which unit of area applies to the figure above?
Square metres
Square feet
Square yards
Other
Proposed rent or licence fee payable to you by the sub-occupier (state the period in the notes if not monthly)
Will the proposed rent or fee exceed the rent you pay for the same area under your lease?
Which costs, if any, will the sub-occupier be asked to contribute toward?
Service charge
Utilities and metered services
Insurance contributions
Cleaning and waste
Furniture and equipment hire
Parking or storage charges
IT and telecommunications
None — a single inclusive fee is proposed
Other
Maximum number of people expected on site from the sub-occupier on a typical day
Will the sub-occupier need its own entrance, signage, postal address, telephone lines, or network connections?
Will the sub-occupier have access to shared areas such as reception, meeting rooms, loading bays, or washrooms?
Does the proposed use involve any of the following: food preparation, hazardous materials, heavy machinery, retail sales to the public, medical or clinical activity, or late-night operation?
How will you manage the relationship with the sub-occupier, including day-to-day supervision, complaints, and compliance with building rules?
Will you remain fully responsible for the premises and for all obligations under your lease throughout the proposed arrangement?
Complete this section if any physical change to the premises is proposed, whether it is a minor fitting-out task or a substantial construction project. Describe the works clearly so that the reviewer can judge their scale, duration, and impact.
Which categories of work are included in your proposal?
Decoration and finishes
Partitioning or reconfiguration of rooms
Flooring replacement
Ceiling changes
Lighting alterations
Electrical or data cabling
Plumbing or drainage
Heating, ventilation, or air conditioning
Fire detection or suppression systems
Security and access control
Doors, windows, or glazing
External or facade work
Structural work
Roof or terrace work
Accessibility improvements
Energy efficiency upgrades
Signage or branding
Removal of existing fittings
Other
Describe the scope of the works in plain language, including what will be added, removed, or changed
Will the works affect the structure of the building, including columns, beams, load-bearing walls, floors, or the roof?
Will the works affect the exterior of the building, its envelope, or any shared or common area?
Will any wall, ceiling, or floor covering that may contain older or legacy materials be disturbed during the works?
Will the works require drilling, cutting, coring, or fixing into the building fabric?
Will the works involve hot works such as welding, brazing, grinding, or the use of open flames?
Will the works affect any building service, including sprinklers, alarms, smoke control, ventilation, or electrical distribution?
Planned start date for the works
Planned completion date for the works
Estimated duration of the works in working days
Maximum number of contractors expected on site on any one day
Will the premises remain occupied and operational while the works are carried out?
Yes, fully occupied throughout
Partly occupied, with some areas closed
No, the premises will be closed during the works
Not yet decided
What arrangements will you make for staff, visitors, deliveries, and daily operations during the works?
Break the proposal down into line items so that the scale and cost of the works are transparent. Tick the items you are including, adjust the quantities and unit costs, and the estimated totals will be calculated for you.
Schedule of proposed works and estimated costs
Include? | Work item description | Quantity | Unit of measure | Estimated unit cost | Estimated line total | |
|---|---|---|---|---|---|---|
Remove existing timber partition and make good surfaces | 1 | item | $1,800.00 | $1,800.00 | ||
Install new glazed meeting room partition with door | 12.00 | linear metre | $640.00 | $7,680.00 | ||
Upgrade lighting to adjustable fittings | 18 | fitting | $220.00 | $3,960.00 | ||
Additional power and data outlets | 24 | outlet | $145.00 | $3,480.00 | ||
Replace carpet tiles throughout | 160.00 | square metre | $48.00 | $7,680.00 | ||
Repaint walls and ceilings | 320.00 | square metre | $14.00 | $4,480.00 | ||
$0.00 | ||||||
$0.00 | ||||||
$0.00 | ||||||
$0.00 |
Estimated total cost of all works including taxes and fees
Estimated contingency allowance included above
How will the works be funded?
