Rooftop HVAC Preventive Maintenance Form — Chillers, Air Handling Units & Ductwork

1. Purpose, Scope & Instructions

This form is intended to document a preventive maintenance (PM) visit on a commercial rooftop HVAC system, including air-cooled package or modular chillers, air handling units (AHUs), and the associated distribution ductwork. Record actual observed values and conditions rather than assumed or typical values. Where a reading could not be taken, note the reason in the remarks field. This template is provided for general information and record-keeping convenience only; it is not a substitute for the equipment manufacturer's documentation, site-specific procedures, or advice from qualified professionals.

Fields marked as required must be completed before the form can be submitted. Use the follow-up prompts to add detail whenever a condition, defect, or exception is identified.

2. Service Visit & Site Details

Site/facility name

Site address or location description

Facility contact person

Contact phone or email

Date of service visit

Time on site

Time off site

Type of maintenance visit

 

Reference the maintenance schedule or contract number:

 

Describe the reported fault or symptom:

 

Please describe the nature of this visit:

Work order/ticket reference

Technician(s) on site

Company/service provider

Weather conditions at the time of service

Approximate outdoor ambient dry-bulb temperature (°C)

Approximate outdoor relative humidity (%)

3. Asset Identification & Equipment Inventory

Identify each unit serviced during this visit. If multiple chillers or air handling units were worked on, list each one separately in the equipment table and reference the asset tag in the detailed sections that follow.

 

Primary chiller asset tag/equipment ID

Chiller manufacturer and model

Serial number

Chiller nominal cooling capacity (kW or tons — state units in remarks)

Year of manufacture or installation

Chiller configuration

 

How many modules are installed on this system?

 

Please describe the configuration:

Refrigerant type and charge amount

Air handling unit asset tag/equipment ID

AHU manufacturer, model and serial number

AHU design airflow (L/s or CFM — state units in remarks)

Components present in this air handling unit

Ductwork systems inspected during this visit

Equipment inventory covered by this visit

Asset tag

Equipment description

Location/roof zone

Nominal capacity

Serviced this visit?

Asset label legible?

A
B
C
D
E
F
1
RT-CH-01
Air-cooled package chiller
Roof zone A
250.00
2
RT-AHU-01
Rooftop air handling unit
Roof zone A
12000.00
3
RT-AHU-02
Rooftop air handling unit
Roof zone B
8500.00
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

4. Safety, Access & Pre-Service Checks

Complete these checks before removing panels or energising equipment. Follow the site's own isolation, permit and safe-working procedures, and the equipment manufacturer's guidance. If any item cannot be verified, record the reason and escalate to the responsible site contact.

 

Was a documented safety briefing or task risk assessment completed before work began?

 

Reference number or initials for the briefing record:

 

Please explain why the briefing was not completed and what alternative controls were used:

Was suitable access equipment (ladder, mobile platform, fall protection) available and in serviceable condition?

 

Describe the access limitation and any work deferred as a result:

Roof surface, walkways and handrails were visually checked for damage, slip hazards and obstructions

Electrical isolation was applied and verified where required, and any stored energy was released

Service panels, guards and safety screens were removed using the correct procedure and refitted at the end of the visit

Refrigerant handling equipment, recovery cylinders and leak-detection instruments were available and within their service date

Work area was kept clear of loose materials, packaging and tools that could be drawn into fans or intakes

Were any unusual hazards observed on the roof or around the equipment (for example standing water, corroded supports, wildlife, damaged screens, restricted egress)?

 

Describe each hazard observed and any immediate action taken:

Personal protective equipment used during this visit

Was any hot work, cutting, brazing or welding performed during this visit?

 

Describe the work, the permit reference and the fire-watch arrangements used:

5. Air-Cooled Chiller — Mechanical & Condenser Inspection

Inspect the chiller package with the unit isolated where safe to do so. Record observations for each circuit or module where the unit has multiple circuits.

 

Unit frame, skid, mounting rails and roof curb inspected for corrosion, distortion and secure fixings

Panels, gaskets and access covers inspected for damage, missing fasteners and weather sealing

Condenser coils inspected for dirt, debris, biological growth, fin damage and combing requirements

Condenser coil condition

 

Describe the extent of soiling and the cleaning method recommended:

 

Describe the fin damage or corrosion and the affected area:

 

Describe the leak location, refrigerant loss observed and immediate containment action:

Was coil cleaning performed during this visit?

 

Which cleaning method was used?

Condenser fans inspected for blade condition, balance, secure fixings and correct rotation

Number of condenser fans on the unit

Number of condenser fans found defective or out of service

Were condenser fan motors, bearings or hubs found to be noisy, hot or vibrating abnormally?

 

Identify the affected fan(s) and describe the symptom, including any vibration or temperature readings taken:

Fan guards, screens and bird/vermin mesh inspected and found secure

Is the chiller equipped with condenser fan speed control (variable speed drives or fan cycling)?

 

Was the fan speed control sequence tested and operating as expected?

 

Describe the observed control behaviour and any suspected fault:

Compressor(s) inspected for oil leaks, vibration, mounting, crankcase heater operation and sound level

Compressor operating hours recorded from the run-hour meter

Was compressor oil level, oil pressure differential or oil quality checked?

 

Record the oil level, pressure differential and any oil analysis results or observations:

Were any unusual noises, vibrations or elevated surface temperatures detected on the chiller?

 

Describe the location, symptom and any readings taken (vibration velocity, surface temperature, sound level):

Suction and discharge line insulation inspected for damage, moisture ingress and secure fixing

Vibration isolators, spring mounts or rubber mounts inspected for condition, settlement and free movement

Roof curb, structural supports and weather flashing inspected for corrosion, ponding and water ingress

6. Chiller — Refrigerant Circuit, Leak Checks & Water Loop

Record refrigerant and loop observations. Any suspected refrigerant release should be handled in accordance with the site's procedures and applicable local requirements; this form does not determine regulatory obligations.

