Please complete this form as accurately as you can. The information you provide is used to build an indicative cost estimate for laboratory testing services. Figures produced by this calculator are estimates for planning and quotation purposes; final pricing may change once samples are received and work is scoped in detail.
Company or organisation name
Contact person
Job title or department
Email address
Phone number
Billing or invoicing address
Building name
Street address
City
State/Province
Postal/Zip Code
Customer or account reference number (if applicable)
Is this request being made on behalf of a third party?
Please provide the third party organisation name and a contact point:
I confirm the details above belong to the organisation that will receive the quotation.
How did you first hear about these laboratory services?
Referral from a colleague or partner
Search engine or website
Industry event, exhibition or conference
Existing business relationship
Printed catalogue or brochure
Other:
Do you already hold a purchasing account or framework agreement with the laboratory?
Please enter the agreement or account reference:
Project or job title
Your purchase order or internal project reference
Brief description of the project and what you are trying to find out
Preferred date for samples to arrive at the laboratory
Target date for results or report
Date by which this quotation should remain valid until
How urgently do you need the work completed?
Standard turnaround
Priority turnaround
Urgent or expedited turnaround
Flexible — no fixed deadline
Not sure yet
What deadline must be met for priority handling?
What is the critical deadline driving urgent handling?
What factors still need to be confirmed before a deadline can be set?
Is this request part of an ongoing or repeat programme of work?
Please describe the expected frequency and volume (for example monthly batches, quarterly audits):
Is similar testing likely to be requested again in the future?
Possibly, if the results are useful
Unlikely
Unknown at this stage
Sample quantity and condition drive much of the final cost. Please list each sample or sample group separately so that preparation, handling and disposal needs can be estimated.
Sample Register
Sample ID or batch reference | Description or material matrix | Number of units | Received condition or storage need | Special handling notes | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | SMP-001 | Polymer granulate, dark grey | 3 | Ambient, sealed bags | Keep sealed until testing | |
2 | SMP-002 | Surface swab from production line | 6 | Chilled transport box | Analyze within 48 hours of receipt | |
3 | ||||||
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Which sample types are included in this request?
Solid material
Liquid
Powder or granulate
Gas or vapour
Coating or surface layer
Composite or multi-layer material
Waste or residue
Other
Please describe the sample type:
Total number of samples to be submitted
Estimated number of individual measurements or determinations required
What condition will samples be in when they arrive?
Ready to test as received
Require size reduction or preparation
Require conditioning (for example drying or temperature equilibration)
Require digestion or dissolution
Require separation or extraction first
Not sure — please advise
Please describe the sample condition so the laboratory can recommend preparation steps:
Are any samples hazardous, flammable, corrosive or otherwise restricted for transport or handling?
Please describe the hazards and any handling precautions, and upload any safety data or transport documentation below:
I confirm samples are supplied with accurate handling and safety information.
Is documented chain-of-custody or traceability recording required for these samples?
Which traceability records would you like included?
Sealed sample log
Signed transfer records
Photographic record on receipt
Tamper-evident packaging record
Detailed custody timeline in the report
Will samples need to be retained after testing?
For how long should retained samples be stored?
Up to 1 month
1 to 3 months
3 to 6 months
6 to 12 months
More than 12 months
Optional: upload a photograph of a representative sample
Optional: upload sample lists, safety data sheets or supporting documentation
Which categories of testing are you requesting?
Chemical composition analysis
Trace or residue analysis
Physical and mechanical testing
Thermal analysis
Spectroscopic analysis
Chromatographic or separation analysis
Microstructural or imaging examination
Contaminant or impurity screening
Performance or functional testing
Stability or durability assessment
Other
Please describe the type of testing you need:
Which specific analytes, properties or parameters should be measured?
Which method basis should the work follow?
A recognised published standard method
A method specified by the customer
An in-house laboratory method
A literature or academic method
No preference — please recommend
Please list the standard method reference numbers and issuing bodies where known:
Please upload the customer-specified method or procedure
Please describe the in-house method and any documentation you can share:
What outcome or decision will the results support? This helps the laboratory suggest a suitable approach.