Funded from existing business cash flow
Funded by a business loan or credit facility
Funded by the sub-occupier or a partner
Funded by a landlord contribution or allowance
Funding not yet confirmed
Other:
Is any part of the cost expected to be met or reimbursed by the landlord or property owner?
Provide details of the people and firms who will design, supervise, or carry out the works. The reviewer may wish to check that suitable experience, insurance, and working practices are in place.
Main contractor or principal delivery firm
Main contractor contact person and telephone
Has a competitive tender or quotation process been carried out?
Which professional advisers are involved in the project?
Architect or space planner
Structural engineer
Mechanical or electrical engineer
Fire safety adviser
Health and safety adviser
Cost consultant or quantity surveyor
Project manager
Accessibility adviser
Environmental or sustainability adviser
Legal adviser
None at present
Other:
Please list each firm or individual engaged, their role, and their contact details
Will any specialist subcontractor be working on site, for example on electrical, mechanical, fire, glazing, or access systems?
Will the works be supervised on site by a named person with the authority to stop work if a problem arises?
Set out the insurance cover and risk controls you will put in place. Requirements vary between properties and locations, so describe what you have arranged and confirm anything that is still outstanding.
Which types of insurance cover are in place or will be arranged before the works or occupancy begins?
Public liability cover
Employers' liability cover
Contract works or all-risks cover
Professional indemnity cover for advisers
Contents and equipment cover
Business interruption cover
Motor or vehicle cover
Cyber and data cover
Not yet arranged
Other:
For each policy listed, please state the insurer, policy number, level of cover, and expiry date
Will you provide written confirmation or certificates of insurance before work starts or before occupation begins?
Has a risk assessment been prepared for the proposed works or occupancy?
Which control measures do you expect to apply during the works?
Dust screens and protective sheeting
Noise and vibration limits
Designated working hours agreed with the building
Safe access and exclusion zones
Waste separation and licensed disposal
Daily housekeeping and cleaning of shared routes
Tool and equipment inspection regime
Emergency and evacuation procedures briefed to workers
Permit-to-work system for high-risk tasks
Visitor check-in and escort arrangements
Other:
Will the works generate significant noise, vibration, dust, or odour that could affect neighbouring occupiers?
Will any hazardous substance, flammable liquid, pressurised gas, or controlled material be brought onto the premises?
Will the works affect means of escape, fire detection, suppression, or emergency lighting in any part of the building?
Please summarise the main risks you have identified for this proposal and how each will be controlled
Explain how the works or the new occupancy will fit into the daily operation of the building. Good logistics planning reduces disruption and helps the review proceed smoothly.
Which building facilities will the works or the new occupier need to use?
Passenger lifts
Goods lift
Loading bay
Service yard
Stairwells
Corridors and lobbies
Washrooms
Breakout or kitchen areas
Meeting rooms
Car parking
Bicycle storage
Waste and recycling areas
On-site storage rooms
Roof or rooftop plant areas
Other
What are your proposed working hours for the works, including any weekend or evening activity?
Will any work take place outside normal building operating hours?
How will materials and equipment be delivered to the premises, and where will they be stored before installation?
How will waste, packaging, and removed fittings be taken off site, and who will dispose of them?
Will any road, pavement, or public area outside the building be used for deliveries, skips, scaffolding, or hoarding?
Will scaffolding, hoarding, or temporary external structures be erected?
Will the works require temporary shutdown of any building service or shared facility?
Site or project contact available during the works (name and mobile number)
Consider how the proposal will affect neighbours, shared services, and the reputation of the building. Reviewers often weigh these factors alongside the technical detail.
Have you told neighbouring occupiers about the proposal?
Has any neighbour, occupier, or building user raised an objection or concern about the proposal?
Which aspects of building life are most likely to be affected?
Noise and disturbance
Dust or odour
Congestion in lifts, lobbies, or corridors
Parking and loading pressure
Demand on washrooms or break areas
Security and access control
Waste and recycling volumes
Visual appearance of shared areas
Delivery traffic
None expected
Other
How would you rate the expected level of impact on the following building aspects during the works or the new occupancy?
