Oversized Equipment Transit Permit Clearance

1. Equipment Serial Number, Axle Weight & Dimensions Metadata

Please provide accurate and complete metadata for the oversized equipment being transported. This information is critical for permit approval and route planning.

 

Equipment type

 

Specify other equipment type

Equipment serial number

Manufacturer

Model

Year of manufacture

Total weight (tonnes)

Overall length (m)

Overall width (m)

Overall height (m)

Ground clearance (mm)

Is the load balanced per manufacturer specifications?

 

Please provide details of any deviations.

 

Describe the imbalance and mitigation measures:

Axle weight distribution

Axle number

Axle type (e.g., front, rear, tag)

Weight (tonnes)

Load distribution (%)

Verified

A
B
C
D
E
1
1
Front
10
25
2
2
Rear
20
50
3
3
Tag
10
25
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Center of gravity distance from front axle (m)

Equipment inspected and certified for transport

Upload equipment photo (side view)

Choose a file or drop it here

Upload manufacturer's load rating certificate

Choose a file or drop it here
 

Transport risk level (1 = low, 5 = high)

Critical dimensions check

Within standard limits

Requires permit

Exceeds permit threshold

Overall length

Overall width

Overall height

Total weight

2. Highway Route Survey, Bridge Load Limit & Overhead Clearance Check

Provide detailed route information from origin to destination, including any bridges, overhead obstructions, or weight/height restrictions.

 

Origin site address

Destination site address

Route segments

Segment number

Start location

End location

Distance (km)

Road type

Speed limit (km/h)

Bridge present?

Bridge load limit (tonnes)

Overhead clearance (m)

Segment verified

A
B
C
D
E
F
G
H
I
J
1
1
Site A
Highway 1
50
Highway
80
 
0
5.5
2
2
Highway 1
Bridge 1
10
Highway
80
Yes
40
5.5
3
 
 
 
 
 
 
 
 
 
4
 
 
 
 
 
 
 
 
 
5
 
 
 
 
 
 
 
 
 
6
 
 
 
 
 
 
 
 
 
7
 
 
 
 
 
 
 
 
 
8
 
 
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
 
 
10
 
 
 
 
 
 
 
 
 

Are there any bridges on the route?

 

Bridge details

Bridge ID

Location

Load limit (tonnes)

Clearance (m)

Condition rating

Verified

A
B
C
D
E
F
1
B001
Mile 12
40
5.5
Good
2
 
 
 
 
 
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Are there any overhead obstructions (e.g., power lines, traffic signals)?

 

Describe each obstruction and mitigation:

Are there any weight restrictions on the route?

 

Weight restrictions

Restriction type

Location

Weight limit (tonnes)

Alternative route

A
B
C
D
1
Seasonal
Mile 20
30
Take bypass
2
 
 
 
 
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Are there any height restrictions on the route?

 

Height restrictions

Restriction type

Location

Height limit (m)

Alternative route

A
B
C
D
1
Overpass
Mile 15
4.5
Take detour
2
 
 
 
 
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Is the route subject to seasonal restrictions (e.g., spring thaw)?

 

Seasonal restriction start date

 

Seasonal restriction end date

Is the route subject to time-of-day restrictions?

 

Permitted travel start time

 

Permitted travel end time

Are there any special permits required for this route?

 

Select required permits

Route complexity level (1 = simple, 5 = complex)

Route risk assessment

Low risk

Medium risk

High risk

Bridge adequacy

Clearance adequacy

Road condition

Traffic density

Weather impact

Rank alternative routes by preference

Route A - Via Highway 1

Route B - Via Highway 2

Route C - Via local roads

Upload route survey report

Choose a file or drop it here
 

Upload bridge inspection certificates

Choose a file or drop it here
 

Route verified by qualified engineer

3. Police Escort, Pilot Vehicle & DOT Permitting Verification

Verify that all required escorts and permits are in place for the transport.

 

Is police escort required for this transport?

 

Level of police escort

 

If police escort is not required, skip to pilot vehicle section.

Is pilot vehicle required?

 

Number of pilot vehicles required

 

If pilot vehicle not required, proceed to permits.

Is DOT (or equivalent) permit required?

