Project Name
Project / Job Number
Date of Log
Form Completed By (Name)
Role / Title
Foreman
Site Superintendent
Project Manager
Safety Officer
Weather Conditions
Clear
Sunny
Rain / Wet
Wind / Gusts
Extreme Heat
Ice / Snow
Temperature (°F / °C)
Site Ground Conditions
Dry
Muddy
Frozen
Standing Water
Dusty
List all independent subcontractor companies operating on site today. Fill out one row per trade team, ensuring worker counts and shift hours reflect actual on-site attendance. If a subcontractor has multiple shifts or scopes, enter them on separate lines.
Subcontractor / Company Name | Trade / Scope of Work | No. of Workers | Arrival Time | Departure Time | Supervisor on Site | ||
|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | ||
1 | |||||||
2 | |||||||
3 | |||||||
4 | |||||||
5 | |||||||
6 | |||||||
7 | |||||||
8 | |||||||
9 | |||||||
10 |
Total Workforce On-Site Today
Primary Areas / Zones Worked Today
Detailed Summary of Work Completed
Deliveries Received Today
Heavy Machinery / Equipment Utilized On-Site
Crane
Excavator
Scissor Lift
Boom Lift
Telehandler
Skid Steer
Concrete Pump
Other:
Were there any project delays today?
If Yes, specify reason
Weather
Material Shortage
Subcontractor No-Show
Inspection Delay
Design/RFI Issue
Utility Outage
Delay Description & Impacted Hours
Official Inspections Conducted Today
Inspecting Agency / Entity
Inspection Result
Pass
Conditional Pass
Fail
N/A
Inspector Notes / Comments
Mark each item as Pass, Fail, or N/A.
Inspection / Safety Checklist Item | Pass | Fail | N/A | ||
|---|---|---|---|---|---|
A | B | C | D | ||
1 | 1. General Site Safety & PPE | ||||
2 | 1.1 All personnel on-site wearing mandatory PPE (Hardhat, High-Vis, Boots, Eye Protection)? | ||||
3 | 1.2 First Aid kits fully stocked and accessible in primary zones? | ||||
4 | 1.3 Emergency contact list and egress routes posted and clear? | ||||
5 | 2. Housekeeping & Hazard Control | ||||
6 | 2.1 Walkways, stairs, and access routes free of debris, cords, and scrap? | ||||
7 | 2.2 Trash, hazardous waste, and combustible material disposed of properly? | ||||
8 | 2.3 Material storage secure and stable? | ||||
9 | 3. Fall Protection & Access | ||||
10 | 3.1 Guardrails, mid-rails, and toe-boards installed on open edges/floors? | ||||
11 | 3.2 Floor openings covered, secured, and clearly marked? | ||||
12 | 3.3 Scaffolding inspected, tagged, and fully planked? | ||||
13 | 3.4 Ladders tied off, inspected, and extending 3ft past landing? | ||||
14 | 4. Electrical & Equipment | ||||
15 | 4.1 Temporary power panels covered and GFCI protection active? | ||||
16 | 4.2 Extension cords inspected (no tears, exposed wires, or missing ground pins)? | ||||
17 | 4.3 Heavy equipment operators completed daily pre-start inspection logs? |
Were there any safety incidents, near-misses, or injuries today?
If Yes, complete the following sub-section:
Incident Type
First Aid Injury
Recordable Injury
Near Miss
Property Damage
Environmental Spill
Time of Incident
Subcontractor / Company Involved
Individuals Involved / Witness Names
Description of Incident or Near-Miss
Immediate Corrective Actions Taken
Formal Incident Report Filed?
Yes
Pending
No
Daily Site Progress Photos | Delivery Tickets / Material Receipts | Safety Meeting / Toolbox Talk Access Sheet | ||
|---|---|---|---|---|
A | B | C | ||
1 | ||||
2 | ||||
3 | ||||
4 | ||||
5 |
By signing below, I certify that the information provided in this log is an accurate record of daily activities, subcontractor presence, and safety conditions observed on site.
Superintendent / Logging Officer Signature
Form Template Insights
Please remove this form template insights section before publishing.
Understanding why every single field in the Daily Subcontractor Log & Site Safety Checklist exists helps jobsite leaders move away from viewing daily reports as simple paperwork and start seeing them as vital operational toolkits. Every section serves a distinct purpose that protects your project, your workforce, and your financial bottom line.
Here is a comprehensive breakdown of why each part of this form is essential to your daily jobsite management:
Mandatory Questions Recommendation
Please remove this mandatory questions recommendation before publishing.
Making key questions mandatory prevents incomplete daily logs, which are often no better than having no log at all. Missing information creates gaps in site history, weakens safety oversight, and leads to costly project disputes.
Here are the mandatory questions every contractor must enforce on this form, along with the operational reasons why optional answers should never be permitted.
To configure an element, select it on the form.