Industrial & Commercial Water Treatment Inquiry Form

1. Business & Contact Information

This form helps us design an accurate, site-specific water treatment proposal. All fields marked mandatory must be completed to avoid delays.


Company/Facility Name

Department or Division

Primary Contact Name

Job Title/Role

Email Address

Direct Phone/WhatsApp

Project Location (City, Region)

Preferred communication language for technical documents

2. Industry, Application & Criticality

Industry Sector

Primary application for treated water

Is water quality critical to product safety or regulatory compliance?


Do you operate 24/7 with limited shutdown windows?

How many hours per day is water required?

How many days per week?


3. Raw Water Source & Historical Issues

Primary raw water source

Have you experienced seasonal quality swings (>30% change in any parameter)?


Have you had membrane fouling or scaling incidents in the past 3 years?

Have you recorded Legionella or other microbial positives?

Describe any previous treatment equipment and why it failed to meet needs

4. Raw Water Chemistry (Enter Latest Lab Data If Available)

If you do not have lab data, leave blank; we will arrange local sampling.


pH (unitless)

Conductivity (µS/cm @ 25°C)


Total Dissolved Solids TDS (mg/L)

Total Suspended Solids TSS (mg/L)


Total Hardness as CaCO₃ (mg/L)

Calcium (mg/L Ca)


Magnesium (mg/L Mg)

Bicarbonate Alkalinity (mg/L HCO₃)


Chloride (mg/L Cl)

Sulphate (mg/L SO₄)


Silica (mg/L SiO₂)

Total Iron (mg/L Fe)


Manganese (mg/L Mn)

Hydrogen Sulphide H₂S (mg/L)


Total Bacteria Count (CFU/100 mL)

Attach full water analysis report (PDF preferred)

Choose a file or drop it here
 

5. Required Treated Water Specifications

Required Flow Rate (m³/h) at peak

Minimum flow for turndown (m³/h)


Target Conductivity (µS/cm)

Target TDS (mg/L)


Target Hardness (mg/L as CaCO₃)

Target Chloride (mg/L)


Target Silica (mg/L)

Required pH Range


Maximum Particle Size Allowed (µm)

Target Total Bacteria Count (CFU/100 mL)


End-Point Residual Chlorine (mg/L Cl₂) - if any

Special limits (e.g. endotoxin <0.25 EU/mL, TOC <500 ppb)

6. Technology Preferences & Footprint

Which technologies are you open to? (select all)

Is energy recovery (e.g. RO concentrate PX) desired?

Do you require explosion-proof or ATEX-rated components?

Maximum allowable footprint (m²)

Height restriction (m)


Intended installation location

7. Energy, Consumables & Sustainability Goals

Electricity tariff ($/kWh)

Preferred membrane cleaning approach

Do you have renewable energy (solar/wind) on-site?

Is concentrate reuse or recycling possible?

Do you need Scope 3 carbon reporting data for this equipment?

Rate the importance of low energy consumption (1 = not, 5 = critical)

Rate the importance of minimal chemical waste (1 = not, 5 = critical)

8. Maintenance, Service & Spare-Parts Strategy

Preferred service model

Do you stock spare pumps/motors on-site?

Are unionised labour rules restrictive for external technicians?

Target membrane life (years)

Maximum acceptable unplanned downtime per year (hours)

Will you need operator training certification (e.g. 4-hour CPD)?


9. Budget, Timeline & Evaluation Criteria

Budget range (CAPEX) if established

Expected annual operating cost OPEX ceiling


Required proposal delivery date

Planned purchase order release date


Target commissioning date

Evaluation weighting (top criterion)

Is leasing or pay-per-cubic-metre model acceptable?

Is government subsidy or green-bond financing involved?

10. Additional Details & Attachments

Any other constraints or project background?

Upload P&ID, site photos, or previous quotes (zip multiple files)

Choose a file or drop it here
 

Subscribe to quarterly water-tech best-practice newsletter?

I certify that the above information is accurate to the best of my knowledge

Authorised Signatory


Analysis for Industrial & Commercial Water Treatment Inquiry Form

Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.

