Comprehensive Review System for Exterior Signage & Internal Architectural Changes

1. Section 1: Tenant Details & Suite Identifier - Core Business Information and Lease Context

This section captures essential tenant identification and lease context to establish the requestor's legal standing and operational parameters within the property.

 

Legal Business Entity Name (as registered in lease agreement)

Primary Contact Person Full Name

Contact Person Job Title

Direct Phone Number

Official Email Address

Property Suite/Unit Number(s) Affected

Total Leased Area (square meters/square feet)

Current Lease Commencement Date

Current Lease Expiration Date

Business Activity Classification

Is this request for exterior signage, internal structural changes, or both?

 

Select the primary modification type

 

Please describe the nature of your modification request in detail:

Does your lease agreement explicitly permit modifications of this nature?

 

Please cite the specific lease clause(s) and provide verbatim text:

 

WARNING: Your lease may not permit such modifications. This request may require lease amendment negotiations before proceeding.

Have you previously submitted modification requests for this suite?

 

How many previous requests have been submitted in the past 24 months?

2. Section 2: Design Mockups & Engineering Specifications - Technical Documentation and Visual Representation

Submit comprehensive technical documentation including visual mockups, engineering calculations, and material specifications. Incomplete submissions will delay review.

 

Upload High-Resolution Visual Mockups (minimum 300 DPI) showing proposed modification from multiple angles

Choose a file or drop it here

Upload Certified Engineering Drawings (PDF format, stamped by licensed engineer)

Choose a file or drop it here
 

Upload Structural Load Calculations and Stress Analysis Reports

Choose a file or drop it here
 

Detailed Dimensional Specifications

Component Description

Height (cm/inches)

Width (cm/inches)

Depth/Thickness (cm/inches)

Weight (kg/lbs)

Material Composition

A
B
C
D
E
F
1
Primary Structure
0
0
0
0
e.g., Aluminum Alloy 6061-T6
2
Mounting Hardware
0
0
0
0
e.g., Stainless Steel Grade 316
3
 
 
 
 
 
 
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Describe the aesthetic design intent and how it aligns with property branding standards

What is the primary material category for the proposed modification?

Will the modification incorporate electrical components or lighting systems?

 

Electrical Specifications

Component Type

Voltage (V)

Power Draw (Watts)

Circuit Protection Required

Emergency Shut-off Needed?

A
B
C
D
E
1
LED Illumination
120
150
20A GFCI
Yes
2
Digital Display
240
500
30A Dedicated
Yes
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Does the design include moving or dynamic components (motors, rotation, articulation)?

 

Describe mechanical systems, range of motion, operating frequency, and safety interlocks:

Upload Product Data Sheets and Manufacturer Specifications for all major components

Choose a file or drop it here
 

Upload Wind Load Certification and Environmental Durability Test Reports

Choose a file or drop it here
 

Expected Lifespan of Installation (years)

Total Project Budget (excluding fees)

Will the modification require penetration of external building envelope (walls, roof, facade)?

 

Detail waterproofing methods, flashing details, and thermal barrier continuity solutions:

3. Section 3: Structural, Electrical, & Local Code Impact Check - Comprehensive Risk and Compliance Assessment

This critical section evaluates potential impacts on building systems, structural integrity, and regulatory compliance. All statements require supporting documentation.

 

Structural Impact Assessment - Rate the potential effect on following building elements

No Impact

Minimal Impact

Moderate Impact

Significant Impact

Severe Impact Requiring Reinforcement

Existing Load-Bearing Walls

Floor Slab Capacity

Roof Structure

Foundation Systems

Facade Integrity

Vibration Transmission to Adjacent Suites

Has a licensed structural engineer evaluated the proposal and confirmed building capacity?

 

Upload Signed and Stamped Structural Adequacy Letter

Choose a file or drop it here
 
 

CRITICAL: Structural engineer evaluation is mandatory before this request can proceed. Please retain a qualified engineer.

Additional Dead Load Imposed (kg/lbs)

Additional Live Load Imposed (kg/lbs)

Will the modification affect shared building electrical systems or require new electrical room access?

 

Describe impact on main distribution panels, transformer capacity, and backup power systems:

Which building code categories require formal review? (Select all that apply)

Does the proposal maintain required fire ratings for walls, floors, or ceilings?

 

Explain proposed alternative fire protection measures and submit fire engineer assessment:

Will the modification impact accessibility routes, door widths, or accessible facilities?

 

Detail how accessibility compliance will be maintained or enhanced:

Are there adjacent tenants whose operations could be disrupted by vibration, noise, or visual obstruction?

 

Adjacent Tenant Impact Analysis

Adjacent Suite Number

Tenant Business Type

Potential Impact Description

Tenant Notified?

Tenant Objection Received?

A
B
C
D
E
1
Suite 449
Law Office
Noise during installation hours
 
 
2
 
 
 
 
 
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Does the building have any heritage, conservation, or architectural significance restrictions?