 

Was a refrigerant leak check performed on the chiller?

 

Which leak-detection method was used?

 

Please explain why a leak check was not performed during this visit:

Refrigerant leak check result

 

Describe the suspected seepage location and the recommended recheck interval:

 

Describe the confirmed leak location, estimated rate of loss and the repair required:

 

Describe the repair carried out, the components replaced and the verification performed afterwards:

Was refrigerant added or recovered during this visit?

 

Record the refrigerant type, quantity added or recovered, cylinder identification and the reason:

Are filter driers, sight glasses, check valves and service valves in good condition and leak-free?

 

Identify the component(s) of concern and describe the observed condition:

Suction and discharge pressure readings recorded for each operating circuit

Subcooling and superheat values calculated and compared with expected operating conditions

Expansion device (thermal or electronic expansion valve) inspected for correct operation and sensing bulb mounting

Chilled water (or glycol) loop — fluid type and concentration

Were fluid concentration, pH, conductivity or inhibitor levels tested?

 

Record each test result and compare it with the site's or supplier's target range:

Pumps, strainers, isolation valves, balancing valves and flexible connectors inspected for leaks and condition

Flow switch, differential pressure sensor or flow meter inspected and tested for correct operation

Was adequate water or glycol flow through the evaporator confirmed?

 

Describe the flow issue, possible causes (strainer blockage, pump fault, closed valve) and actions taken:

Pipework insulation and vapour barrier inspected for damage, gaps and condensation staining

Expansion vessel, air separator, automatic air vent and make-up water arrangement inspected

7. Chiller — Electrical, Controls & Protective Devices

Electrical inspection should only be carried out by appropriately trained personnel using suitable test instruments and the site's isolation procedures. Record measured values as found.

 

Main isolator, contactors, starters and terminals inspected for tightness, arcing marks, discoloration and signs of overheating

Control panel inspected for cleanliness, moisture, dust ingress, rodent damage and secure component mounting

Wiring, cable glands, ferrules and loom condition inspected for chafing, heat damage and loose connections

Were thermal imaging or infrared temperature checks performed on electrical connections?

 

Record the highest temperature rise observed, the affected components and whether images were retained:

Were supply voltage and phase currents measured at the unit?

 

Record the measured line-to-line voltages and running currents for each phase, and note any imbalance:

Were motor insulation resistance (megohm) readings taken?

 

Record the test voltage applied and the insulation resistance for each motor tested:

Earth/bonding continuity visually inspected and, where tested, recorded

Motor protection settings, overload relays and circuit breaker ratings checked against nameplate data

Are variable frequency drives (VFDs) fitted to any chiller fans or pumps?

 

Which drive checks were completed?

Controller, setpoints and alarm history reviewed and recorded

Were any active or historical alarms present in the chiller controller?

 

List each alarm code, description, timestamp and whether it was reset, cleared or remains active:

Safety controls tested where practicable: high-pressure cut-out, low-pressure cut-out, flow switch, freeze protection and phase/voltage monitor

Did any safety control fail to operate as expected when tested?

 

Identify the control that failed, the test method used, the observed result and the action recommended:

Time clock, scheduling and optimum start/stop settings reviewed against the current operating schedule

8. Air Handling Unit — Fans, Drives & Mechanical Checks

Inspect the air handling unit with fans isolated where required. Check rotating components for condition, alignment, tension and secure mounting before restarting.

 

Fan scroll, housing and inlet cone inspected for corrosion, cracks, loose panels and air leakage

Fan impeller/wheel inspected for dust build-up, blade damage, cracks and set-screw security

Was the fan impeller cleaned during this visit?

 

Describe the cleaning method and the amount of build-up removed:

Fan bearings inspected and lubricated where applicable, using the correct lubricant and quantity

Bearing temperature after run-in (°C)

Were any bearings noisy, rough, hot or showing signs of grease purge and seal damage?

 

Identify the bearing position and recommend whether it should be monitored, re-lubricated or replaced:

Belt drive inspected: belt condition, tension, alignment, pulley wear and sheave security

Belt condition assessment

 

Record the belt size, quantity to be replaced and the recommended replacement date:

 

Record the belt size and quantity fitted, and the tension setting applied:

Variable pitch sheave or speed control setting recorded and compared with the design airflow

Fan motor inspected for dust build-up, cooling path clearance, sound, vibration and secure mounting

Vibration isolators and flexible connections at the fan discharge inspected for condition and correct loading

Were vibration measurements taken on the fan or motor?

 

Record the measured vibration values, the measurement points and the instrument used:

Access panels, hinges, handles and gaskets inspected and refitted to maintain a seal

Internal surfaces, floor pan and drain pan area inspected for corrosion, standing water and microbial growth

Was any biological growth, odour or visible contamination found inside the unit?

 

Describe the location and extent, and record any cleaning, treatment or sampling recommended:

9. Air Handling Unit — Filtration & Coils

Filters and coils have a direct effect on airflow, energy use and air quality. Record the filter specification fitted, the condition found and any replacement carried out.

 

Filter size and type currently fitted (pre-filter bank)

Filter size and type currently fitted (final filter bank)

Filter condition on arrival

Number of filters replaced during this visit

Date the current filter set was installed

Was a filter differential pressure reading taken?

 

Record the measured filter differential pressure (Pa or in. w.g. — state units in remarks):

Are filter frames, clips, gaskets and holding frames in good condition with no bypass paths?