No impact | Low impact | Moderate impact | High impact | Severe impact | |
|---|---|---|---|---|---|
Noise levels during working hours | |||||
Noise levels outside working hours | |||||
Dust, odour, or airborne particles | |||||
Foot traffic through shared areas | |||||
Vehicle and delivery movements | |||||
Use of lifts and vertical transport | |||||
Security and building access | |||||
Overall visual appearance |
What steps will you take to keep disruption to a minimum and to respond quickly if a problem is reported?
Describe what will happen when the works are finished, when the sub-occupancy ends, or when the lease comes to an end. Clear reinstatement intentions help avoid disputes later.
What is your intention for the alterations at the end of the arrangement?
Remove all alterations and restore the original condition
Remove some alterations and leave others in place
Leave the alterations in place permanently
Depends on what is agreed at the time
Not yet decided
Will you keep a record of the premises before work begins, such as dated photographs or a condition survey?
Describe the reinstatement works you would carry out, the likely timing, and who would carry them out
Are you willing to provide a reinstatement deposit, bond, or guarantee if this is requested as a condition of approval?
Will the sub-occupier be required to leave the premises in a clean and undamaged condition at the end of the arrangement?
Is there anything else about the end of the arrangement that the reviewer should know, such as removal of fixtures, data cabling, signage, or stored goods?
Attach the documents that support your request. If a document is not yet ready, say when you expect to provide it. Clear, legible drawings and accurate figures help the review proceed without delay.
Which documents are you attaching with this request?
Existing and proposed floor plans or layout drawings
Elevations or detail drawings
Specification or scope of works document
Contractor quotations or tender summary
Programme or schedule of works
Risk assessment and method statement
Insurance certificates
Structural calculations or engineer's letter
Fire safety or building services review
Photographs of the existing condition
Draft sublease, licence, or heads of terms
Sub-occupier company details or references
Previous consents, side letters, or variations
Neighbour notification letters or responses
Accessibility or inclusion review
Sustainability or energy assessment
None at this stage
Other:
Please upload drawings, plans, or layout documents
Please upload the scope of works, specification, or method statement
Please upload quotations, cost estimates, or the programme of works
Please upload insurance certificates, risk assessments, or technical reports
Please upload the draft sublease, licence, heads of terms, or related agreements
Please list any document you intend to provide later and the date you expect to send it
Use this section to add anything that does not fit neatly above, and to tell the reviewer how you would like the request handled.
Is there any further information that would help the reviewer understand the proposal or its benefits to the building?
Have you made a similar request at this or another property before?
Are you aware of any reason why this request might raise a concern, for example an earlier breach, an outstanding matter, or a dispute?
How would you prefer to discuss this request with the reviewer?
Email correspondence only
A telephone or video call
A meeting at the premises
A site visit with the project team
No discussion needed at this stage
Other
Please suggest dates and times when your team is available to meet or talk through the proposal
Please rank the following matters in order of importance to you when the decision is made, with the most important first.
Speed of decision | |
Flexibility on the scope of works | |
Keeping costs predictable | |
Minimising disruption to neighbours | |
Retaining the option to reverse the changes | |
Approving the sub-occupier of your choice |
How clear and easy to follow did you find this request form?
Please read each statement carefully and tick those that apply to you. These statements record your understanding and intentions; they do not replace the terms of your lease or any formal consent document that may be issued later.
I confirm that the information given in this form is accurate and complete to the best of my knowledge.
I understand that this request is not an approval and that no work or sub-occupancy should begin until written confirmation is received from the approving party.
I understand that any approval may be subject to conditions, including changes to the scope, additional documents, insurance evidence, or reinstatement arrangements.
I confirm that I have read my lease and that I will seek my own independent advice where needed before proceeding.
I confirm that the proposed sub-occupier will be required to comply with the building rules and with the obligations of the lease that apply to the premises.
I confirm that the works will be carried out by appropriately qualified and insured parties and that relevant local permissions will be obtained where required.