Does the method need to be verified or validated before routine testing begins?
Which validation or verification activities should be included in the estimate?
Selectivity or specificity checks
Linearity and range assessment
Precision or repeatability study
Recovery or accuracy study
Detection and quantification limits
Measurement uncertainty estimation
Documented validation report
Are results required for comparison against a specification limit or acceptance criteria?
Please provide the specification values or acceptance limits to be applied:
What should be included in the deliverable?
Written test report
Certificate or statement of results
Raw data files
Graphs, spectra or chromatograms
Measurement uncertainty statement
Comparison against specification
Summary of observations and conclusions
Recommended follow-up actions
How complex do you consider this testing request to be?
Is specialist interpretation or consultation required alongside the test results?
Approximately how many hours of specialist consultation do you anticipate?
List each planned activity with the expected analyst time and an hourly rate. The cost column is calculated automatically from hours multiplied by rate. Adjust the rates to match your internal charge-out structure.
Analyst Labour Breakdown
Activity or task | Analyst grade or role | Estimated hours | Hourly rate | Estimated labour cost | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Sample receipt, logging and preparation | Technician | 4 | $45.00 | $180.00 | |
2 | Instrument analysis and measurement | Analyst | 12 | $65.00 | $780.00 | |
3 | Data processing and report preparation | Senior analyst | 5 | $85.00 | $425.00 | |
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Total estimated analyst hours for the project
How will the work be staffed?
A single analyst will complete all work
A small team will share the work
A senior specialist will supervise routine staff
An external specialist will be engaged
Not decided yet
Please describe the external specialist skills required and the expected involvement:
Is out-of-hours, weekend or shift working likely to be required?
Approximately how many hours would attract an out-of-hours rate?
Should additional time be allowed for review and quality checks by a second person?
How many additional review hours should be allowed?
Enter the reagents, reference standards, gases and other chemical materials expected to be consumed. Totals are calculated automatically from quantity multiplied by unit cost.
Reagent and Materials Schedule
Reagent, standard or material | Grade or specification | Quantity | Unit cost | Total cost | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Calibration reference standards | Analytical grade | 2 | $120.00 | $240.00 | |
2 | Carrier and detector gases | High purity | 1 | $95.00 | $95.00 | |
3 | Acids and solvents for digestion | Analytical grade | 3 | $40.00 | $120.00 | |
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Are any specialist, rare or unusually expensive reagents required?
Please list those materials and any supply lead-time considerations:
Should shared stock or laboratory-wide reagent usage be allocated to this job?
How should shared reagent usage be allocated?
Proportional to number of samples
Proportional to analyst hours
Fixed percentage uplift on direct costs
Actual measured consumption only
Does the customer intend to supply any materials or reagents free of charge?
Please list the customer-supplied materials and their expected condition on arrival:
Instrument time often represents a significant share of laboratory cost. Include setup, calibration and usage time separately so that the estimate reflects realistic instrument loading.
Equipment Usage Estimate
Instrument or equipment | Setup and calibration hours | Usage hours | Rate per hour | Total equipment cost | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Chromatography system | 1.5 | 6.0 | $70.00 | $525.00 | |
2 | Spectrometer | 1 | 4.0 | $85.00 | $425.00 | |
3 | Environmental chamber | 0.5 | 48.0 | $12.00 | $582.00 | |
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Which categories of equipment are expected to be used?
Separation instruments
Spectroscopic instruments
Microscopy or imaging systems
Mechanical test frames
Thermal analysis instruments
Environmental or conditioning chambers
Sample preparation equipment
Portable or on-site instruments
Specialised or bespoke rigs
Please describe the on-site location, duration and any access or safety requirements:
Please describe the bespoke equipment or fixture needed and who will supply it:
Is additional calibration, qualification or performance verification needed before testing?
How many extra hours should be allowed for this preparatory work?
Will extended instrument runs or unattended operation be required?
Approximately how many unattended run hours should be budgeted?