 

Describe the bypass path or frame defect and the corrective action required:

Cooling coil face and rows inspected for dirt, lint, biological growth and fin damage

Heating coil inspected for dirt, corrosion, damage and secure header connections

Coil cleanliness assessment

 

Describe the contamination and the recommended cleaning approach and timing:

 

Describe the leak location, the fluid involved and the immediate action taken:

Was coil cleaning performed on this unit?

 

Record the method used, the chemicals applied (if any) and how residues and condensate were contained:

Coil headers, valves, strainers, air vents and flexible connections inspected for leaks

Coil frost/freeze protection devices and sensors inspected where fitted

Was the coil face velocity or coil pressure drop measured?

 

Record the measured pressure drop across each coil and compare with the design or previous values:

10. Dampers, Mixing Box & Outside Air Intake

Outside air, return air and relief dampers inspected for blade condition, seal, linkage wear and secure mounting

Were the dampers cycled through their full travel and observed for correct operation?

 

Damper operation result

 

Describe the symptom and the suspected cause:

 

Identify the damper and describe the mechanical defect:

 

Record the actuator type, the signal applied and the observed response:

 

Record the commanded position, the actual position and the feedback reading:

Damper seals and jamb seals inspected for air leakage when closed

Mixing box section inspected for air leakage, thermal bridging and internal corrosion

Outside air intake louvre, screen and bird mesh inspected for blockage, damage and water ingress

Is the outside air intake positioned where it could draw in exhaust, kitchen flue gases, cooling tower plumes or other contaminants?

 

Describe the potential contamination source, the distance to the intake and any mitigation recommended:

Was a minimum outside air or economiser sequence verified with the control system?

 

Describe the sequence tested, the setpoints observed and the result:

11. Ductwork, Duct Accessories & Air Distribution

Inspect accessible ductwork for integrity, insulation, support and cleanliness. Where ducts are concealed or inaccessible, note the limitation rather than assuming condition.

 

Main supply ductwork inspected for physical damage, sagging, open joints and displaced sections

Duct joints, seams, flanges and gaskets inspected for air leakage

Was any significant air leakage observed at duct joints or penetrations?

 

Describe the location, approximate size of the leak and the recommended repair (sealant, tape, gasket or section replacement):

External duct insulation and vapour barrier inspected for tears, water damage, missing sections and exposed metal

Duct supports, hangers, straps and roof-mounted frames inspected for corrosion, looseness and settlement

Internal duct surfaces (where accessible) inspected for dust build-up, debris, moisture and microbial growth

Is duct cleaning recommended based on this inspection?

 

How urgent is the recommended duct cleaning?

Fire, smoke and combination dampers inspected for access, labelling, linkage condition and current inspection status

Were any fire or smoke dampers tested during this visit?

 

Record the damper reference, the test performed, the result and any follow-up required:

Volume dampers, turning vanes and balancing devices inspected for position, security and tamper evidence

Duct-mounted attenuators/silencers inspected for liner condition, debris and secure mounting

Access panels and test ports inspected for sealing, labelling and availability for future testing

Diffusers, grilles and registers inspected for cleanliness, security, direction setting and obstruction

Were any diffusers, grilles or terminal boxes reported as noisy, dumping air or causing discomfort?

 

Identify the locations reported and describe the symptom and any adjustment made or recommended:

Was air-side performance measured (supply, return, outside airflow or static pressure)?

 

Record the measured values, the instrument used and the measurement locations:

12. Airflow, Ventilation & Indoor Air Quality Observations

Record general air quality and ventilation observations. These notes are descriptive only and do not constitute an assessment of health, safety or regulatory compliance.

 

Supply air temperature measured at the unit discharge (°C)

Return air temperature measured at the unit (°C)

Outside air temperature measured at the intake (°C)

Indoor relative humidity measured in a representative occupied space (%)

Carbon dioxide reading in a representative occupied space (ppm), if measured

Air quality or comfort issues reported or observed

 

Describe the affected areas and the suspected contributing factors:

 

Describe where the odour was noticed, when it occurs and any suspected source:

 

List the rooms or zones affected and the temperatures reported:

 

List the rooms or zones affected and the temperatures reported:

 

Describe the noise type (rumble, whistle, rattle), the location and the time it occurs:

Were any comfort or air quality complaints logged by occupants in the period since the last service?

 

Summarise the complaints, the areas affected and any correlation with system operation or schedule:

Please rate the following air-side observations as found during this visit

Strongly disagree

Disagree

Neutral

Agree

Strongly agree

Not assessed

Overall airflow delivery appears consistent with expectations

Ventilation/outside air delivery appears adequate for the spaces served

Air distribution is free from noticeable drafts or hot/cold spots

Odour and dust levels appear acceptable in the areas inspected

Noise from the air distribution system appears acceptable

13. Condensate Drainage & Moisture Control

Condensate drain pan inspected for corrosion, cracks, standing water and secure fit

Drain lines inspected for blockages, sagging, disconnection, algae growth and correct fall

Was the condensate drain flushed or cleared during this visit?

 

Which method was used to clear the drain?

Is a condensate trap or water seal fitted and correctly sized?

 

Describe the current arrangement and any risk of air bypass, odour or poor drainage:

Drain pan treatment tablets, UV device or other anti-microbial measure inspected or replenished

Was any evidence of past or present water leakage found in or around the unit?

 

Describe the location of the staining or leakage, the suspected source and any damage to finishes or insulation:

Roof penetrations and flashing around the unit inspected for water ingress

14. Controls, Sensors & Building Management Interface

Verify that sensors read plausibly and that control sequences respond as expected. Note any setpoint changes made and the reason for each change.

 

Control and monitoring points checked during this visit

Were sensor readings compared against a calibrated reference instrument?

 

List each sensor, the reference reading, the sensor reading and the deviation observed:

Were any sensors found to be out of calibration, drifting, poorly positioned or damaged?