I agree to notify the approving party promptly of any material change to the proposal, the programme, the contractors, or the proposed sub-occupier.
I understand that the approving party may share this request and its attachments with advisers, engineers, or building managers for the purpose of assessing it.
Name of the person signing this request
Position or role held
Date of signature
Please sign to confirm the declarations above
This section is intended for the person or team assessing the request. It is provided for record keeping and does not form part of the applicant's submission.
Reviewer name
Date received
Status of the request
Received and awaiting review
Under review
Further information requested
Approved without conditions
Approved with conditions
Declined
Withdrawn by the applicant
Conditions, notes, or reasons recorded with the decision
Target date for issuing the decision
Has the decision been communicated to the applicant in writing?
Analysis for Commercial Lease Sublet and Alteration Approval Request Form
Important Note:
This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes.
AI-Generated Content: This template and its accompanying guidance are AI-generated to provide a practical starting point for your form-building needs. Please review and customise the content to ensure it is accurate, appropriate and suitable for your intended use.
This guide is provided for general informational and planning purposes only. It does not constitute professional, legal, financial, medical, employment, privacy, regulatory, or advice of any other kind, nor does it certify that this template is suitable or compliant for any particular jurisdiction or purpose.
Laws, regulations, industry practices and business requirements vary. You are responsible for reviewing and customising the template to suit your intended use and obtaining advice from appropriately qualified professionals where necessary.
Please delete this section before publishing your form. See our Terms of Service for further information.
This Commercial Lease Sublet and Alteration Approval Request Form is a thorough, well-structured instrument designed to collect a comprehensive set of information from a tenant who wishes to sublet part or all of their commercial premises, carry out physical alterations, or both. The form spans sixteen distinct sections, moving logically from basic identification and lease references through detailed descriptions of proposed subletting arrangements and physical works, cost breakdowns, contractor details, insurance and risk controls, building logistics, neighbour impact, reinstatement commitments, supporting documents, declarations, and finally a reviewer-only section. The overall design demonstrates a strong understanding of the multi-faceted nature of commercial property consent requests: it recognises that a reviewing party needs not just a summary of what is proposed, but also evidence of planning, risk management, financial transparency, and good neighbour relations. The form's progressive disclosure through conditional follow-ups (yes/no and option-based branching) keeps the experience manageable for respondents whose requests may involve only subletting, only alterations, or both.
The opening section sets clear expectations. The introductory paragraphs explain the purpose of the form, clarify that it is a general organisational template rather than professional advice, and note that required fields must be completed. This transparency is a notable strength: it reduces the risk of respondents assuming the form carries legal or regulatory authority.
Date of this request establishes a temporal anchor for the submission, which is operationally useful for tracking and correspondence. Reference number assigned to this request (if known) is an optional field that allows integration with any internal tracking system the applicant may already use — a thoughtful, low-friction addition.
This section captures who is submitting and how to reach them. Who is submitting this request? is a well-designed single-choice question with conditional follow-ups for external agents and other submitters, ensuring that the authority basis for the request is documented. Tenant organisation or trading name and Primary contact person establish the identity of the requesting party. Email address and Telephone number (including country and area code) provide two reliable communication channels. The inclusion of an Alternative or out-of-hours contact number and a Registered or correspondence address for the tenant adds depth without imposing burden, since both are optional. The yes/no question about copying correspondence to a third party, with a conditional follow-up requesting full contact details, is a practical touch that supports transparent communication workflows.
This section is critical for identifying the physical and contractual subject of the request. Building or property name, Full address of the premises, and Suite, unit, floor, or demised area reference together provide a precise location identifier. Lease or agreement reference number, Lease start date, and Lease expiry or next break date give the reviewer the contractual context. The numeric field for Approximate area of the demised premises paired with a unit-of-measure selector is a well-considered design choice that avoids ambiguity. The two yes/no questions about lease clauses governing subletting and alterations, and about side letters or variations, are particularly effective: their conditional follow-ups prompt respondents to quote or summarise relevant clauses, which can significantly speed up the reviewer's assessment. Name of the landlord, owner, or approving party and Property manager or managing agent (if any) complete the picture of the approval chain.
