Commercial Tenant Alteration Request Form

Instructions: This form must be completed by the tenant and submitted to Property Management at least 30 days prior to the proposed start date of any alterations, additions, or improvements. No work may begin without prior written approval from Property Management.

1. Tenant & Property Information

Tenant / Business Name

Property Street Address

Suite / Unit Number

City

State / Province

Postal / Zip Code

Country

Primary Contact Person

Phone Number

Email

2. General Description of Requested Alterations

Project Title

Estimated Start Date

Estimated Completion Date

Estimated Total Cost of Work

Detailed Scope of Work: (Describe all structural, mechanical, electrical, plumbing, architectural, or aesthetic changes requested)

3. Impact Assessment Checklist

Check all that apply to this project:

Category

Yes / No

Details / Notes

A
B
C
1
Structural Changes (walls, ceilings, floor loads)
 
 
2
Electrical Modifications (wiring, panels, fixtures)
 
 
3
Plumbing / Mechanical (sinks, lines, HVAC)
 
 
4
Fire Protection / Safety (sprinklers, alarms)
 
 
5
Exterior / Facade (signage, windows, doors)
 
 
6
Noise or Odor Impact (during construction)
 
 

4. Contractor & Professional Information

General Contractor Company Name

Contact Person

Phone

Contractor License Number

Architect / Engineer (if applicable)

5. Required Document Uploads

Please upload clear, high-resolution digital copies (PDF, PNG, or JPG) for each required document below. Maximum file size per attachment is 20 MB. All files must be uploaded before submitting this request.

 

1. Architectural / Engineering Drawings & Plans

Drag and drop floor plans, electrical diagrams, or structural engineer-stamped drawings here, or browse files.

File Name

Description

Upload File

A
B
C
1
 
 
 
2
 
 
 
3
 
 
 
4
 
 
 
5
 
 
 
 

2. Contractor’s Certificate of Insurance (COI)

Attach the general contractor’s COI. Ensure [Property Name / Landlord Entity Name] is listed as an Additional Insured.

File Name

Description

Upload File

A
B
C
1
 
 
 
2
 
 
 
 

3. Contractor License & Worker’s Compensation

Upload proof of contractor’s active trade license and current Worker's Compensation insurance certificate.

File Name

Description

Upload File

A
B
C
1
 
 
 
2
 
 
 
3
 
 
 
 

4. Municipal Building Permits

Trigger Question: Does this scope of work require a city/municipal building permit?

 

If Yes, Upload issued municipal permits.

File Name

Description

Upload File

A
B
C
1
 
 
 
2
 
 
 
 

If Pending

 

Estimated Permit Issue Date

Application Reference Number

 

5. Work Schedule & Noise Mitigation Plan

Upload a timeline showing major construction phases, noisy work windows, and debris removal logistics.

File Name

Description

Upload File

A
B
C
1
 
 
 
2
 
 
 

6. Tenant Acknowledgment & Terms

  1. Compliance: Tenant agrees that all work will comply with local building codes, lease terms, and building rules and regulations.
  2. Costs: Tenant is solely responsible for all costs associated with the design, permitting, construction, and maintenance of the requested alterations.
  3. Restoration: Upon lease expiration, Property Management reserves the right to require the tenant to restore the premises back to its original condition at the tenant's sole expense.
  4. Indemnification: Tenant agrees to defend and hold harmless the Landlord and Property Management from any liens, claims, or damages arising out of the performance of this work.
 

Tenant Authorized Signature

Form Template Insights

Please remove this form template insights section before publishing.


Each section of the Commercial Tenant Alteration Request Form serves a specific operational purpose. Understanding why every question is included helps tenants see that the form isn't just administrative paperwork—it is a tool designed to protect building systems, streamline approvals, and ensure a smooth construction process for everyone involved.

Overall Form Analysis

Section 1: Tenant & Property Information

  • Why it's asked: Property managers often handle dozens of units across multiple buildings. Capturing exact contact details, suite numbers, and designated project leads ensures that property management, building engineers, and emergency services know exactly who is responsible for the site and who to contact immediately if an issue arises.

Section 2: General Description of Requested Alterations

  • Why it's asked: This section gives management a high-level picture of the project before diving into technical details.
    • Project Title & Detailed Scope: Establishes a clear project baseline so everyone agrees on what work is being requested.
    • Estimated Timeline: Allows building staff to coordinate common-area access, schedule loading dock availability, and inform neighboring tenants about potential disruptions well in advance.
    • Project Cost: Provides insight into the scale and complexity of the buildout, helping management gauge the level of oversight required.