Overview

This Industrial & Commercial Water Treatment Inquiry Form is a best-practice example of technical qualification done right. By forcing the user to articulate business identity, water chemistry, duty cycle and treated-water targets up-front, the supplier can pre-size equipment, forecast operating costs and flag permitting issues before committing engineering hours. The form’s length is justified because every section maps directly to a design or commercial decision, dramatically shortening the traditional back-and-forth of water-proposal workflows.


The progressive disclosure pattern—collecting mandatory high-level facts first, then letting specialists optionally paste lab data or upload P&IDs—keeps the cognitive load manageable while still capturing the depth needed for an accurate quote. Conditional follow-ups (e.g., only asking for “Other language” when “Other” is selected, or exposing regulatory standards only when water quality is safety-critical) ensure that irrelevant fields never clutter the screen, which reduces abandonment.


Business & Contact Information

Company/Facility Name anchors every downstream document—proposal, equipment drawings, customs declarations and service contracts—so making it mandatory is non-negotiable. The field accepts any string, which is forgiving for multi-entity conglomerates or university departments, yet the label is specific enough to discourage private individuals from treating the form like a residential quote request.


Primary Contact Name, Email Address, Direct Phone/WhatsApp form a classic iron-triangle of reachability. Taken together they give the supplier two asynchronous (email, WhatsApp) and one synchronous (phone) channel, covering most global business cultures. The form explicitly labels WhatsApp as acceptable, which is a small but telling nod to regions where mobile data is cheaper than voice.


Project Location (City, Region) is the first geo-pin that drives freight cost, voltage standard, ambient corrosion category and local water chemistry assumptions. Because water chemistry is hyper-local, this field is more important than country alone; the prompt’s granularity to “City, Region” invites the user to add the nearest logistics landmark, which is invaluable for freight estimates.


The optional Department or Division and Job Title/Role fields allow the CRM to route leads to the correct vertical team (e.g., pharma vs. food) and to tailor technical depth in subsequent correspondence. Keeping them optional respects smaller firms where one person wears many hats, yet their presence encourages richer CRM segmentation for enterprises.


Industry, Application & Criticality

Industry Sector and Primary application for treated water are both mandatory because they determine which design standards, metallurgies and validation protocols will apply. For example, selecting “Micro-electronics/Semiconductor” immediately triggers ultra-pure water sizing rules (TOC <1 ppb, resistivity >18 MΩ·cm), whereas “Commercial Laundry” shifts the focus to softening and hardness leakage economics. The conditional text box for “Other” industry prevents edge-case users from being forced into an inaccurate category, preserving data integrity.


The yes/no pivot Is water quality critical to product safety or regulatory compliance? is brilliantly placed because it gates an entire layer of GMP, FDA or Halal documentation that can swing cost and lead-time by 30–50%. Making this mandatory avoids the nightmare scenario where a pharmaceutical client receives a quote that omits validation documentation because they forgot to tick a box.


How many hours per day is water required? and How many days per week? quantify duty cycle, which in turn sizes buffer tanks, standby pumps and membrane clean-in-place (CIP) frequency. These two numerics are mandatory because they feed directly into the equipment CAPEX line-item; without them, engineers would have to assume 24/7 operation, potentially oversizing and overpricing the system.


Raw Water Source & Historical Issues

Primary raw water source is mandatory because it is the single biggest predictor of pretreatment complexity. Municipal water may only need softening, whereas bore-well water with high iron and manganese could mandate oxidative filtration, greensand or even reverse-aerosol pretreatment. The option list covers the 90th-percentile of global scenarios, and the conditional “Other” free-text prevents forced misclassification.


The seasonal swings and membrane-fouling history questions are optional but strategically placed. Users who answer “yes” to seasonal swings are implicitly flagged for pilot testing or for a more conservative design factor, which protects both parties from warranty disputes later. Similarly, a positive answer to past membrane fouling invites the supplier to recommend anti-scalant or CEB (chemically-enhanced backwash) upgrades, increasing project value while solving a known pain-point.


Raw Water Chemistry

This entire section is optional with a gentle disclaimer: “If you do not have lab data, leave blank; we will arrange local sampling.” This approach removes a major completion barrier—many small businesses lack recent lab reports—while still encouraging high-quality prospects to attach PDFs. The numeric fields are granular enough to run ion-balance checks and scaling indices (Langlier, Ryznar, Stiff-Davis) in the supplier’s sizing software, which shortens technical review from days to minutes.