This section functions as the executive summary of the request. What type of approval are you requesting? is a well-designed single-choice question that covers subletting, alterations, both, assignment, and a pre-application guidance option — the last being a thoughtful inclusion for respondents who are not yet ready for a formal application. Is this request for part of the premises or the whole of the premises? narrows the scope. Date fields for preferred start and target completion, along with a yes/no question about fixed deadlines (with conditional follow-up), give the reviewer a clear sense of urgency. The open-ended summary field In your own words, summarise the proposal and the outcome you are hoping for is one of the most valuable questions in the form: it invites the respondent to articulate their intent in plain language, which can be more informative than structured data alone.
This extensive section is designed for requests involving another party occupying the premises. Which arrangement best describes what you are proposing? covers a range of common arrangements from formal subleases to co-working setups, with a conditional follow-up for other arrangements. Fields for the sub-occupier's name, business nature, and day-to-day use build a clear operational picture. The nested conditional logic in Is the proposed sub-occupier a related company, subsidiary, or affiliate of the tenant? is a particularly effective design: the yes branch asks for the relationship description, while the no branch probes for existing written agreements — both of which are relevant to the reviewer's assessment. Financial fields (proposed rent, cost contributions, and the question about whether rent exceeds the lease rent for the same area) promote transparency. Practical questions about headcount, dedicated facilities, shared area access, special uses (food preparation, hazardous materials, etc.), and management arrangements demonstrate a holistic approach. The closing question about remaining responsible for lease obligations, with a conditional follow-up if the answer is no, is a prudent inclusion.
This section addresses physical changes to the premises. Which categories of work are included in your proposal? is a comprehensive multiple-choice list covering everything from decoration to structural work, with a conditional follow-up for other categories. Describe the scope of the works in plain language, including what will be added, removed, or changed is a mandatory free-text field that provides the narrative backbone of the works proposal. A series of targeted yes/no questions — covering structural impact, exterior and common area effects, legacy materials, drilling into building fabric, hot works, and building service disruption — each with detailed conditional follow-ups, ensures that high-risk aspects are surfaced early. Programme fields (start date, completion date, duration, contractor headcount) and the question about continued occupancy during works round out the operational picture. The question about arrangements for staff, visitors, and deliveries during works encourages practical planning.
The table-based schedule of works is a standout feature. Its columns — include checkbox, work item description, quantity, unit of measure, estimated unit cost, and a calculated line total using a formula — provide transparent cost breakdowns. The pre-populated example rows help respondents understand the expected format. Additional fields for total cost, contingency allowance, funding source, and any landlord contribution complete the financial picture. This level of cost transparency is operationally valuable for a reviewing party assessing the scale and feasibility of the proposal.
This section captures who will deliver the works. Fields for the main contractor, contact details, and the tender process (with conditional follow-ups for the number of quotations or the selection rationale) support due diligence. The multiple-choice list of professional advisers is broad and practical. Questions about specialist subcontractors and on-site supervision (with a named supervisor and contact number) demonstrate a concern for accountability during execution.
This section is well-structured to capture the risk management framework. The multiple-choice insurance question covers common policy types, with a conditional follow-up for other cover. A free-text field for policy details (insurer, policy number, level of cover, expiry date) supports verification. The question about providing certificates before work starts, with timing options, sets clear expectations. The risk assessment question branches to a file upload if completed or a timeline explanation if not — a practical design. The control measures checklist, noise/disruption question, hazardous substances question, and fire safety question each use conditional follow-ups to elicit detail. The closing summary of main risks and controls encourages a consolidated risk narrative.
This section addresses how the works or new occupancy will integrate with the building's daily operation. The facilities checklist, working hours field, out-of-hours question, delivery and storage arrangements, waste disposal, external area use, scaffolding, service shutdowns, and site contact fields collectively cover the key logistical considerations. The design is practical and proportionate, recognising that disruption management is often a key concern for building managers.
