Submit Your Comprehensive Energy Efficiency Upgrade Proposal

1. Section 1: Property Identifier & Facility Baseline Metrics

Provide comprehensive baseline information about the facility to establish accurate measurement and verification protocols for the proposed energy efficiency upgrade.

 

Property Name/Asset ID

Complete Facility Address

Primary Building Type

Building Age (years)

Total Gross Floor Area (square meters)

Net Occupiable Area (square meters)

Current Occupancy Rate (%)

Primary Facility Operating Hours

Does this facility operate 24/7 in any areas?

 

Specify 24/7 operational zones and critical systems:

 

Current Energy Systems Baseline - Provide details about existing equipment to be replaced or modified

 

Existing Lighting Systems (select all that apply)

Existing HVAC Systems (select all that apply)

Existing Renewable Energy Systems

Historical Energy Consumption & Cost Baseline (Last 24 Months)

Billing Period End Date

Electricity Consumption (kWh)

Electricity Cost

Natural Gas Consumption (kWh equivalent)

Natural Gas Cost

Total Energy Cost

A
B
C
D
E
F
1
1/31/2024
85000
$12,750.00
25000
$1,250.00
$14,000.00
2
2/29/2024
78000
$11,700.00
28000
$1,400.00
$13,100.00
3
 
 
 
 
 
$0.00
4
 
 
 
 
 
$0.00
5
 
 
 
 
 
$0.00
6
 
 
 
 
 
$0.00
7
 
 
 
 
 
$0.00
8
 
 
 
 
 
$0.00
9
 
 
 
 
 
$0.00
10
 
 
 
 
 
$0.00

Primary Utility Provider Contact Information & Rate Structure Details

Upload Facility Floor Plans & Single-Line Electrical Diagrams

Choose a file or drop it here

Upload Photographs of Existing Equipment to be Replaced (minimum 5 images)

Choose a file or drop it here

2. Section 2: Proposed Retrofit Scope & Equipment Specifications

Detail the complete technical scope of the proposed energy efficiency upgrade, including equipment specifications, installation requirements, and integration with existing building systems.

 

Proposed Retrofit Type (select all that apply)

 

Total Number of LED Fixtures to be Installed

 

Describe Smart Controls Platform & Integration Protocol

 

Specify New HVAC Equipment Models & Efficiency Ratings

 

Proposed Solar PV System Capacity (kWp)

Detailed Equipment Specification & Cost Schedule

Equipment Description

Manufacturer & Model

Quantity

Unit Cost

Total Equipment Cost

Expected Lifespan (years)

Warranty Period (years)

A
B
C
D
E
F
G
1
LED Panel 2x4ft
Acme Lighting AL-2000
200
$85.00
$17,000.00
15
7
2
Smart Thermostat
TechControls TC-5000
50
$250.00
$12,500.00
10
5
3
 
 
 
 
$0.00
 
 
4
 
 
 
 
$0.00
 
 
5
 
 
 
 
$0.00
 
 
6
 
 
 
 
$0.00
 
 
7
 
 
 
 
$0.00
 
 
8
 
 
 
 
$0.00
 
 
9
 
 
 
 
$0.00
 
 
10
 
 
 
 
$0.00
 
 

Detailed Scope of Work & Installation Methodology

Will this project require building automation system integration?

 

Describe BAS Integration Requirements, Protocols, and Cybersecurity Measures

Primary Equipment Vendor/Contractor Company Name

Vendor Experience Rating (1-5 scale, where 5 is extensive relevant experience)

Upload Equipment Cut Sheets & Technical Specifications (PDF format)

Choose a file or drop it here
 

Upload Vendor Quotes & Proposals (consolidated PDF)

Choose a file or drop it here
 

Upload Proposed Equipment Layout & Installation Diagrams

Choose a file or drop it here

Are there any known site constraints or accessibility challenges?

 

Describe constraints: roof load limits, ceiling height restrictions, electrical panel capacity, structural limitations, etc.

3. Section 3: Projected Energy Savings & ROI Analysis

Provide comprehensive financial analysis demonstrating project viability through energy savings, cost reductions, and return on investment metrics. Include detailed calculations and conservative estimates.