The file-upload for the “full water analysis report” accepts PDF, which preserves lab letterhead and QA signatures; this is superior to asking users to re-key values and risk transcription errors. Overall, the section balances scientific rigor with user empathy.


Required Treated Water Specifications

Only Required Flow Rate (m³/h) at peak is mandatory here, because it is the fundamental sizing parameter. All other targets are optional, allowing prospects who only know “we need 5 m³/h of low-conductivity water” to still receive a meaningful budget quote, while sophisticated users can paste end-of-pipe specs (endotoxin <0.25 EU/mL, TOC <500 ppb) and receive a validated pharma-grade design.


The form cleverly mirrors raw-water chemistry fields (Conductivity, TDS, Hardness, Chloride, Silica) in the treated-water section, making side-by-side comparisons trivial for both user and supplier. This symmetry reduces email iterations and accelerates the technical approval loop.


Technology Preferences & Footprint

All fields in this section are optional, which respects the reality that many buyers want the vendor to recommend the optimum technology stack. The multiple-choice checklist covers the entire water-treatment palette, letting users express openness to novel solutions like Continuous Electro-deionisation (CEDI) or Zero Liquid Discharge (ZLD) without forcing a binary yes/no. Footprint and height restrictions are numeric rather than categorical, enabling the supplier’s layout team to test 3-D equipment arrangements against available space.


Energy, Consumables & Sustainability Goals

Optional numeric fields such as Electricity tariff (USD/kWh) and 1-to-5 ratings for energy and chemical-waste importance feed directly into life-cycle cost (LCC) models. These data allow the supplier to quantify annual operating cost and carbon footprint, differentiating their proposal from competitors who quote only CAPEX. The section aligns with corporate ESG mandates and green-bond financing, increasingly decisive in industrial capex decisions.


Maintenance, Service & Spare-Parts Strategy

The optional service-model selector enumerates four commercial frameworks from “Client Operated” to full “O&M by Vendor,” enabling the supplier to attach service contracts, performance guarantees or even lease models. Numeric fields like Target membrane life (years) and Maximum acceptable unplanned downtime per year (hours) quantify reliability expectations, which feed into redundancy decisions (duplex pumps, standby RO trains) and ultimately into price and delivery.


Budget, Timeline & Evaluation Criteria

Only Required proposal delivery date is mandatory, ensuring the sales team can filter opportunities that cannot be quoted in time. Keeping budget fields optional reduces early-stage sticker-shock while still allowing procurement to signal affordability ceilings. The single-choice Evaluation weighting (top criterion) forces the buyer to prioritize one lever—cost, speed, footprint or service—preventing the supplier from over-engineering every attribute simultaneously.


Additional Details & Attachments

The checkbox I certify that the above information is accurate… is mandatory for legal reasons, while the newsletter opt-in and file-upload are optional. This arrangement keeps the form GDPR-friendly: consent is freely given for marketing, while the certification checkbox stands alone as a compliance gate.


Overall Strengths & Weaknesses

Strengths: (1) Laser-focused mandatory fields ensure that even a minimally completed form still yields a quotable scope. (2) Conditional logic reduces cognitive burden and prevents irrelevant questions. (3) Numeric and file-upload fields enable direct import into engineering software, slashing turnaround time. (4) Sustainability and service-model questions position the supplier as a lifecycle partner, not a commodity vendor. (5) Clear section headings and plain-language explanations make the form accessible to both PhD chemists and maintenance managers.


Weaknesses: (1) At 60+ fields, the form can feel daunting; a save-and-resume feature would reduce abandonment. (2) Some numeric fields lack unit validation (e.g., pH could accept 15), risking garbage-in-garbage-out. (3) No progress indicator is shown, so users cannot estimate completion time. (4) Optional budget fields might still trigger sticker-shock if the supplier later quotes above the unstated ceiling. (5) The signature field is not marked mandatory, creating potential legal ambiguity.


Mandatory Question Analysis for Industrial & Commercial Water Treatment Inquiry Form

Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.