 

Identify each sensor, describe the fault and state whether it was adjusted, repositioned or requires replacement:

Control sequences reviewed: staging of compressors, fan speed control, economiser logic and setpoint reset strategies

Were any control setpoints changed during this visit?

 

List each setpoint changed, the previous value, the new value and the reason for the change:

Does the system communicate with a central building management or supervisory system?

 

Which communication checks were completed?

Are any points currently offline, overridden or manually forced?

 

List each point left in override or manual mode, the reason and the plan to return it to automatic control:

Thermostats, room controllers and user interfaces inspected for damage, correct mode settings and accessible location

Controller backup, password access and parameter record updated where applicable

15. Performance Readings & Trend Data

Enter the readings taken during the visit. Values should be measured under stable operating conditions where possible. The calculated columns update automatically from the values entered.

 

Reference relationship for sensible cooling capacity (imperial units, approximate)

Qsensible=1.08×V˙air×ΔTQ_{sensible} = 1.08 \times \dot{V}_{air} \times \Delta T

 

Compressor and refrigerant circuit readings

Circuit/compressor ID

Suction pressure

Discharge pressure

Measured current (A)

Nameplate rated current (A)

Percent of rated load

Within expected range?

A
B
C
D
E
F
G
1
Circuit 1 / Comp A
118.2
392.5
42.6
48.0
88.8
2
Circuit 1 / Comp B
117.8
390.1
41.9
48.0
87.3
3
Circuit 2 / Comp A
119.4
395.0
43.2
48.0
90.0
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Air handling unit operating readings

Reading location

Dry-bulb temperature (°C)

Relative humidity (%)

Static pressure

Fan speed (%)

Motor current (A)

A
B
C
D
E
F
1
Outside air intake
29.4
52.0
0.00
0.0
0.0
2
Mixed air
22.1
48.0
-0.15
0.0
0.0
3
Supply air discharge
13.8
55.0
0.82
72.0
18.4
4
Return air
23.6
46.0
-0.12
72.0
17.9
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Water/glycol loop readings

Measurement point

Temperature (°C)

Pressure

Flow rate

Temperature difference (K)

A
B
C
D
E
1
Chilled water supply
6.8
2.40
12.50
6.8
2
Chilled water return
12.1
1.90
12.50
12.1
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Filter change-out record

Filter bank/position

Filter size and specification

Quantity

Unit cost

Line total

Fitted and sealed?

A
B
C
D
E
F
1
Pre-filter bank A
592 x 592 mm pleated panel
6
$18.00
$108.00
2
Final filter bank A
592 x 592 mm rigid pocket
6
$42.00
$252.00
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

16. Lubrication, Consumables & Parts Used

Lubrication schedule reviewed and lubrication points serviced as required

Lubricant type(s) used

Were any parts, components or consumables replaced during this visit?

 

Parts and materials used

Part/material description

Part number or reference

Quantity

Unit cost

Line total

Old part retained?

A
B
C
D
E
F
1
Fan drive belt set
B-52
2
$24.00
$48.00
2
Filter panel
592x592-G4
6
$18.00
$108.00
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Total parts and materials cost for this visit

Total labour hours on site

Number of technicians on site

Total technician-hours

17. Deficiencies, Corrective Actions & Follow-Up

List every defect, exception or recommendation identified during the visit, including items that were corrected on the spot and items that require a return visit or quotation.

 

Deficiency and corrective action register

Asset/location

Description of deficiency or observation

Severity (1 = low, 5 = critical)

Corrected on site?

Action taken or recommended

Target completion date

A
B
C
D
E
F
1
RT-CH-01 condenser
Light debris build-up on lower coil rows
Coil cleaned by low-pressure rinse; recheck next visit
4/17/2026
2
RT-AHU-02 supply fan
Bearing noise on drive end; belt glazed
Replace bearing and belt set; quote to be submitted
3/31/2026
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Categories of work recommended for follow-up

Overall urgency of the recommended follow-up work

 

Describe the critical issue, the risk if left unaddressed and any interim measures recommended:

Is a quotation or additional approval required before the recommended work can proceed?

 

Summarise the scope requiring quotation or approval and the estimated timeframe:

Was any equipment left isolated, shut down or in a restricted operating mode at the end of the visit?

 

Identify the equipment, the reason, the current state and who was notified:

18. System Condition Assessment & Technician Observations

General observations, operating notes and any context the next technician should be aware of:

Please rate the condition of each system area (1 = poor, 5 = excellent)

Chiller mechanical condition

Chiller electrical and controls condition

Air handling unit mechanical condition

Filtration and coil condition

Ductwork integrity and cleanliness

Condensate and moisture management

Controls, sensors and monitoring

General roof-mounted installation condition

Overall system condition as observed during this visit

Overall system status at the end of the visit

 

Describe the reduced capacity or redundancy and the impact on the building:

 

Describe the fault preventing operation and the estimated time to restore service:

Were photographs taken to document the condition of the equipment?

 

Please upload or attach the supporting photographs

Choose a file or drop it here

Upload supporting documents (for example test results, trend exports, thermal images or manufacturer data sheets)

Choose a file or drop it here
 

19. Maintenance Schedule & Next Service Planning

Recommended date for the next preventive maintenance visit

Recommended service frequency going forward

 

Describe the recommended interval and the reason for it:

Suggested focus areas for the next visit

Would the site benefit from spare parts being held on site (for example belts, filters, sensors)?

 

List the recommended spare parts and suggested quantities:

Maintenance records, logbook or asset history updated with this visit

20. Completion, Acknowledgement & Sign-Off

By signing below, the parties confirm that the recorded work and observations reflect the visit as carried out. Signing does not constitute a warranty, certification or guarantee of future performance. Any items requiring further investigation are listed in the deficiency register above.