Section 3: Impact Assessment Checklist

  • Why it's asked: Commercial buildings rely on shared infrastructure. Modifying one suite can ripple across the entire property.
    • Structural Changes: Ensures heavy installations or wall removals do not exceed load capacities or compromise the building's physical framework.
    • Electrical Modifications: Prevents circuit overloads, maintains power stability for adjacent suites, and verifies that the main panel can handle increased power demands.
    • Plumbing & Mechanical (HVAC): Guarantees that water line alterations avoid leaks into lower floors and that modifications to ductwork do not throw off the building's central heating and cooling balance.
    • Fire Protection & Life Safety: Ensures fire sprinkler heads, smoke detectors, and emergency lighting remain unobstructed and fully functional during and after construction.
    • Exterior & Signage: Maintains the uniform visual design and architectural standard of the property.
    • Noise & Odor Controls: Helps management plan noisy operations (like drilling or floor grinding) or high-odor activities (like painting or welding) during off-peak or weekend hours to avoid disrupting neighboring businesses.

Section 4: Contractor & Professional Information

  • Why it's asked: Commercial construction requires skilled, accredited professionals. Requesting contractor details, trade licenses, and engineer info ensures that only qualified, licensed personnel perform work on the building’s complex systems, preventing substandard work that could lead to costly repairs later.

Section 5: Required Submission Attachments

  • Why it's asked: Verifying technical plans and credentials before work starts prevents costly mistakes on-site.
    • Architectural & Engineering Drawings: Gives the building engineer a visual blueprint to review and confirm that proposed changes fit the existing building layout.
    • Certificates of Insurance (COI) & Worker's Comp: Confirms that contractors carry active coverage for accidental property damage or worker injuries occurring on the premises.
    • Building Permits: Ensures the project complies with municipal zoning laws, safety codes, and local building regulations.
    • Mitigation Plans: Provides an actionable strategy for managing construction dust, trash disposal, and noise control.

Section 6 & 7: Acknowledgment & Approvals

  • Why it's asked: Establishes clear expectations and formal records for both sides.
    • Tenant Acknowledgment: Confirms that the tenant understands building guidelines, agrees to cover construction expenses, and accepts responsibility for restoring the space if required when the lease ends.
    • Management Approval: Creates an official paper trail showing that proposed work was thoroughly reviewed, conditionally modified if necessary, and authorized before any tools touch the space.


Mandatory Questions Recommendation

Please remove this mandatory questions recommendation before publishing.


Here are the critical fields on the form that must be required, along with why each one cannot be skipped:

Mandatory Fields

1. Suite / Unit Number & Primary Contact Info

  • Why it must be mandatory: Without specific location and primary contact details, property management cannot assign the request to the correct site engineer or log it against the proper account. Having a single designated contact person ensures urgent construction messages or emergency site notices reach the decision-maker instantly.

2. Detailed Scope of Work

  • Why it must be mandatory: Approvals cannot be granted on vague requests like "office renovation." Property engineers need an itemized list of proposed changes to evaluate whether the work affects load-bearing structures, shared ventilation systems, or central power grids.

3. Estimated Start and Completion Dates

  • Why it must be mandatory: Construction affects the daily life of the entire building. Setting mandatory start and end dates allows property staff to schedule freight elevator access, reserve loading docks, plan security coverage, and notify neighboring tenants of potential disruption windows well in advance.

4. Impact Assessment Checklist

  • Why it must be mandatory: Every commercial space connects to shared building-wide infrastructure. Forcing tenants to answer "Yes" or "No" to structural, electrical, plumbing, fire safety, and noise impacts guarantees that high-risk activities—such as shutoffs to fire sprinkler lines or heavy drilling—are flagged for special oversight before work begins.

5. General Contractor Name & License Number

  • Why it must be mandatory: Commercial building systems require skilled installation. Requiring licensed contractor credentials ensures that only accredited tradespeople touch critical building wiring, plumbing, and structural components, preserving the operational standards of the entire property.

6. Architectural Drawings / Floor Plans

  • Why it must be mandatory: Verbal or written descriptions alone can lead to misinterpretations. Requiring visual drawings ensures building engineers can verify exact wall placements, clear egress paths, and sprinkler coverage before any physical work starts on-site.

7. Contractor’s Certificate of Insurance (COI)

  • Why it must be mandatory: On-site accidents can cause property damage or worker injuries. Requiring proof of insurance before issuing approval guarantees that active coverage is in place to absorb repair or injury costs without impacting property operations or financial reserves.

8. Authorized Tenant Signature & Date

  • Why it must be mandatory: An unsigned request carries no official authority. Requiring a signature from an authorized company representative confirms that tenant leadership has reviewed the proposal, agreed to fund the project, and accepts full responsibility for adhering to building rules.


To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.