 

List all applicable restrictions and submit heritage/conservation authority approval letters:

Will the modification generate waste requiring special disposal (hazardous materials, asbestos risk)?

 

Describe waste classification and certified disposal plan:

Upload Professional Liability Insurance Certificate for all contracted professionals (engineers, architects)

Choose a file or drop it here
 

Upload Building Code Compliance Checklist or Third-Party Code Review Report

Choose a file or drop it here
 

4. Section 4: Installation Schedule & Worksite Disruption Plan - Project Execution and Stakeholder Management

Provide a detailed project execution plan that minimizes disruption to building operations and ensures safety for all occupants throughout the installation process.

 

Requested Installation Start Date

Requested Installation Completion Date

Total Estimated Installation Duration (calendar days)

Installation Phase Breakdown

Phase Name

Phase Start Date

Phase End Date

Primary Activities

Noise Level (dB) / Disturbance Type

Requires After-Hours Work?

A
B
C
D
E
F
1
Preparation & Mobilization
8/1/2025
8/3/2025
Material delivery, site setup
70 dB/Occasional
 
2
Structural Installation
8/4/2025
8/10/2025
Mounting, welding, assembly
85 dB/Continuous
Yes
3
 
 
 
 
 
 
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

What are the proposed daily working hours?

Will installation require building systems shutdown (electrical, HVAC, water)?

 

Specify systems affected, duration of shutdown, and alternative arrangements for affected tenants:

Will the installation require crane, hoist, or heavy equipment on-site?

 

Heavy Equipment Logistics Plan

Equipment Type

Lifting Capacity

Setup Location

On-site Date/Time

Requires Road/Sidewalk Closure?

A
B
C
D
E
1
Mobile Crane
5 tons
North Loading Zone
8/4/2025, 6:00 AM
Yes
2
 
 
 
 
 
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Will contractors require 24/7 access to the building during installation?

 

Justify continuous access requirement and detail security protocols for after-hours presence:

Describe dust, debris, and noise mitigation strategies to protect adjacent occupied spaces

Has a tenant communication plan been prepared to notify affected parties?

 

Upload Sample Tenant Notification Letter

Choose a file or drop it here
 
 

MANDATORY: You must prepare and submit a tenant communication plan at least 10 business days before installation start date.

Describe emergency evacuation and fire safety protocols during construction

Will the installation generate waste requiring temporary storage on-site?

 

Specify storage location, containment methods, and removal schedule:

Describe post-installation cleanup standards and building restoration procedures

Do you agree to pay for any building damage caused during installation?

 

This request cannot proceed without agreement to assume liability for installation-related damages.

5. Section 5: Property Management & Structural Engineer Sign-Off - Professional Review and Final Authorization

This section is reserved for official reviews, professional assessments, and final authorization decisions by property management and certified engineering professionals.

--- PROPERTY MANAGEMENT INITIAL REVIEW ---

 

Property Manager Name

Initial Review Date and Time

Are all required tenant submissions complete and legible?

 

List all missing or deficient documentation items:

Rate the completeness and quality of tenant submission package (1=Poor, 5=Excellent)

 

--- STRUCTURAL ENGINEER ASSESSMENT (MANDATORY) ---

 

Licensed Structural Engineer Name

Professional License/Registration Number

Engineering Assessment Date

Engineer's Risk Assessment - Rate risk levels for each category

Negligible Risk

Low Risk

Moderate Risk

High Risk

Critical Risk - Not Recommended

Structural Failure Risk

Public Safety Hazard

Property Damage Potential

Long-term Durability

Compliance with Engineering Standards

Does the engineer approve the structural design as submitted?

 

Specify required design modifications and conditions for re-approval:

Upload Signed Structural Engineer Approval Stamp/Seal

Choose a file or drop it here
 
 

--- CODE CONSULTANT REVIEW (IF APPLICABLE) ---

 

Was external code consultant review required?

 

Code Consultant Name and Firm

 

--- FINAL PROPERTY MANAGEMENT DETERMINATION ---

 

Final Approval Decision

Conditions of Approval (if applicable) - List all requirements, restrictions, and tenant obligations

Does this approval require a formal lease amendment or addendum?

 

Specify lease amendment clauses and tenant cost responsibility:

Administrative Review Fee (if applicable)

Security Deposit Required for Potential Damages

Approval Expiration Date (if request not executed by this date, re-submission required)

Property Manager Digital Signature

Structural Engineer Digital Signature and Stamp

Final Approval Document Tracking Number

 

--- TENANT ACKNOWLEDGMENT ---

 

Tenant acknowledges all conditions and agrees to comply with all property management requirements?

 

This approval is not valid without tenant acknowledgment and agreement to conditions.

Tenant Authorized Representative Signature

Tenant Signature Date and Time

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.