 

Was the site representative briefed on the findings and recommended actions?

 

Name of the person briefed and how the briefing was delivered:

All access panels, guards, isolators and safety devices have been restored to their normal operating condition

Work area has been left clean and free of debris, packaging and used consumables

Waste materials, used filters and recovered refrigerant have been handled and removed in accordance with site arrangements and local requirements

Technician name

Technician qualification, licence or certification reference (if applicable)

Technician signature

Date signed by technician

Site representative/client name

Site representative signature (acknowledgement of the visit and findings)

Date signed by site representative

Additional comments, access arrangements for next visit, or questions raised by the client:

Report reference or document version

Analysis for Commercial Rooftop HVAC Chiller, Air Handling Unit & Ductwork Maintenance Form

Important Note:

This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes.

AI-Generated Content: This template and its accompanying guidance are AI-generated to provide a practical starting point for your form-building needs. Please review and customise the content to ensure it is accurate, appropriate and suitable for your intended use.

This guide is provided for general informational and planning purposes only. It does not constitute professional, legal, financial, medical, employment, privacy, regulatory, or advice of any other kind, nor does it certify that this template is suitable or compliant for any particular jurisdiction or purpose.

Laws, regulations, industry practices and business requirements vary. You are responsible for reviewing and customising the template to suit your intended use and obtaining advice from appropriately qualified professionals where necessary.

Please delete this section before publishing your form. See our Terms of Service for further information.


 

Overall Form Analysis

This Commercial Rooftop HVAC Chiller, Air Handling Unit & Ductwork Maintenance Form is a comprehensive preventive maintenance (PM) checklist designed to document service visits across three major rooftop HVAC subsystems: air-cooled package or modular chillers, air handling units (AHUs), and distribution ductwork. The form is logically organised into seventeen distinct sections that follow a natural service workflow — from site identification and safety checks, through detailed mechanical, electrical, refrigerant, filtration, ductwork and controls inspections, to performance readings, deficiency tracking, and sign-off. This progressive structure mirrors how a technician would actually conduct a service visit, which supports both completeness and ease of use in the field.

 

Key Strengths

  • Logical workflow alignment: The form follows a real-world service sequence — arrival and safety first, then equipment-specific inspections, then readings and follow-up — which reduces cognitive load and helps ensure no critical step is overlooked.

  • Rich conditional logic: Many questions include follow-up prompts triggered by specific answers (e.g., leak findings prompt for location and repair details, damper faults prompt for actuator diagnostics). This captures actionable detail only when relevant, avoiding unnecessary form length.

  • Structured data tables: The performance readings section uses tabular formats with calculated columns (e.g., percent of rated load computed from measured vs. nameplate current) and the filter change-out record includes cost calculations. These support consistent data entry and reduce manual arithmetic errors.

  • Balanced scope: The form covers mechanical, electrical, refrigerant, air-side, water-side, controls, and building interface aspects without becoming unmanageably long, thanks to the use of checkboxes for routine inspections and open-ended fields reserved for exceptions.

  • Clear instructional framing: The purpose and scope section sets expectations — record actual observed values, note reasons for missing readings, and acknowledge that the form is a record-keeping tool rather than a substitute for manufacturer documentation or professional advice.

 

Section-by-Section Insights

Purpose, Scope & Instructions

The opening paragraphs establish the form's role as a documentation tool and set expectations for data quality (record actual values, not assumed ones). The disclaimer that this template is for general information and record-keeping convenience is appropriate and proportionate, helping set user expectations without overstating the form's authority.

 

Service Visit & Site Details

Questions such as Site/facility name, Facility contact person, Date of service visit, and Type of maintenance visit establish the essential context for the service record. The Type of maintenance visit question uses a well-designed single-choice list with conditional follow-ups — for example, selecting a corrective call-out prompts for the reported fault description, while selecting a scheduled PM prompts for a contract reference. This is an effective way to gather context-specific information without burdening all respondents with irrelevant fields. The inclusion of Weather conditions at the time of service and ambient temperature/humidity fields provides useful environmental context, particularly for interpreting chiller performance readings later in the form.

 

Asset Identification & Equipment Inventory

The Primary chiller asset tag/equipment ID and Air handling unit asset tag/equipment ID questions anchor the service record to specific assets, which is fundamental for asset history tracking and trend analysis over time. The equipment inventory table with sample rows demonstrates the expected format and includes a useful Serviced this visit? column to clarify scope. The Components present in this air handling unit and Ductwork systems inspected during this visit multiple-choice questions allow the technician to tailor the record to the actual equipment configuration, which is practical given the variability of AHU builds.

 

Safety, Access & Pre-Service Checks

This section is well-positioned before any equipment-specific inspections. Questions like Was a documented safety briefing or task risk assessment completed before work began? and Was suitable access equipment available and in serviceable condition? prompt the technician to confirm pre-work safety steps. The yes/no format with follow-ups (e.g., explaining why a briefing was not completed) captures exceptions without overburdening the routine case. The checklist items for isolation, panel handling, refrigerant equipment readiness, and work area housekeeping cover common pre-service considerations in a concise format. The question about unusual hazards on the roof is a practical addition that helps build a site hazard record over successive visits.

 

Air-Cooled Chiller — Mechanical & Condenser Inspection

This section provides thorough coverage of the chiller package. The Condenser coil condition question uses a graded single-choice scale (clean through to leaking) with targeted follow-ups for each adverse condition — a strong design that captures severity and actionable detail efficiently. The questions on condenser fan counts (total vs. defective) allow quick quantitative assessment. The fan speed control question with nested conditional logic (testing the sequence if the unit has variable speed control) demonstrates thoughtful form design that adapts to equipment configuration.

