Commercial Restaurant & Hospitality Tenant Alteration Request Form

1. General Applicant & Premises Information

Restaurant / Concept Entity Name

Primary Facility Use (e.g., Full-Service Restaurant, Fast-Casual, Bar/Lounge, Bakery)

Building / Center Name & Address

Suite / Space Number(s)

Total Square Footage

Primary Hospitality Operator Contact

Title

Office Phone

Mobile Phone

Email

24/7 On-Site Emergency Contact

Phone

Email

2. Scope Of Hospitality & Kitchen Alterations

Target Schedule

Proposed Construction Start Date

Target Health Department Inspection Date

Target Grand Opening / Reopening Date

Categories of Work (Check all that apply

Detailed Description of Improvements:

Provide a complete narrative of all kitchen equipment, plumbing modifications, and dining room alterations (attach extra sheets if necessary)

3. Design & Food Service Consultants

Food Service Equipment / Kitchen Designer

Company Name

Lead Designer

Phone

Email

MEP / Plumbing & Mechanical Engineer

Company Name

Lead Engineer

License #

Phone

Email

4. General Contractor & Specialized Trade Directory

General Contractor (GC)

Company Name

On-Site Project Superintendent

Mobile

Office Phone

Email

Commercial Construction License Number

Sub-Contractor List

Trade

Company Name

Contact Person

Phone Number

A
B
C
D
1
Commercial Kitchen Plumbing
 
 
 
2
Kitchen Exhaust & HVAC
 
 
 
3
Kitchen Fire Suppression (ANSUL)
 
 
 
4
Refrigeration & Walk-In Units
 
 
 
5
Commercial Electrical
 
 
 

5. Comprehensive Submission Checklist

Attach two (2) physical drawing sets and one (1) digital PDF set of the following:

 

Stamped Architectural & Kitchen Equipment Layout: Fully dimensioned floor plans showing equipment schedules, cookline spacing, egress paths, and ADA compliance.

MEP & Mechanical Hood Calculation Sheets: Stamped engineering drawings detailing CFM air balance, Type I hood exhaust rates, make-up air (MUA) calculations, and gas line sizing.

Grease Interceptor Capacity Calculations: Plumbing sizing calculations for exterior or sub-floor grease traps, verified against municipal sewer standards.

Rooftop & Structural Weight Evaluations: Structural engineering clearance for rooftop exhaust fans, pollution control units (PCUs), and refrigeration compressors.

Health Department Plan Review Application: Submitted copies of state/local environmental health agency plans and food handling permit applications.

Certificate of Insurance (COI): COI for GC and sub-contractors naming Landlord and Property Management as Additional Insureds (Minimum limits: $5,000,000 Commercial General Liability, $1,000,000 Auto, Workers’ Comp per statutory limits).

Plan Review Deposit Fee.

Deposit fee per lease agreement stipulations

Physical Drawing

Choose a file or drop it here
 

Physical Drawing

Choose a file or drop it here
 
 

Digital PDF

Choose a file or drop it here
 

6. Restaurant & Hospitality Operational Rules & Conditions

Check each box to confirm agreement. All items are mandatory for request approval.

 

Rooftop Integrity & Grease Exhaust Ducts

All Type I kitchen hood ducts penetrating the roof slab must be welded water-tight (black iron or stainless steel) and fire-wrapped to meet local mechanical codes. Roof curbs for exhaust fans must be installed by a landlord-approved roofing contractor to preserve roof warranty. Approved grease containment boxes must be installed on all exhaust fans.

Slab Cutting & Trench Drain Scanning

Core drilling or slab trenching for floor sinks, grease waste lines, or trench drains requires floor-penetration scanning (GPR) to identify post-tension cables or under-slab main utility feeds prior to cutting. Slurry waste must be captured immediately and never flushed into building sewer lines.

Odors, Heavy Cooking Exhaust & Air Balance

Kitchen ventilation systems must maintain negative pressure within the kitchen area relative to the dining room and public concourses/building common areas. Pollution control units (PCUs) or carbon filtration scrubbers are required for heavy smoke or aromatic cooking (e.g., charbroiling, wood-fired ovens) to prevent odor migration into adjacent suites.

Utility Cut-Overs & Grease Interceptor Tie-Ins

Tying into central building water mains, gas risers, or main sewer lines requires a minimum of 72 hours' prior written notice to Building Management. All connection work must take place outside of operating hours of neighboring tenants.