Consumables Estimate
Consumable item | Quantity | Unit cost | Total cost | ||
|---|---|---|---|---|---|
A | B | C | D | ||
1 | Sample vials and closures | 25 | $1.50 | $37.50 | |
2 | Filtration membranes | 10 | $3.20 | $32.00 | |
3 | Labelled storage containers | 8 | $2.10 | $16.80 | |
4 | |||||
5 | |||||
6 | |||||
7 | |||||
8 | |||||
9 | |||||
10 |
Are specialised containment, protective equipment or controlled-environment supplies required?
Which specialised supplies should be included in the estimate?
Protective clothing and gloves
Fume or containment equipment
Temperature-controlled packaging
Sterile or clean-room consumables
Specialised filtration or adsorbents
Secure or tamper-evident packaging
Should packaging and shipping supplies for sample return be included?
How should samples be returned or disposed of after testing?
Return to customer
Return a portion and dispose of the rest
Dispose of all samples at the laboratory
Retain for a defined period then dispose
Will any part of the work be subcontracted to an external provider?
External Services Breakdown
External service or provider | Scope of subcontracted work | Quoted cost | Handling uplift % | Amount charged to customer | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Independent analytical provider | Specialised trace analysis | $650.00 | 15 | $747.50 | |
2 | ||||||
3 | ||||||
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
All quoted work is expected to be performed in-house.
Is independent review, verification testing or an external opinion required?
Please describe the level of independent review expected and any preferred reviewer credentials:
Are courier, freight or sample transport costs to be included in the quotation?
Who will arrange and pay for sample transport?
The customer arranges and pays transport directly
The laboratory arranges transport and adds the cost to the quotation
Shared arrangement between both parties
Samples are delivered in person
Overheads, contingency and margin convert direct costs into a sustainable quoted price. Choose an allocation approach that suits your organisation and record the percentage or fixed amounts applied. Adjusting these values changes the final quotation below.
Which overhead allocation method should be applied?
Percentage of direct labour cost
Percentage of total direct cost
Fixed charge per sample
Fixed charge per instrument day
Fixed project management fee
No overhead allocation applied
What fixed charge per sample should be applied?
What fixed charge per instrument day should be applied?
What project management fee should be applied?
Overhead rate to be applied (percentage)
Calculated overhead amount
How would you rate the technical risk or uncertainty associated with this project?
Should a contingency allowance be added for unexpected work?
What contingency percentage should be added?
The estimate assumes all work proceeds exactly as scoped.
How should the profit margin be applied?
Percentage uplift on total cost
Fixed fee on top of costs
Tiered pricing based on sample volume
Pre-agreed framework or contract rate
Rate card pricing without margin uplift
What fixed fee should be added to the total cost?
Please describe the volume tiers and the rate applied to each tier:
Please enter the framework or contract rate reference:
Margin percentage to be applied
Complete the internal costing and pricing sections using your organisation's approved rates and pricing policies. Review access permissions before sharing this form or its completed responses with customers, as some cost information may be commercially sensitive.
Review the accumulated cost lines below, then complete the quotation calculation. Enter amounts in a single currency and state which currency is being used so the quotation is unambiguous.
Currency used for this quotation
Cost Summary
Cost category | Amount | Basis or notes | ||
|---|---|---|---|---|
A | B | C | ||
1 | Analyst labour | $1,385.00 | Total hours multiplied by charge-out rates | |
2 | Reagents, standards and materials | $455.00 | Direct material consumption | |
3 | Equipment and instrument usage | $1,538.00 | Setup and usage hours | |
4 | Consumables and supplies | $86.30 | Sample handling and storage supplies | |
5 | Subcontracted services | $747.50 | External specialist analysis | |
6 | Overhead allocation | $480.00 | Percentage of total direct cost | |
7 | Contingency allowance | $200.00 | Allowance for unforeseen work | |
8 | Margin | $978.36 | Percentage uplift on total cost | |
9 | ||||
10 |
Quotation Calculation
Subtotal before tax | Tax or duty rate % | Tax or duty amount | Total quoted price | ||
|---|---|---|---|---|---|
A | B | C | D | ||
1 | $5,870.16 | 0 | $0.00 | $5,870.16 |
Deposit or advance payment requested (if any)
Balance payable on completion
Number of days this quotation should remain valid
How should any variation from the quoted scope be handled?