This section shows a commendable awareness of the building community. Questions about neighbour notification (with conditional follow-ups for timing or response), objections, and affected aspects of building life are well-targeted. The matrix rating question — asking respondents to rate expected impact across eight building aspects on a five-point scale from no impact to severe impact — is an effective way to capture nuanced, comparable data. The closing question about disruption minimisation and responsive problem-solving rounds out the section.
This forward-looking section addresses what happens when the arrangement ends. The single-choice question about the intention for alterations (remove all, remove some, leave in place, depends, not yet decided) with conditional follow-ups for the first two options is well-designed. Questions about pre-works condition records (with file upload), reinstatement works, willingness to provide a deposit or bond (with conditional follow-ups for amount or explanation), and sub-occupier end-of-arrangement obligations demonstrate a thorough approach to lifecycle planning.
The document checklist is comprehensive, covering drawings, specifications, quotations, programmes, risk assessments, insurance, structural calculations, fire safety reviews, photographs, draft agreements, sub-occupier references, previous consents, neighbour notifications, accessibility reviews, and sustainability assessments. Multiple file upload fields are organised by document type, and a closing field for documents to be provided later (with expected dates) ensures nothing is lost. This section significantly enhances the reviewability of the submission.
This section provides a useful catch-all for information that does not fit elsewhere. The question about previous similar requests, the question about known concerns or disputes, and the preference for discussion format all support a transparent review process. The ranking question (asking respondents to rank six matters in order of importance) and the star rating for form clarity are thoughtful additions that provide feedback and help the reviewer understand the applicant's priorities.
The declarations section is well-constructed. Three mandatory checkboxes — confirming accuracy, acknowledging that the request is not an approval, and accepting that approval may be conditional — establish key understandings. Five additional optional checkboxes cover lease reading, sub-occupier compliance, qualified contractors, notification of changes, and data sharing. The signature block (name, position, date, and signature) is appropriately mandatory, providing a formal record of the applicant's attestation.
This final section is a practical addition for record-keeping. Fields for reviewer name, date received, status, conditions/notes, target decision date, and communication confirmation support an organised review workflow. Keeping this section clearly separated from the applicant's submission is a good design choice.
Strengths: The form's greatest strength is its comprehensive yet logically organised structure. It moves from identification through proposal detail, financial transparency, risk management, logistics, community impact, and lifecycle planning in a way that mirrors how a reviewer would naturally assess such a request. The extensive use of conditional follow-ups keeps the form relevant to the respondent's specific situation while still capturing depth where needed. The schedule of works table with its built-in calculation is a particularly effective feature. The declarations section and the reviewer-only section bookend the form with appropriate formality and administrative clarity. The form's introductory disclaimer about not being professional advice is a responsible and transparent touch.
Areas for Improvement: The form is extensive, and respondents with simple requests (for example, a minor decoration-only alteration) may find the overall length daunting even with conditional logic in place. Consider whether a brief summary or progress indicator could help respondents track their position within the form. Some sections, such as the subletting details and the alterations details, could benefit from clearer visual cues indicating which sections are applicable based on the request type selected in the Request Overview. Additionally, while the form captures a great deal of structured data, a few fields (such as the matrix rating for building impact) may benefit from brief explanatory text to help respondents calibrate their ratings consistently. Overall, however, the form is a well-designed, thorough instrument that balances depth of information with reasonable usability.
Mandatory Question Analysis for Commercial Lease Sublet and Alteration Approval Request Form
Important Note:
This section explains why certain fields in this form are marked as required and provides general guidance on how these requirements may support the collection of complete, accurate and relevant information.
Required fields and information-collection obligations may vary depending on your industry, jurisdiction, business operations and intended use of the form. A field marked as required in this template does not necessarily mean that collecting the information is legally mandatory.
Please review each required field to determine whether it is necessary, appropriate and lawful for your particular purpose. Consider applicable privacy, data protection, consent and industry-specific requirements, and consult an appropriately qualified legal, privacy or compliance professional where necessary.
