Complete this clearance at the start of each duty period. It records the information needed to confirm that the platform, the crew and the planned work are ready to proceed. It is a record-keeping aid only and does not replace any site-specific permit, risk assessment or instruction that may be required at your facility.
Platform, installation or facility name
Field, block or licence area
Clearance or record reference number
Date of this clearance
Shift start time
Shift end time
Which duty period does this clearance cover?
Day shift
Night shift
Back shift or swing shift
Bridge between shifts
Other
Please describe the duty period
Person completing this clearance form
Role or job title of the person completing this form
Company or contractor
Record the conditions observed at the time of clearance. Conditions offshore can change quickly, so re-check before starting any sensitive activity.
General weather outlook for this duty period
Fair and stable
Unsettled
Improving
Deteriorating
Adverse conditions expected
Other
Please describe the outlook
Wind speed observed (in knots)
Sea state at the time of clearance
Calm (glassy to slight)
Moderate
Rough
Very rough or higher
Not visible from this location
Air temperature (in degrees)
Visibility
Clear
Haze or light fog
Reduced visibility
Poor visibility
Darkness or low light
Are there any active weather-related restrictions in place on the platform?
Which restrictions apply?
Lifting operations suspended or limited
Personnel transfer by vessel suspended
Helicopter movements suspended
Work at height restricted
External deck access restricted
Crane operations limited to certain radii
Other
Please describe the other restriction
No weather-related restrictions are recorded for this duty period. Continue to monitor conditions throughout the shift.
List the people involved in today's scope and confirm that their competence records and fitness status are current. Use the table to keep the manifest in one place.
Total personnel currently on the platform
Number of personnel directly involved in today's work scope
Crew manifest and readiness check
Full name | Company or contractor | Role or trade | Competence record current? | Fit for duty today? | Site induction valid? | ||
|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | ||
1 | A. Okafor | Marine Services Co. | Scaffold supervisor | ||||
2 | R. Halim | Platform Operations | Mechanical technician | ||||
3 | S. Neves | Inspection Services | Rope access inspector | ||||
4 | |||||||
5 | |||||||
6 | |||||||
7 | |||||||
8 | |||||||
9 | |||||||
10 |
Has every person in the work crew received a task briefing for today's scope?
Briefing time and who delivered it
What remains outstanding before the briefing can be completed?
Are interpreters or additional communication aids needed for the briefing?
Please describe the arrangement
Is any crew member currently working under a temporary medical or fitness limitation?
Please describe the limitation and how it is being managed (avoid recording detailed medical information)
Brief description of the work to be carried out during this duty period
Exact work location (deck, module, level or equipment tag)
Which activities are included in today's scope?
Hot work (welding, grinding, cutting, flame)
Cold work or mechanical work
Work at height or rope access
Confined space or enclosed space entry
Lifting, rigging or suspended load handling
Electrical work or energised testing
Pressure testing or hydrotesting
Chemical handling or transfer
Painting, coating or abrasive blasting
Diving or subsea support
Well intervention or well testing
Radiography or use of a radiation source
Excavation, drilling or deck penetration
None of the above
Hot work permit or fire watch reference
Entry permit or standby person reference
Lift plan or rigging equipment reference
Please describe the radiation source controls and exclusion zone
Which hazard categories were identified for this scope?
Ignition sources or flammable atmosphere
Stored energy (pressure, spring, hydraulic, electrical)
Toxic, corrosive or asphyxiant atmosphere
Moving, rotating or rotating equipment
Falling objects or dropped objects from height
Slips, trips and uneven surfaces
Noise above normal conversation level
Manual handling or awkward posture
Extreme heat or cold surfaces
Radiation source
Marine transfer or personnel transfer
Simultaneous operations interface
Other
Please describe the other hazard
Summary of the main controls agreed for these hazards
Have all energy sources relevant to this scope been identified and isolated?
Isolation certificate, register or lock box reference
What must be completed before any work begins?
Has a gas test been carried out at the work location before starting?
Gas test readings at the work location
Test time | Location sampled | Oxygen percent | Flammable gas percent lower explosive limit | Hydrogen sulphide parts per million | Other toxic gas parts per million | Tester name | ||
|---|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | G | ||
1 | 6:15 AM | Module B, pump skid P-2201 | 20.9 | 0.0 | 0.0 | 0.0 | R. Halim | |
2 | 6:20 AM | Module B, enclosed drain pit | 20.8 | 0.0 | 0.0 | 0.0 | R. Halim | |
3 | ||||||||
4 | ||||||||
5 | ||||||||
6 | ||||||||
7 | ||||||||
8 | ||||||||
9 | ||||||||
10 |
Please explain when and how the gas test will be completed
Is continuous gas monitoring required during the work?