 

Total Project Cost (Equipment + Installation + Soft Costs)

Detailed Cost Breakdown & Financial Analysis

Cost Category

Amount

Funding Source

Annual Savings Generated

Payback Period (years)

A
B
C
D
E
1
Equipment Purchase
$250,000.00
Capital Budget
$0.00
0
2
Installation Labor
$120,000.00
Capital Budget
$0.00
0
3
Engineering & Design
$30,000.00
Operational Budget
$0.00
0
4
Commissioning
$15,000.00
Operational Budget
$0.00
0
5
Contingency (10%)
$35,000.00
Capital Budget
$0.00
0
6
 
 
 
$0.00
0
7
 
 
 
$0.00
0
8
 
 
 
$0.00
0
9
 
 
 
$0.00
0
10
 
 
 
$0.00
0

Projected Annual Electricity Savings (kWh)

Projected Annual Cost Savings

Simple Payback Period (years)

Internal Rate of Return (IRR) %

Net Present Value (NPV) - 10 Year Horizon

Have you conducted a measurement & verification (M&V) plan compliant with IPMVP?

 

Upload M&V Plan Document

Choose a file or drop it here
 
 

Describe your proposed M&V approach and methodology

Projected Annual CO2 Emissions Reduction (metric tonnes)

Sensitivity Analysis - Rate impact of variable changes on project viability

Very High Risk

High Risk

Moderate Risk

Low Risk

Very Low Risk

Energy Price Escalation Rate (+2%)

Equipment Performance Degradation

Extended Installation Timeline

Reduced Occupancy Rates

Are utility rebates or incentive programs applicable?

 

Utility Incentive Schedule

Incentive Program Name

Expected Rebate Amount

Application Deadline

Rebate Status

A
B
C
D
1
LED Lighting Rebate
$25,000.00
6/30/2024
Applied
2
 
 
 
 
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Describe any alternative scenarios or options considered (e.g., smaller system, phased approach)

4. Section 4: Work Schedule & Operational Disruption Plan

Outline comprehensive project execution timeline, installation phases, and strategies to minimize operational disruption to facility occupants and critical business functions.

 

Preferred Project Start Date

Expected Project Completion Date

Total Project Duration (working days)

Detailed Project Phasing & Milestone Schedule

Phase Name

Start Date

End Date

Key Activities & Deliverables

Requires After-Hours Work?

Affected Building Zones

A
B
C
D
E
F
1
Pre-Construction & Mobilization
7/1/2024
7/5/2024
Site setup, safety planning, material delivery
 
Loading dock, storage areas
2
Zone 1 LED Installation
7/8/2024
7/19/2024
Fixture replacement, wiring, testing
Yes
Floors 1-5 office areas
3
 
 
 
 
 
 
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Operational Disruption Impact Assessment (Rate severity 1-5, where 5 is maximum disruption)

Noise & Vibration

Dust & Air Quality

Access Restrictions

Power Interruptions

Network/IT Disruption

Parking Availability

Will any areas require temporary shutdown or evacuation?

 

Specify shutdown duration, affected areas, and temporary relocation plan

Does the project require after-hours or weekend work?

 

Detail after-hours schedule, premium labor cost impact, and security arrangements

Safety & Risk Mitigation Measures (select all applicable)

Communication Plan for Building Occupants & Stakeholders

Are there any seasonal constraints or blackout periods?

 

Specify restricted periods and rationale (e.g., peak season, exams, holidays)

Contingency Plan for Unexpected Issues or Delays

Upload Construction Schedule Gantt Chart (PDF or image)

Choose a file or drop it here
 

5. Section 5: ESG Committee & Asset Manager Approval

Complete all required approvals, risk assessments, and compliance verifications necessary for ESG Committee and Asset Manager authorization to proceed with project execution.

 

Has a preliminary risk assessment been completed?

 

Upload Risk Assessment Matrix & Mitigation Plan

Choose a file or drop it here
 
 

Explain why risk assessment is pending and propose timeline

ESG Alignment & Strategic Fit Assessment

Poor

Fair

Good

Very Good

Excellent

Carbon Reduction Contribution

Alignment with Corporate Sustainability Goals

Stakeholder Value Creation

Regulatory Compliance Enhancement

Resilience & Adaptation Benefits

Does this project comply with all relevant building codes and safety standards?

 

Identify specific compliance gaps and remediation plan

I confirm that all equipment specifications meet or exceed minimum efficiency standards

I verify that utility incentive applications have been submitted or will be submitted prior to procurement

I acknowledge that this project aligns with the facility's 5-year capital improvement plan

Facility Manager Name

Facility Manager Approval Date

Facility Manager Digital Signature

Asset Manager Name

Asset Manager Approval Date

Asset Manager Digital Signature

Does this project require ESG Committee review?

 

ESG Committee Chair Name

Has ESG Committee approval been granted?

 

ESG Committee Approval Date

 

Specify ESG Committee concerns and required actions

Final Approval Comments & Conditions

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.