Mandatory Field Justifications

Company/Facility Name
Justification: This is the legal entity that will sign the purchase contract and hold warranty rights. Without it, the supplier cannot perform credit checks, issue compliance certificates or register the equipment for local service. It is the anchor for every downstream document.


Primary Contact Name
Justification: A named individual is required for audit trails, safety clarifications and emergency shutdown decisions. Generic addresses like “info@” are insufficient when FDA or ISO audits demand traceable human accountability.


Email Address
Justification: All technical submittals, safety data sheets and regulatory appendices are shared electronically. Email is the only asynchronous channel that supports large attachments (P&IDs, IO lists) while maintaining a time-stamped record.


Direct Phone/WhatsApp
Justification: Water-treatment projects often involve urgent field changes (e.g., higher iron discovered during piloting). A real-time voice or chat channel prevents weeks of email lag that could delay commissioning and incur liquidated damages.


Project Location (City, Region)
Justigation: Water chemistry, ambient temperature and freight cost vary hyper-locally. This field drives membrane flux assumptions, corrosion category and spare-parts stocking strategy; without it, engineering must over-design, inflating price and delivery.


Industry Sector
Justification: Design codes, metallurgy and validation protocols are industry-specific. A semiconductor fab demands polypropylene piping and 18 MΩ·cm resistivity, while a laundry only needs softening. Mis-classification here triggers costly re-design.


Primary application for treated water
Justification: The application dictates the failure mode—product contamination, boiler scaling or Legionella outbreak. Knowing whether water is a “process ingredient” versus “general utilities” sets the risk matrix that governs redundancy and instrumentation level.


Is water quality critical to product safety or regulatory compliance?
Justification: This single yes/no flag determines whether the proposal must include IQ/OQ documentation, FDA-compliant materials and third-party validation. Missing this requirement can invalidate an entire pharmaceutical batch or cause a food recall.


How many hours per day is water required?
Justification: Duty cycle directly sizes buffer tanks, standby pumps and membrane area. An undersized system that sees 24/7 demand will fail within months; oversizing inflates CAPEX. Accurate hours prevent both scenarios.


How many days per week?
Justification: Intermittent operation allows for longer CIP cycles and lower membrane counts, whereas 7-day plants need duplex trains. This numeric is multiplied by hourly flow to yield annual throughput, the basis for membrane life and chemical consumption forecasts.


Primary raw water source
Justification: The source predicts contaminant spectrum—municipal chloramines, bore-well arsenic, seawater salinity. This single choice sets the pretreatment chain and governs whether reverse osmosis is even viable without energy-recovery devices.


Required Flow Rate (m³/h) at peak
Justification: Peak flow is the fundamental sizing parameter for pumps, membranes and piping. Without it, any quotation is purely hypothetical and non-contractual.


Required proposal delivery date
Justification: Engineering resources are finite; this date allows the supplier to prioritize opportunities and allocate lead chemical engineers. Missing a client’s internal deadline often disqualifies the vendor regardless of technical merit.


I certify that the above information is accurate…
Justification: This checkbox creates a legally binding attestation that protects the supplier against claims of mis-design if the client later supplies contradictory data. It is a standard risk-transfer clause in capital-equipment contracts.


Overall Mandatory Field Strategy Recommendation

The form strikes an intelligent balance: only 14 out of 60+ fields are mandatory, ensuring that even a rushed facilities manager can submit a quotable package in under five minutes. This ratio (≈23%) aligns with best-practice benchmarks for technical B2B forms, maximizing lead volume while preserving data integrity.


To further optimize, consider making budget and footprint fields conditionally mandatory when “Smallest Footprint” or “Lowest Life-Cycle Cost” is selected as the top evaluation criterion, since those choices are meaningless without context. Implementing a save-and-resume feature would mitigate abandonment among users who lack lab data, while still preserving the current lean mandatory set. Finally, add inline unit validation (e.g., pH 0–14) to prevent garbage inputs that could corrupt engineering calculations.


Want to make this form template a perfect reflection of your distinct needs and preferences? Edit this Industrial & Commercial Water Treatment Inquiry Form
Tables so smart they breathe numbers:
🌬️ Zapof fields
📟 Update in real-time
👀 Leaving users wide-eyed
This form is protected by Google reCAPTCHA. Privacy - Terms.
 
Built using Zapof