Written approval required before additional work begins
Small variations may be absorbed within the quoted price
Additional work charged at agreed hourly rates
A revised quotation will be issued before proceeding
Not applicable for this request
What hourly rate should be quoted for additional work?
Please review the assumptions and confirm how the quotation should be prepared. This form is a planning and estimation tool; it does not replace a formal written quotation, contract or technical agreement between the parties.
Which assumptions should be recorded with this estimate?
Samples arrive in the stated condition and quantity
Customer-supplied methods are complete and workable
Materials and reagents are available at the quoted prices
Access to customer sites or equipment is arranged by the customer
Results depend on sample representativeness
Additional testing may be recommended after initial results
Which payment terms should be stated on the quotation?
Payment on receipt of invoice
Payment within 14 days
Payment within 30 days
Payment within 45 days
Advance payment before work starts
Stage payments agreed separately
Other:
Would you like the quotation to include optional add-on services that the customer can accept or decline later?
Please list the optional services and their indicative prices:
I confirm that the information provided in this form is accurate to the best of my knowledge.
I understand that this estimate is indicative and that final costs may change once samples are received and the work is scoped in detail.
I agree to be contacted about this request if any clarification is needed.
Name of person preparing this estimate
Role or title of person preparing this estimate
Date the estimate was prepared
Signature of person preparing this estimate
Signature of the customer acknowledging the estimate
Would you like a follow-up discussion about this quotation?
When is the best time to reach you?
How would you prefer to receive the formal quotation?
By email as an attachment
Through a shared online portal
By post
Collected in person
Analysis for Laboratory Testing Cost Calculator and Quotation Request Form
Important Note:
This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes.
AI-Generated Content: This template and its accompanying guidance are AI-generated to provide a practical starting point for your form-building needs. Please review and customise the content to ensure it is accurate, appropriate and suitable for your intended use.
This guide is provided for general informational and planning purposes only. It does not constitute professional, legal, financial, medical, employment, privacy, regulatory, or advice of any other kind, nor does it certify that this template is suitable or compliant for any particular jurisdiction or purpose.
Laws, regulations, industry practices and business requirements vary. You are responsible for reviewing and customising the template to suit your intended use and obtaining advice from appropriately qualified professionals where necessary.
Please delete this section before publishing your form. See our Terms of Service for further information.
The Laboratory Testing Cost Calculator and Quotation Request Form is a long-form, section-based business document designed to capture every input needed to build an indicative cost estimate for chemical analysis, materials testing and specialist laboratory services. The form opens with an introductory paragraph that transparently frames the output as an estimate for planning and quotation purposes, noting that final pricing may change once samples are received and work is scoped in detail. This expectation-setting is a genuine strength: it reduces the likelihood of disputes and encourages respondents to treat the calculator as a planning tool rather than a binding price.
Structurally, the form follows the natural flow of laboratory work — identity and contact details, project scope, sample logistics, requested tests and methods, analyst labour, reagents, equipment, consumables, subcontracting, overhead and margin, cost summary, and finally assumptions and declaration. This logical sequencing mirrors how a quotation would actually be built and makes the document easy to navigate despite its length.
Customer and Requestor Details — This opening section establishes who is requesting the work, who should be invoiced, and how communication should flow. It also collects commercial context (account references, third-party arrangements) that helps route the request correctly.
Project Overview and Timescales — This section converts a vague enquiry into a scoped job. The fields align well with the information a laboratory would need to schedule work and price turnaround realistically.
Sample Details and Handling — Sample quantity and condition are correctly identified as major cost drivers. The introductory paragraph explains why the register is structured the way it is.
Requested Tests, Methods and Standards — This is the technical core of the form and it is handled thoroughly, covering test categories, measurands, method basis, validation needs, acceptance criteria and deliverables.
Analyst Time and Labour Estimate — The cost structure is transparent and the automated formula (hours multiplied by rate) removes arithmetic errors.
Reagents, Standards and Materials — Direct material consumption is itemised with automatic totals and supplemented by questions on specialty reagents, shared stock and customer-supplied materials.
