Tenant / Client Corporate Name
Data Center Facility Name & Address
Data Hall / Cage / Suite Number
Rack Cabinet Count
Primary Infrastructure Contact
Title
Office Phone
Mobile Phone
24/7 Network Operations Center (NOC) / Emergency Contact
Phone
Proposed Fit-Out / Work Start Date
Target Power-On / Commissioning Date
Categories of Work (Check all that apply)
Electrical & Power Distribution (Busway drops, PDU installation, whip runs, high-density kW upgrades)
Rack & Enclosure Infrastructure (Rack positioning, containment systems, hot/cold aisle containment)
Cabling & Fiber Connectivity (Overhead ladder racks, fiber tray extensions, cross-connect conduits)
Cooling & Environmental (In-row cooling units, perforated tile additions, floor airflow adjustments)
Life Safety & Fire Suppression (VESDA sampling tube extensions, clean agent gas system adjustments)
Physical Security & Access Control (Biometric cage locks, dedicated CCTV cameras, motion sensors)
Heavy Equipment Staging & Delivery (Crater unboxing, raised-floor load staging, server chassis lifts)
Detailed Description of Improvements:
Provide a complete summary of all proposed infrastructure modifications (attach extra sheets if necessary)
Company Name
Lead Engineer
License #
Phone
Company Name
Lead Designer
License #
Phone
Company Name
On-Site Project Manager
Mobile
Office Phone
Electrical / General License Number
Trade | Company Name | Contact Person | Phone Number | ||
|---|---|---|---|---|---|
A | B | C | D | ||
1 | High-Voltage / Critical Electrical | ||||
2 | Structured Cabling & Fiber | ||||
3 | Containment & Mechanical Systems | ||||
4 | Fire Detection & VESDA | ||||
5 | Security & Biometrics |
Attach two (2) physical drawing sets and one (1) digital PDF set of the following:
Single-Line Electrical Diagrams: Stamped engineering schematics detailing breaker sizing, PDU panel allocations, and phase-balancing calculations.
Raised-Floor Structural Load Calculations: Engineering sign-off for heavy equipment placement (e.g., concentrated server chassis, UPS cabinets, heavy transformer units).
Thermal & Airflow Impact Study: CFD (Computational Fluid Dynamics) model or cooling assessment for high-density rack clusters exceeding facility baseline kW limits per rack.
Pre-Approved Access List (Badging & COI): List of all installation technicians requiring facility security access, accompanied by background checks per data center policy.
Certificates of Insurance (COI): COI for GC and sub-contractors naming Landlord and Data Center Operator as Additional Insureds (Minimum limits: $5,000,000 Commercial General Liability, $1,000,000 Auto, Workers’ Comp per statutory limits).
Municipal / Electrical Permits: Copies of submitted permit applications or issued municipal inspection approvals where applicable.
Infrastructure Review Deposit Fee.
Deposit fee per lease agreement stipulations
Physical Drawing
Physical Drawing
Digital PDF
Check each box to confirm agreement. All items are mandatory for request approval.
Raised-Floor Tile & Weight Management
Contractor must use spreading plates when rolling heavy equipment across raised access tiles. Tiles must not be left open unattended, and tile cutouts for cable drops must use approved brush-grommet seals to maintain floor plenum pressure.
Hot / Cold Aisle Containment & Thermal Controls
All containment structures (blanking panels, roof tiles, strip doors) must meet strict fire rating standards (UL94-V0). Airflow short-circuiting must be prevented, and unused rack units must remain fitted with blanking panels.
Dust, Debris & Unboxing Regulations
Cardboard, wooden pallets, and packing foam are strictly prohibited inside the white space / data hall. All equipment must be unboxed in designated external staging areas prior to entering the server floor. Vacuuming must utilize HEPA-filtered cleanroom units.
Critical Power & EPO Protection
Tying into live PDU panels or busways requires an approved Method of Procedure (MOP) and 72 hours' advance notice. Emergency Power Off (EPO) switches must be covered and guarded during all work to prevent accidental facility shutdowns.
As-Built Submissions & Cable Certification Reports
Tenant and Contractor commit to delivering final CAD/PDF "As-Built" drawings, complete cable test/certification results, and updated rack elevation schematics within thirty (30) calendar days of commissioning.
By checking the operational boxes above and signing below, the Tenant and General Contractor confirm that all data center fit-out protocols have been reviewed and agreed upon. Work cannot commence until written authorization is issued by Facility Management.
Authorized Signature
Authorized Signature
Date Received
Reviewed By
Electrical & Thermal Review
Approved
Re-submission Required
Method of Procedure (MOP) Status
Approved
N/A
COI & Access List Verified
Yes
Pending
Management Notes & Special Approvals
Data Center Operations Director Signature
Form Template Insights
Please remove this form template insights section before publishing.
Here is a detailed breakdown of the structural mechanisms, key operational risks, and design principles behind each section of the form:
Mandatory Questions Recommendation
Please remove this mandatory questions recommendation section before publishing.
While every field on a data center alteration request form serves a structural purpose, six non-negotiable core inputs act as absolute failure points if left blank. Missing any of these renders the form unusable for critical facility directors and data center operations teams.
1. Data Hall / Cage Location & 24/7 NOC Emergency Contacts
2. Detailed Description of Work & Power Density (kW per Rack) Specifications
3. Single-Line Electrical Diagrams & Redundant Circuit Calculations
4. Method of Procedure (MOP) & Hazardous Material / Unboxing Plan
5. Certificate of Insurance (COI) with High Coverage Limits
6. Dual Acknowledgment & Mandatory Signatures (Tenant IT Lead & Lead Integrator)