Please delete this section before publishing your form. See our Terms of Service for further information.
Date of this request
Recommendation: Requiring this date anchors the submission in time, which supports chronological record-keeping and helps the reviewing party establish when the request was made relative to lease milestones or project deadlines. A submission date is a basic element of any organised request-tracking process. Form administrators may wish to consider whether an automatic timestamp could serve the same purpose, potentially reducing manual entry.
Tenant organisation or trading name
Recommendation: Requiring the tenant organisation or trading name ensures that each submission can be clearly attributed to the correct entity. In a commercial lease context, the identity of the tenant is central to the review, as the approving party needs to confirm which party is making the request and under which lease. This field supports accurate record-keeping and reduces the risk of misattributed or ambiguous submissions.
Primary contact person
Recommendation: Requiring a named primary contact ensures there is a clear point of accountability for the request. This supports efficient communication during the review process and helps the reviewing party direct queries or decisions to the right individual. The necessity of this field depends on the form creator's intended use, but in most operational contexts a named contact is a practical requirement for effective follow-up.
Email address
Recommendation: Marking the email address as mandatory supports reliable digital communication about the request, including acknowledgements, requests for further information, and the eventual decision. Email serves as a primary written record of correspondence. Depending on the form creator's data handling practices, consider providing a clear notice about how submitted contact details will be stored and used.
Telephone number (including country and area code)
Recommendation: Requiring a telephone number provides an alternative communication channel that can be valuable when time-sensitive queries arise or when email correspondence is delayed. Including the country and area code in the field prompt is a practical design choice that supports accurate dialling. Form administrators should consider whether a single contact number is sufficient or whether additional contact fields better serve their communication needs.
Building or property name
Recommendation: Requiring the building or property name ensures that the request is linked to a specific location. In multi-property portfolios, this is essential for routing the request to the correct reviewing party and for accurate record-keeping. This field supports the operational need to identify the premises without ambiguity.
Full address of the premises
Recommendation: Requiring the full address of the premises provides a precise location identifier that complements the building name. This is particularly useful where a building may contain multiple suites or units, or where the address format varies. A complete address supports accurate correspondence, site visits, and document cross-referencing.
Suite, unit, floor, or demised area reference
Recommendation: Requiring the specific suite, unit, or floor reference narrows the request to the exact area within the building that is the subject of the proposal. This is operationally important for reviewing parties who need to assess the spatial scope of a subletting or alteration request. The necessity of this field depends on the building's layout and the form creator's identification conventions.
What type of approval are you requesting?
Recommendation: Requiring this selection establishes the fundamental scope of the request at the outset. It enables the reviewing party to categorise the submission and, in a form with conditional sections, helps direct the respondent to the relevant detail sections. This field is central to the form's operational logic and supports efficient triage of incoming requests.
Is this request for part of the premises or the whole of the premises?
Recommendation: Requiring this scope definition helps the reviewing party understand the proportion of the premises affected. Whether the request covers part or the whole of the premises can significantly influence the review considerations, and capturing this early supports proportionate assessment. The third option (part now, with the possibility of more later) is a thoughtful inclusion that captures phased intentions.
In your own words, summarise the proposal and the outcome you are hoping for
Recommendation: Requiring a plain-language summary ensures that every submission includes a narrative description of the proposal, which can be more informative and accessible than structured data alone. This field supports the reviewing party's understanding of the applicant's intent and desired outcome. It also provides a useful reference point when the structured fields are reviewed in detail.
Describe the scope of the works in plain language, including what will be added, removed, or changed
Recommendation: Requiring a description of the works scope ensures that alteration requests are accompanied by a clear narrative of what is physically proposed. This supports the reviewing party's ability to judge the scale, duration, and impact of the works. The necessity of this field is most apparent for requests involving alterations; for subletting-only requests, the form's conditional structure may mean this field is less relevant, and form administrators should consider whether conditional mandatory logic could be applied here.