Health Department Approvals & As-Built Submissions

Tenant and Contractor commit to delivering one complete set of final CAD and PDF "As-Built" drawings, an executed municipal Certificate of Occupancy, and official Health Department Operational Permit sign-offs within thirty (30) calendar days of opening.

7. Tenant & Contractor Acknowledgement

By checking the operational boxes above and signing below, the Tenant and General Contractor confirm that all restaurant construction and kitchen installation protocols have been reviewed and agreed upon. Work cannot commence until written authorization is issued by Building Management.

General Contractor

Authorized Signature

Tenant Hospitality Representative

Authorized Signature

For Landlord & Property Management Use Only

Date Received

Reviewed By

Kitchen Exhaust & MEP Status

Health Dept & Grease Trap Review

COI & Roof Contractor Sign-Off

Management Notes & Special Approvals

Landlord / Asset Operations Director Signature

Form Template Insights

Please remove this form template insights section before publishing.


Here is a detailed breakdown of the structural mechanisms, key operational risks, and design principles behind each section of the form:

Section 1: Applicant, Primary Facility Use & Emergency Contacts

  • Primary Function: Identifies the operating entity responsible for the space and establishes the exact culinary operational model.
  • Key Insight: A coffee shop, a full-service steakhouse, and a high-volume fried chicken concept carry vastly different physical footprints. Defining the precise concept alerts property managers to specific infrastructural strains, such as high peak gas demand, heavy electrical loads for refrigeration, or intense cooking grease output.
  • Critical Element: Demanding a 24/7 on-site emergency contact guarantees that facility managers can instantly reach operational directors if a grease trap overflows, a gas line pressure drops, or a rooftop exhaust fan fails after hours.

Section 2: Scope of Work & Target Schedule

  • Primary Function: Details the precise scope of physical alterations and aligns the project with critical inspection milestones.
  • Key Insight: Restaurant construction requires distinct specialized systems—such as Type I fire-rated exhaust hoods, ANSUL fire suppression, walk-in coolers, and underground grease interceptors. Categorizing these modifications allows property directors to instantly route plans to specialized mechanical and plumbing engineers.
  • Timing Sensitivity: Linking construction timelines to local Health Department inspection target dates helps prevent delayed openings that disrupt shopping center traffic or leave spaces dark longer than anticipated.

Section 3: Design & Food Service Consultants

  • Primary Function: Verifies that qualified, credentialed design experts engineered the specialized food service infrastructure.
  • Key Insight: Commercial kitchen design requires technical expertise beyond standard commercial architecture.
    • Food Service Equipment Designers: Ensure kitchen equipment layouts provide proper working clearances and comply with commercial food safety codes.
    • MEP Engineers: Calculate air balances to ensure cooking exhaust rates match make-up air intake, avoiding negative pressure problems that pull odors into common corridors.
    • Capturing these credentials shifts technical accountability directly to certified specialists.

Section 4: General Contractor & Specialized Trade Directory

  • Primary Function: Verifies that physical installations are handled by licensed trade specialists familiar with commercial kitchen mechanics.
  • Key Insight: Installing kitchen hood exhaust, gas manifolds, and underground plumbing requires specialized craftsmanship. Documenting active licenses and direct contact details for trade sub-contractors provides facility managers with direct access to on-site project leads when issues arise.

Section 5: Comprehensive Submission Checklist (The Hospitality Documentation Gate)

  • Primary Function: Serves as an absolute gateway that must be cleared before any physical work receives approval.
  • Key Insight: This section mandates essential, high-stakes technical attachments:
    • Architectural & Equipment Layouts: Confirms food prep zones, cooking lines, and seating areas comply with local accessibility and safety egress standards.
    • Mechanical Hood & CFM Calculations: Proves that kitchen exhaust systems will adequately capture smoke and grease while supplying balanced fresh air.
    • Grease Interceptor Capacity Calculations: Ensures grease traps are sized properly to keep cooking fats and oils out of municipal sewer lines.
    • Rooftop Structural Evaluations: Structural engineering clearance verifying that the roof can support heavy exhaust fans, makeup air units, and pollution control equipment without structural failure.
    • Certificates of Insurance (COI): Demands high coverage limits ($5M+) to protect against severe claims caused by kitchen fires, water pipe bursts, or structural roof damage.