 

Chiller — Refrigerant Circuit, Leak Checks & Water Loop

The Was a refrigerant leak check performed on the chiller? question is appropriately mandatory, as leak checking is a routine element of chiller PM visits. The follow-up captures the method used and, if no check was performed, the reason — supporting transparency in the record. The refrigerant leak check result question with its graded options and targeted follow-ups (suspected seepage, confirmed leak, repaired leak) is effective for capturing the nuance of leak findings. The water/glycol loop section covers fluid type, chemistry testing, flow verification, and component inspection, providing good coverage of the secondary side.

 

Chiller — Electrical, Controls & Protective Devices

The Were supply voltage and phase currents measured at the unit? question captures essential electrical baseline data. The safety control testing question (Did any safety control fail to operate as expected when tested?) is appropriately mandatory — a failed safety control is a significant finding that must be recorded. The section covers thermal imaging, insulation resistance, VFD checks, alarm history, and scheduling review, providing good breadth for electrical and controls assessment.

 

Air Handling Unit — Fans, Drives & Mechanical Checks

This section covers fan housing, impeller, bearings, belt drives, motor condition, vibration, and internal surfaces. The Belt condition assessment question with its graded options and conditional follow-ups (replacement details, tension settings) is practical and well-structured. The inclusion of bearing temperature as a numeric field and the biological growth/contamination question add useful quantitative and qualitative dimensions to the inspection.

 

Air Handling Unit — Filtration & Coils

The Filter condition on arrival question uses a graded scale that captures the full range of filter states from clean to bypassing/damaged, with practical implications for each. The filter differential pressure question and the filter change-out record table (with cost calculations) support both technical assessment and cost tracking. Coil inspection covers both cooling and heating coils with a separate cleanliness assessment and targeted follow-ups.

 

Dampers, Mixing Box & Outside Air Intake

The Were the dampers cycled through their full travel and observed for correct operation? question is appropriately mandatory, as damper operation directly affects ventilation and energy performance. The damper operation result follow-up options are well-designed, covering smooth operation through to actuator failure and position feedback mismatch. The outside air intake contamination question is a practical addition that helps identify potential indoor air quality risks.

 

Ductwork, Duct Accessories & Air Distribution

This section provides good coverage of duct integrity, insulation, supports, cleanliness, fire/smoke dampers, and terminal devices. The duct cleaning recommendation question with its urgency scale (routine through to immediate) is a practical way to prioritise follow-up work. The section appropriately notes that inaccessible ductwork should be recorded as a limitation rather than assumed to be in good condition.

 

Airflow, Ventilation & Indoor Air Quality Observations

The temperature and humidity measurement fields (supply, return, outside air, indoor) provide quantitative baseline data. The air quality/comfort issues question with targeted follow-ups for specific complaints (odour, drafts, noise) is effective. The matrix rating question for air-side observations (airflow consistency, ventilation adequacy, drafts, odour/dust, noise) provides a structured qualitative assessment with a 'Not assessed' option — a thoughtful inclusion that avoids forcing ratings where observations were not made.

 

Condensate Drainage & Moisture Control

The Was the condensate drain flushed or cleared during this visit? question is appropriately mandatory, as drain maintenance is a routine and important PM task. The section covers drain pan condition, line inspection, trap/seal verification, anti-microbial measures, and water leak evidence — a thorough approach to moisture management.

 

Controls, Sensors & Building Management Interface

This section covers sensor verification, calibration comparison, control sequence review, setpoint changes, building management system (BMS) communication checks, and override tracking. The question about points left in override or manual mode is particularly practical, as forgotten overrides are a common source of operational issues. The setpoint change log (previous value, new value, reason) supports good change management practice.

 

Performance Readings & Trend Data

The tabular format for compressor readings, AHU operating readings, water loop readings, and filter change-out records is a strong design choice. The calculated column for percent of rated load (measured current/nameplate current) and the cost calculations in the filter and parts tables reduce manual computation. The reference equation for sensible cooling capacity provides a useful technical reference. Sample rows demonstrate expected data entry format clearly.

 

Lubrication, Consumables & Parts Used

This section captures lubrication activity, parts and materials used (with cost tracking), labour hours, and technician-hours. The conditional parts table (triggered by whether parts were replaced) keeps the form concise for routine visits where no parts are needed. The calculated line totals and the total technician-hours field support cost and effort tracking.

 

Deficiencies, Corrective Actions & Follow-Up

The deficiency register table is well-structured with asset/location, description, severity rating (1–5), on-site correction status, action taken/recommended, and target completion date. This is a practical format for tracking outstanding work. The Overall urgency of the recommended follow-up work question with its graded scale and critical-issue follow-up is an effective way to communicate priority. The question about equipment left isolated or in restricted mode at end of visit is an important operational safety record.

 

System Condition Assessment & Technician Observations

The general observations field, the matrix digit rating across eight system areas, the overall star rating, and the Overall system status at the end of the visit question provide a layered assessment — from detailed area ratings to a single overall status. The photograph and file upload options support visual documentation, which is valuable for trend comparison and remote review.

 

Maintenance Schedule & Next Service Planning

The Recommended date for the next preventive maintenance visit question ensures continuity of the maintenance programme. The service frequency recommendation and suggested focus areas for the next visit help build a forward-looking maintenance plan. The spare parts recommendation question is a practical addition for operational readiness.

 

Completion, Acknowledgement & Sign-Off

The sign-off section includes technician and site representative signatures, dates, and a briefing confirmation. The disclaimer that signing does not constitute a warranty or certification is appropriate and proportionate. The final checkboxes for restoring panels/guards, cleaning the work area, and handling waste materials reinforce good housekeeping practice at the close of the visit.