 

Select required permit types

 

If no DOT permit required, confirm exemptions below.

Permit details

Permit type

Permit number

Issuing authority

Issue date

Expiry date

Verified

A
B
C
D
E
F
1
Oversize load permit
OSP-2025-001
State DOT
6/1/2025
6/30/2025
2
 
 
 
 
 
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Are there any special conditions attached to permits?

 

Describe special conditions:

Is a communication plan established with escort vehicles?

 

Radio channel/phone number for escort communication

Is the transport schedule coordinated with law enforcement?

 

Scheduled briefing date/time with law enforcement

Escort adequacy level (1 = inadequate, 5 = fully adequate)

Escort & permit compliance checklist

Not started

In progress

Complete

Police escort arranged

Pilot vehicles arranged

Permits obtained

Conditions understood

Communication plan established

All escort and permit requirements fulfilled

Upload permit copies

Choose a file or drop it here
 

4. On-Site Loading/Unloading Safety & Rigging Protocol

Confirm that all safety protocols for loading and unloading are in place.

 

Is a loading/unloading plan prepared and approved?

 

Upload loading/unloading plan

Choose a file or drop it here
 
 

Explain why no plan is prepared and how safety will be ensured:

Is a rigging plan prepared and approved?

 

Upload rigging plan

Choose a file or drop it here
 
 

Explain why no rigging plan is prepared:

Are all rigging equipment (slings, shackles, etc.) inspected and certified?

 

Rigging equipment inspection

Equipment ID

Type

Capacity (tonnes)

Inspection date

Cert number

Verified

A
B
C
D
E
F
1
R001
Shackle
20
5/1/2025
CERT-001
2
 
 
 
 
 
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Describe why rigging equipment is not certified:

Is a crane or other lifting device used for loading/unloading?

 

Crane model and capacity

 

If no crane is used, describe the loading/unloading method.

Are there any overhead hazards at the loading/unloading site?

 

Describe overhead hazards and mitigation measures:

Is the ground condition suitable for loading/unloading (e.g., stable, level)?

 

Describe ground condition issues and mitigation:

Are there any underground utilities that could be affected?

 

Describe underground utilities and protection measures:

Is an exclusion zone established around the loading/unloading area?

 

Exclusion zone radius (m)

Are all personnel involved in loading/unloading trained and certified?

 

Describe training gaps and mitigation:

Is a safety briefing conducted before loading/unloading?

 

Briefing date/time

Are emergency procedures established and communicated?

 

Describe emergency contacts and procedures:

Are fire extinguishers available and accessible?

 

Fire extinguisher inspected and charged

Is a first aid kit available and stocked?

 

First aid kit checked

Is a spill kit available (if applicable)?

 

Spill kit checked

Safety measures compliance

Compliant

Non-compliant

Not applicable

Rigging equipment inspected

Crane certified

Exclusion zone established

Personnel trained

Emergency procedures in place

Loading/unloading risk level (1 = low, 5 = high)

Priority of safety measures (1 = highest priority)

Rigging inspection

Exclusion zone

Personnel training

Emergency readiness

Equipment certification

Upload safety checklist

Choose a file or drop it here
 

Loading/unloading safety clearance granted

5. Logistics Manager & Site Safety Director Joint Clearance Sign-Off

Final sign-off by Logistics Manager and Site Safety Director confirming that all required checks have been completed and the transport is cleared to proceed.

 

Logistics Manager Name

Logistics Manager Title

Site Safety Director Name

Site Safety Director Title

Sign-off timestamp

I confirm that all required checks have been completed and the transport is cleared to proceed.

Logistics Manager Signature

Site Safety Director Signature

Upload signed clearance document

Choose a file or drop it here
 

Any additional notes or conditions?

 

Additional notes:

Overall confidence in transport safety (1 = low, 5 = high)

Final clearance checklist

Incomplete

Complete

Equipment metadata verified

Route survey completed

Permits & escorts arranged

Loading/unloading safety confirmed

Sign-off obtained

Final clearance status

 

Specify conditions:

 

Reason for not clearing:

I acknowledge that this clearance is valid only for the specified transport and any changes require re-clearance.

Upload supporting documentation

Choose a file or drop it here
 

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.