Equipment and Instrument Usage — Separating setup/calibration time from usage time is a strong design choice, since instrument loading is frequently underestimated.
Consumables and General Supplies — A compact section that captures low-value but high-frequency costs that are commonly overlooked in quotations.
Subcontracted and External Services — The section only reveals its detailed table when subcontracting applies, which keeps the form focused.
Overhead Allocation, Risk and Margin — This section is the commercial engine of the form and presents its logic openly, including a stated formula for total direct cost and a selling-price equation.
Cost Summary and Quoted Price — Cost lines are grouped into categories with a basis column, followed by a quotation calculation table that applies tax and produces a total.
Assumptions, Terms and Declaration — This closing section records the basis of the estimate and gathers sign-off, with a reminder that the document is a planning tool rather than a formal contract.
Overall, this form is a well-considered, highly functional cost calculator that balances technical depth with commercial clarity. Its strongest features are the transparent calculation tables with automatic formulas, the extensive use of conditional branching so respondents only see follow-ups relevant to their answers, the realistic example rows that demonstrate expected input granularity, and the explicit framing of results as indicative estimates. The structure closely mirrors how a laboratory would actually scope and price work, which should produce consistent, high-quality input data and reduce clarification cycles.
Areas that could be refined include managing the form's substantial length — completion may feel demanding for simple requests, so a short version or a progress indicator could help maintain completion rates. Consider adding brief scale descriptions to the 1–5 complexity and risk ratings to improve consistency across respondents. Some numeric and currency fields would benefit from explicit format validation, and the three declaration checkboxes might reasonably be reconsidered as required items if the form creator wants to guarantee that acknowledgements are recorded. A currency-specific number format and a visible running total would also enhance usability in the cost sections. These are proportionate refinements; the underlying design is sound and operational.
Mandatory Question Analysis for Laboratory Testing Cost Calculator and Quotation Request Form
Important Note:
This section explains why certain fields in this form are marked as required and provides general guidance on how these requirements may support the collection of complete, accurate and relevant information.
Required fields and information-collection obligations may vary depending on your industry, jurisdiction, business operations and intended use of the form. A field marked as required in this template does not necessarily mean that collecting the information is legally mandatory.
Please review each required field to determine whether it is necessary, appropriate and lawful for your particular purpose. Consider applicable privacy, data protection, consent and industry-specific requirements, and consult an appropriately qualified legal, privacy or compliance professional where necessary.
Please delete this section before publishing your form. See our Terms of Service for further information.
Question: Company or organisation name
Recommendation: Requiring this field supports accurate record-keeping by associating each request with a specific customer entity. For a quotation-oriented form it is a practical core identifier, since the organisation name typically appears on the quotation and later invoice. Form administrators should confirm whether trading names or registered names better suit their internal records.
Question: Contact person
Recommendation: A named contact supports operational follow-up when technical or scope clarifications are needed before the estimate can be finalised. Making this mandatory helps prevent anonymous or unactionable submissions. If requests are sometimes submitted by teams or shared mailboxes, consider whether allowing a departmental contact would serve equally well.
Question: Email address
Recommendation: Marking the email address as mandatory provides a reliable digital channel for delivering the quotation and requesting clarifications. It also supports basic data matching against existing customer records. Depending on your organisation's data handling practices, consider adding a brief notice explaining how submitted contact details will be used and retained.
Question: Billing or invoicing address
Recommendation: Capturing a billing address as mandatory helps ensure the quotation document is complete and usable without later rework. Where a customer's billing address differs from the delivery or project address, this field also helps distinguish between commercial and technical contacts. Whether this needs to be complete at estimate stage depends on the organisation's process; some businesses collect it only once an order is confirmed.
Question: Project or job title
Recommendation: A mandatory project title provides a short, searchable label for internal tracking, scheduling and correspondence. It reduces ambiguity when multiple requests exist for the same customer. Short descriptive guidance in the placeholder helps respondents supply a useful title rather than a generic reference.
Question: Brief description of the project and what you are trying to find out
Recommendation: Requiring a project description supports data completeness at the point where scope is defined. The stated objective of the work directly informs method selection, complexity assessment and the accuracy of the cost estimate. Because free-text answers can vary in detail, consider providing a short prompt or word-count hint to encourage substantive responses.