 

Overall Summary

This form is a well-designed, comprehensive preventive maintenance checklist that balances thoroughness with usability. Its strengths include logical workflow alignment, effective use of conditional follow-ups to capture detail only when relevant, structured data tables with calculated fields, and a clear distinction between routine checklist items (checkboxes) and exception reporting (open-ended fields). The form covers the full scope of a commercial rooftop HVAC PM visit — from safety and access through mechanical, electrical, refrigerant, air-side, water-side, controls, and ductwork inspections — while maintaining a manageable length through smart use of conditional logic. Areas for potential refinement include: ensuring that the number of mandatory fields does not create excessive friction for straightforward visits (currently 23 mandatory fields spread across the form); considering whether some numeric fields (e.g., bearing temperature, compressor hours) could benefit from optional ranges or expected values to guide data entry; and exploring whether the matrix rating questions could include brief descriptors for each scale point to improve consistency across different technicians. Overall, the form represents a professional and practical approach to HVAC maintenance documentation that should support reliable record-keeping, trend analysis, and follow-up action tracking.

 

Mandatory Question Analysis for Commercial Rooftop HVAC Chiller, Air Handling Unit & Ductwork Maintenance Form

Important Note:

This section explains why certain fields in this form are marked as required and provides general guidance on how these requirements may support the collection of complete, accurate and relevant information.

Required fields and information-collection obligations may vary depending on your industry, jurisdiction, business operations and intended use of the form. A field marked as required in this template does not necessarily mean that collecting the information is legally mandatory.

Please review each required field to determine whether it is necessary, appropriate and lawful for your particular purpose. Consider applicable privacy, data protection, consent and industry-specific requirements, and consult an appropriately qualified legal, privacy or compliance professional where necessary.

Please delete this section before publishing your form. See our Terms of Service for further information.

 

Mandatory Question Analysis

Each mandatory question identified in the form is analysed below with a context-specific explanation of how requiring the field supports data completeness, operational processing, or record-keeping within the scope of this HVAC maintenance form.

 

Site/facility name
Recommendation: Requiring this field ensures every service record is unambiguously associated with a specific site, which is foundational for organising maintenance history, scheduling future visits, and retrieving records. Without this anchor, downstream record-keeping and reporting would be significantly more difficult. The form creator should confirm whether a standardised site naming convention is in place to support consistent data retrieval.

 

Facility contact person
Recommendation: Capturing a named facility contact supports follow-up communication, briefing of findings, and coordination of access or corrective work. Requiring this field helps ensure that a point of contact is always identified on the record, reducing the risk of orphaned service reports. The necessity of this field depends on the form creator's communication workflow — some organisations may prefer to link contacts via a separate site database rather than capturing them on each visit record.

 

Date of service visit
Recommendation: The service date is a core record-keeping element that anchors the maintenance entry in time, supports scheduling of the next visit, and enables chronological trend analysis. Requiring this field prevents incomplete or undated records that would be difficult to use for maintenance planning or asset history tracking.

 

Type of maintenance visit
Recommendation: Classifying the visit type (scheduled PM, corrective call-out, post-repair verification, etc.) supports operational reporting, contract management, and prioritisation of follow-up work. The conditional follow-ups triggered by each option capture relevant context (e.g., fault description for breakdown visits). Requiring this field ensures every record is categorised, which is useful for analysing maintenance workload and response patterns. The specific categories should align with the form creator's service delivery model.

 

Technician(s) on site
Recommendation: Recording the technicians present supports accountability, skills tracking, and follow-up queries about the visit. Requiring this field ensures that every service record identifies the personnel involved, which is practical for quality assurance and internal record-keeping purposes.

 

Primary chiller asset tag/equipment ID
Recommendation: The asset tag links the service record to a specific piece of equipment, enabling asset-level maintenance history tracking and trend analysis. Requiring this field prevents records that cannot be reliably associated with an equipment asset, which would undermine the value of the maintenance log. The form creator should ensure that a consistent asset tagging system is in use across the portfolio.

 

Air handling unit asset tag/equipment ID
Recommendation: Similar to the chiller asset tag, this field anchors the AHU-related observations to a specific unit. Given that the form covers multiple subsystems, requiring both asset tags ensures that each major equipment type serviced is clearly identified on the record.

 

Was a documented safety briefing or task risk assessment completed before work began?
Recommendation: Requiring this question supports the documentation of pre-work safety steps taken during the visit. The yes/no format with follow-ups (reference number if completed, explanation if not) captures both the routine case and exceptions transparently. The specific safety procedures and documentation requirements may vary by site and jurisdiction; this field serves as a practical record of what was done rather than a compliance determination.

 

Was suitable access equipment (ladder, mobile platform, fall protection) available and in serviceable condition?
Recommendation: Requiring this question helps record whether safe access was available and whether any work was deferred due to access limitations. This supports both operational transparency and planning for return visits where access issues need to be resolved. The specific access requirements depend on the site layout and the tasks performed.

 

Condenser coil condition
Recommendation: The condenser coil is a critical component affecting chiller efficiency and capacity. Requiring a condition assessment ensures that this key inspection point is always evaluated and recorded, supporting trend tracking of coil cleanliness and condition over successive visits. The graded options and conditional follow-ups capture severity and recommended action efficiently.

 

Was a refrigerant leak check performed on the chiller?
Recommendation: Refrigerant leak checking is a routine element of chiller maintenance visits. Requiring this question ensures that the leak check status is always recorded — whether performed or not — with the follow-up capturing the method used or the reason for omission. This supports transparent record-keeping and helps identify patterns of missed checks. Specific leak check requirements may vary by equipment type and local context.