How will the monitoring be carried out?
Personal monitors worn by each person
Fixed area monitor at the work site
Dedicated gas tester on standby
Combination of the above
Which personal protective equipment is required for this scope?
Hard hat with chin strap
Safety glasses or goggles
Protective gloves
Steel-toe safety footwear
Coveralls or flame-resistant clothing
Hearing protection
Fall arrest harness and lanyard
Respiratory protection or breathing apparatus
Chemical suit or apron
Life jacket or flotation aid
Other
Please describe the other protective equipment
Is specialist rescue equipment positioned at or near the work site?
Which rescue equipment is in position?
Tripod or davit with retrieval winch
Rescue stretcher or basket
Self-contained breathing apparatus set
Escape breathing device
First aid kit and trained first aider
Rescue team notified and on standby
Other
Please describe the other equipment
What alternative rescue arrangement is in place, if any?
Record the permits or work authorisations referenced for today's scope, and note any nearby activity that could affect the work front.
Permits and work authorisations referenced
Permit or authorisation reference | Activity covered | Area or equipment | Issued and in force? | Valid through date | Issuing authority name | ||
|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | ||
1 | HW-0417-02 | Welding on pump base | Module B, P-2201 | 4/17/2026 | M. Duarte | ||
2 | CSE-0417-01 | Drain pit inspection | Module B, drain pit | 4/17/2026 | M. Duarte | ||
3 | |||||||
4 | |||||||
5 | |||||||
6 | |||||||
7 | |||||||
8 | |||||||
9 | |||||||
10 |
Are other work fronts or operations active nearby that could affect this scope?
Please describe the nearby activity and the coordination measures agreed
Which interface activities are expected during this duty period?
Crane or lifting operations
Helicopter movements
Vessel supply, crew transfer or standby vessel activity
Well testing or well intervention
Flaring or depressurisation
Process start-up, shutdown or upset response
Drilling or completions activity
Pigging or pipeline operations
None expected
Primary radio channel or call sign for this work front
Has a shared communication check been completed with the other active work fronts?
Time of the communication check
When is the communication check planned?
Which emergency arrangements have been confirmed for this duty period?
Muster station assigned and understood by the crew
Emergency alarm system tested
Headcount or permit-to-work board system in place
Rescue team briefed on today's scope
Breathing apparatus available and checked
Wind direction indicator checked
Emergency communications tested
Evacuation options (helicopter, vessel, temporary refuge) reviewed
First aid provision confirmed
None of the above
Muster station assigned to the work crew
Has the emergency alarm been tested during this duty period?
Time of the alarm test
When is the alarm test planned?
Number of personnel accounted for at the most recent headcount
Is the work area tidy, with clear access and egress routes?
Access and egress routes are recorded as clear for this duty period.
What housekeeping or access issues need to be resolved before work starts?
Are barriers, signage and exclusion zones in place around the work site?
Which controls are in place?
Physical barriers or guardrails
Warning signage
Exclusion zone marked on the deck
Deck opening covers secured
Lighting adequate for the task
Other
Please describe the other control
Please review each statement below and record your assessment. If any item is not yet in place, note the outstanding action before work begins.
Rate the readiness of each area for this duty period
Not ready | Partly ready | Ready with minor actions | Fully ready | Not applicable | |
|---|---|---|---|---|---|
The work scope is clearly understood by the crew | |||||
All isolations and energy controls are in place | |||||
Gas testing and monitoring arrangements are complete | |||||
Barriers, signage and housekeeping are satisfactory | |||||
Interfaces with other work fronts are agreed | |||||
Emergency arrangements are understood and ready |
Outstanding actions or conditions attached to this clearance
I confirm that the information recorded in this form is accurate to the best of my knowledge.
I understand that work will not begin until the controls listed in this form are in place and any outstanding actions are closed.
I understand that this form is a record-keeping aid and does not replace any site-specific permit, risk assessment, procedure or instruction that may be required at this facility.
Do you want a follow-up review before the next duty period?
What should be reviewed at the handover?
Name of the person authorising this clearance
Role or position of the authorising person
Date and time of authorisation
Signature of the authorising person
Name of the person receiving the handover
Overall confidence that the work front is ready to proceed
To configure an element, select it on the form.