Question: Target date for results or report
Recommendation: A required target date supports scheduling, capacity planning and any turnaround-based pricing applied to the quotation. Without it the estimator cannot assess whether standard or expedited resources are needed. The necessity of this field depends on the form creator's turnaround commitments; where delivery dates are agreed later, it may be more appropriate as an optional field.
Question: Total number of samples to be submitted
Recommendation: Sample quantity is a primary cost driver for laboratory work, influencing preparation effort, consumables, instrument time and overhead allocation. Requiring this numeric field helps ensure the estimate is grounded in realistic throughput figures. It works well alongside the sample register table and provides a quick summary figure.
Question: Which categories of testing are you requesting?
Recommendation: Requiring at least one testing category supports routing and resource estimation, since different analytical disciplines draw on different equipment and skills. As a multiple-choice item it also produces structured data that is easy to aggregate and report on. Ensure respondents can always select an option, including the Other choice, so the mandatory setting does not create a blocking point.
Question: Which specific analytes, properties or parameters should be measured?
Recommendation: This field is central to scoping the technical work and, therefore, the cost. Requiring it helps ensure that no quotation is prepared on an undefined measurand, which reduces the risk of later scope disputes. A brief example or guidance note (already present in the placeholder) supports consistent, useful entries.
Question: Which method basis should the work follow
Recommendation: Making the method basis mandatory helps the laboratory determine whether existing validated procedures apply or whether new method development and verification would be required — a significant cost distinction. Because the follow-up questions adapt to the selected option, the mandatory setting drives a coherent, scoped enquiry. Whether this must be decided at quotation stage depends on the organisation's practice; for some requests a recommendation from the laboratory is the expected outcome.
Question: What should be included in the deliverable?
Recommendation: Requiring a deliverable selection supports scope clarity by defining exactly what the quoted price covers, from raw data files through to interpreted conclusions. This helps prevent later disagreements about report contents and reduces re-issuing work. Confirm that the mandatory setting reflects how your organisation handles customers who are unsure what they need at enquiry stage.
Question: Total estimated analyst hours for the project
Recommendation: Analyst time typically represents the largest cost component of laboratory work, so requiring an hours figure ensures the estimate has a quantified labour basis. It also serves as a useful cross-check against the detailed labour table. Where the form is completed by the laboratory rather than the customer, this field supports internal review and approval of the estimate before release.
Question: Currency used for this quotation
Recommendation: Explicitly requiring a currency removes ambiguity from every monetary figure in the cost tables and the final quoted price. It is particularly useful where customers or subcontractors are located in different regions. Requiring it alongside the numeric cost fields is proportionate and low-friction.
Question: Which assumptions should be recorded with this estimate?
Recommendation: Requiring an assumptions selection supports operational transparency by documenting the conditions on which the estimate is based. It gives both parties a shared reference if scope later changes. Consider whether this must be mandatory for every request or whether a sensible default set of assumptions could be applied automatically, with optional editing, to reduce effort at completion.
Question: Name of person preparing this estimate
Recommendation: Requiring the preparer's name supports internal accountability and makes it straightforward to resolve later questions about how the figure was derived. It is a low-effort field that adds meaningful traceability to the record. Where estimates are prepared by automated or shared systems, consider whether a role-based identifier would be more appropriate than an individual name.
Question: Date the estimate was prepared
Recommendation: A mandatory preparation date supports version control and pairs naturally with the quotation validity period stated elsewhere in the form. It helps both parties understand the currency of the figures, especially where material or subcontract costs may change over time.
The form currently requires seventeen fields, distributed across customer identity, project scope, sample quantity, technical requirements, labour, commercial settings and authorship. This is a proportionate approach for a detailed internal or business-to-business estimation tool, where the primary users are likely to be completing the form with access to the underlying project information. Requiring core identity and scope fields helps ensure the estimate is actionable, while leaving many detail fields optional (telephone number, job title, purchase order reference, sample measurements, signature fields) keeps the completion burden reasonable.
To configure an element, select it on the form.