I confirm that the information given in this form is accurate and complete to the best of my knowledge.
Recommendation: Requiring this declaration checkbox establishes that the applicant attests to the accuracy of the information provided. This supports data quality and record-keeping integrity, as it records the applicant's stated understanding and responsibility. It is a standard element of formal request processes and helps set expectations for the reviewing party.
I understand that this request is not an approval and that no work or sub-occupancy should begin until written confirmation is received from the approving party.
Recommendation: Requiring this acknowledgement helps ensure that the applicant understands the status of their submission. It records that the request is a proposal, not a permission, which is an important operational distinction. This declaration supports clear communication of the process and may help prevent premature action by the applicant.
I understand that any approval may be subject to conditions, including changes to the scope, additional documents, insurance evidence, or reinstatement arrangements.
Recommendation: Requiring this acknowledgement records that the applicant understands that approval, if granted, may carry conditions. This supports transparent expectations and reduces the risk of misunderstandings later in the process. It is a practical declaration that helps both parties manage the review and any subsequent arrangements.
Name of the person signing this request
Recommendation: Requiring the signatory's name provides a clear record of who is making the declarations and attesting to the submission. This supports accountability and record-keeping. In most operational contexts, a named signatory is a practical element of any formal request or declaration.
Position or role held
Recommendation: Requiring the signatory's position or role helps the reviewing party understand the authority level of the person making the request. This is operationally relevant in a commercial context where the approving party may wish to confirm that the signatory has the authority to bind the tenant or make commitments on its behalf.
Date of signature
Recommendation: Requiring the date of signature provides a formal record of when the declarations were made. This supports chronological record-keeping and can be relevant if the proposal changes over time or if the review period extends. It complements the request date captured earlier in the form.
Please sign to confirm the declarations above
Recommendation: Requiring a signature provides a formal, verifiable record of the applicant's attestation to the declarations. This is a standard element of formal request processes and supports the integrity of the submission. The format of the signature (electronic, drawn, or uploaded) should be consistent with the form creator's record-keeping practices.
The form employs a substantial number of mandatory fields — nineteen in total — distributed across identification, premises reference, request overview, works description, and declarations sections. This is a proportionate approach given the form's comprehensive purpose: a commercial lease sublet or alteration request typically requires a detailed, well-documented submission to support a fair and informed review.
Balancing data collection depth against completion rates: The mandatory fields are concentrated in areas that are foundational to the request (identity, contact, premises, scope, and declarations), which is a sensible strategy. However, the overall length of the form, combined with the number of mandatory fields, may present a barrier for respondents with straightforward or minor requests. Consider whether a progress indicator or section-completion summary could help respondents manage the effort. Form administrators may also wish to periodically review completion rates and feedback to identify any mandatory fields that consistently cause delays or abandonment.
Conditional logic and mandatory fields: The form already uses extensive conditional follow-ups, which is a strength. One area where conditional mandatory logic could be beneficial is the works description field (Describe the scope of the works in plain language): for requests that involve subletting only (with no alterations), this field may be less relevant. If the form platform supports conditional mandatory status, applying it here could improve the experience for subletting-only applicants.
Best practices for mandatory field selection and placement: The form generally follows good practice by placing mandatory identification fields early, mandatory scope fields in the middle, and mandatory declarations at the end. This structure gives respondents a clear sense of what is required at each stage. The declarations section, in particular, benefits from being at the end: respondents are more likely to accurately confirm the information after they have completed the rest of the form.
Observations on the number and placement of mandatory fields: With nineteen mandatory fields across a fifteen-section form, the mandatory-to-optional ratio is relatively low, which is appropriate for a form of this complexity. The concentration of mandatory fields in the identification and declaration sections is well-judged. Form administrators should consider whether any of the mandatory fields in the Premises and Lease Reference section (such as the suite/unit reference) could be made optional for simpler requests, while retaining them as mandatory for more complex submissions. Overall, the mandatory field strategy is well-aligned with the form's purpose of producing a thorough, reviewable submission.