 

Were supply voltage and phase currents measured at the unit?
Recommendation: Electrical measurements provide a baseline for monitoring motor and compressor health over time. Requiring this question ensures that the measurement status is always recorded, with the follow-up capturing actual values or the reason for omission. This supports trend analysis and early identification of electrical issues.

 

Did any safety control fail to operate as expected when tested?
Recommendation: Recording identified safety control failures helps document operational concerns, support corrective action planning and communicate relevant findings to responsible personnel. Requiring this question ensures that the safety control test result is explicitly recorded — whether all controls passed or one or more failed. The follow-up captures the details of any failure for follow-up action. This supports both operational safety documentation and maintenance planning.

 

Filter condition on arrival
Recommendation: Filter condition directly affects airflow, energy use, and indoor air quality. Requiring this assessment ensures that filter state is always evaluated and recorded, supporting change-out scheduling and trend tracking. The graded options capture the full range of filter conditions efficiently.

 

Were the dampers cycled through their full travel and observed for correct operation?
Recommendation: Damper operation affects ventilation rates, energy performance, and indoor air quality. Requiring this question ensures that damper testing status is always recorded, with the follow-up capturing the operation result and any faults identified. This supports both operational transparency and prioritisation of damper-related repairs.

 

Was the condensate drain flushed or cleared during this visit?
Recommendation: Recording condensate drainage inspection and maintenance activities helps identify potential blockages, water management issues and maintenance follow-up requirements. Requiring this question ensures that drain maintenance status is always recorded, supporting continuity of the maintenance programme and identification of recurring drainage issues.

 

Overall urgency of the recommended follow-up work
Recommendation: Classifying the urgency of recommended follow-up work supports prioritisation and scheduling of corrective actions. Requiring this field ensures that every visit record includes a clear urgency assessment, which is useful for maintenance planning and communicating priorities to the site contact. The critical-issue follow-up captures additional detail for the most urgent findings.

 

Was any equipment left isolated, shut down or in a restricted operating mode at the end of the visit?
Recommendation: Recording equipment left in a non-normal operating state is important for operational continuity and safety. Requiring this question ensures that any such state is always explicitly captured, with the follow-up identifying the equipment, reason, and notification. This supports clear communication between the service team and the site.

 

Overall system status at the end of the visit
Recommendation: The overall system status provides a concise summary of the equipment condition at the close of the visit, which is useful for quick reference and escalation decisions. Requiring this field ensures that every record includes a clear status assessment. The conditional follow-ups for reduced capacity or non-operational states capture the necessary detail for planning.

 

Recommended date for the next preventive maintenance visit
Recommendation: Scheduling the next visit supports continuity of the maintenance programme and helps prevent gaps in preventive maintenance coverage. Requiring this field ensures that every visit record includes a forward-looking scheduling recommendation.

 

Was the site representative briefed on the findings and recommended actions?
Recommendation: Documenting that findings were communicated to the site representative supports clear handover and reduces the risk of important findings being overlooked. Requiring this question ensures that the briefing status is always recorded, with the follow-up capturing who was briefed and how. The specific briefing process may vary by site arrangement.

 

Technician name
Recommendation: Recording the technician's name supports accountability and provides a clear point of contact for any follow-up queries about the visit. Requiring this field ensures that every completed record identifies the person responsible for the work documented.

 

Date signed by technician
Recommendation: The sign-off date records when the technician formally completed the report, which supports document version control and chronological record-keeping. Requiring this field ensures that every record includes a clear completion timestamp.

 

Overall Mandatory Field Strategy

The form currently designates 23 fields as mandatory, distributed across the service visit details, asset identification, safety checks, equipment-specific inspections, follow-up planning, and sign-off sections. This is a substantial number, reflecting the form's comprehensive scope and the operational importance of capturing key data points for each subsystem. However, the distribution is generally well-balanced — mandatory fields are concentrated at natural decision points and critical inspection results, while the majority of detailed inspection items are optional checkboxes or conditional follow-ups.

 

Balancing data collection depth against completion rates: Given the form's length and technical nature, it is worth periodically reviewing whether all 23 mandatory fields are essential for every visit type. For example, a quick corrective call-out visit may not require the same depth of data as a full scheduled PM. Consider whether some mandatory fields could be made conditional on the visit type (e.g., the condenser coil condition assessment might be optional for a visit focused solely on ductwork).

 

Conditional logic for detailed information: The form already uses conditional follow-ups effectively — triggered by specific answers to capture detail only when relevant. This approach could be extended further. For example, the Were supply voltage and phase currents measured at the unit? question could be made conditional on whether electrical work was part of the visit scope, rather than mandatory for every visit.

 

Best practices for mandatory field selection: Mandatory fields are most effective when they capture information that is essential for every record — site identity, date, asset identification, safety status, and overall system status. Fields that capture subsystem-specific findings (e.g., condenser coil condition, filter condition) are important but may not be relevant for every visit scope. A tiered approach — where core identity and safety fields are always mandatory, and subsystem-specific fields are mandatory only when that subsystem is within scope — could improve completion efficiency without sacrificing data quality.

 

Placement observations: The mandatory fields are reasonably well-distributed across the form, with clusters at the beginning (site and visit details), middle (key inspection results), and end (follow-up and sign-off). This distribution helps maintain respondent engagement throughout the form. However, the density of mandatory fields in the safety and chiller inspection sections (5 mandatory fields in close proximity) could create a perception of high burden; ensuring that the conditional follow-ups are clearly presented as optional detail-gathering (rather than additional requirements) may help mitigate this.

 

Overall, the mandatory field strategy is reasonable for a comprehensive PM form of this scope. The key recommendation is to periodically review the mandatory set in light of actual usage patterns, visit types, and technician feedback to ensure that the required fields remain proportionate to the operational value they provide.

 