Section 6: Restaurant Operational Rules & Checkboxes

  • Primary Function: Transforms abstract facility guidelines into binding, individual acknowledgments.
  • Key Insight: Requiring individual checkboxes forces both the tenant and contractor to actively review critical operational requirements:
    • Rooftop Integrity & Ductwork: Requires water-tight welded ductwork and landlord-approved roofers for curb installations to preserve building roof warranties and prevent leaks.
    • Slab Cutting & Trenching: Mandates floor scanning prior to cutting concrete for plumbing drains to avoid severing under-slab utilities or post-tension cables.
    • Odor & Air Balance Controls: Ensures kitchen ventilation maintains negative pressure relative to common areas, using scrubbers or carbon filters when cooking high-aroma foods.
    • As-Built & Health Department Sign-Offs: Guarantees the landlord receives updated master mechanical schematics and official health permits before the venue opens to the public.

Section 7 & Approval Block: Dual Sign-Off & Execution

  • Primary Function: Final confirmation that physical alterations remain strictly unauthorized until written approval is granted.
  • Key Insight: Requiring signatures from both the General Contractor (who oversees physical execution) and the Tenant Hospitality Representative (who carries operational and financial accountability) aligns both parties. The formal Landlord Approval block prevents early construction starts, allowing property directors to issue an immediate stop-work order if safety protocols are breached.

Mandatory Questions Recommendation

Please remove this mandatory questions recommendation section before publishing.


While every section of a restaurant alteration request form plays a supporting role, six non-negotiable core inputs act as absolute failure points if left blank. Missing any of these renders the form unusable for building operations teams, asset managers, and mechanical reviewers.

1. Primary Culinary Use & 24/7 On-Site Emergency Contacts

  • Why it is mandatory: Building management must understand the precise culinary concept to evaluate structural and utility demands. A high-volume steakhouse using open flame and heavy grease discharge presents completely different physical demands than a bakery using electric convection ovens. Furthermore, because commercial kitchens rely on continuous refrigeration and gas lines, facility staff require immediate 24/7 mobile access to operational managers to resolve after-hours gas leaks, refrigeration failures, or water pipe breaks.

2. Detailed Description of Work & Kitchen Equipment Layouts

  • Why it is mandatory: Commercial kitchens pack extreme utility density into limited square footage. Facility managers must review the exact physical layout of the cookline, food prep areas, and seating configurations to ensure emergency egress paths remain clear and structural floor loads are not exceeded by heavy equipment like commercial stone deck ovens or walk-in refrigeration boxes.

3. Mechanical Hood Exhaust Specifications & Air Balance Calculations (CFM)

  • Why it is mandatory: Kitchen ventilation is one of the highest-risk mechanical systems in a commercial building. If exhaust rates are calculated incorrectly, cooking smoke and heavy grease will migrate into neighboring retail stores or public concourses. Furthermore, improper air balance creates severe negative air pressure, causing doors to slam shut or pulling foul sewer odors into the dining area.

4. Grease Interceptor Capacity Calculations & Slab Trenching Plans

  • Why it is mandatory: Cooking fats, oils, and grease (FOG) entering standard plumbing lines will solidify and cause severe main sewer line backups throughout the entire property. Requiring stamped plumbing calculations ensures the grease trap is properly sized for peak washing volume. Additionally, specifying floor-trenching plans guarantees the contractor scans the concrete before cutting to avoid severing under-slab structural post-tension cables.

5. Rooftop Weight Evaluation & Dedicated Roofing Contractor Verification

  • Why it is mandatory: Commercial exhaust fans, heavy pollution control units (PCUs), and make-up air handlers add substantial weight to the roof structure. Verifying load limits prevents structural sagging or roof deck failure. Requiring a landlord-approved roofing contractor to handle all duct penetrations guarantees that roof curbs are properly flashed and sealed against water leaks without voiding the building's overall roof warranty.

6. Dual Acknowledgment & Mandatory Signatures (Tenant Operator & Contractor)

  • Why it is mandatory: Physical alterations cannot proceed based on verbal promises or unapproved drafts. Signed acknowledgments from both the Tenant Hospitality Representative (who carries operational and financial accountability) and the General Contractor (who controls the physical job site) confirm that both parties agree to follow all building rules, odor containment protocols, and health department sign-off timelines.