Commercial Solar & Battery Storage Permit Form

1. Applicant & Business Information

Tell us who is applying and give the legal entity that will own the system.

 

Legal business name

Trading name (if different)

Business registration number

Business structure

 

Primary contact full name

Job title

Mobile/cell phone

Email address

 

Business Street Address

 

Street address

Street address line 2

City

State/Province

Postal/Zip code

Country

2. Site & Facility Details

Provide the physical location where the system will be installed.

 

Site name (if any)

 

Installation Street Address

 

Street address

Street address line 2

City

State/Province

Postal/Zip code

Site ownership

 

Lease expiry date

Lease expiry date

Facility type

Total floor area (m²)

Number of buildings on site

Maximum building height (m)

Is the site heritage listed or in a conservation zone?

 

Upload heritage/consent documentation

Choose a file or drop it here
 

Is the site within 5 km of an airport or flight path?

 

Upload aviation authority approval

Choose a file or drop it here
 

3. Existing Electrical Infrastructure

Accurate data on the existing supply helps us assess grid stability impacts.

 

Local grid operator/distributor name

Grid supply voltage level (kV)

Meter point/MPAN

Contracted import capacity (kVA)

Contracted export capacity (kVA)

Average monthly import (kWh)

Average monthly export (kWh)

Is there on-site generation already?

 

List existing sources (type, size, age)

Is there an existing battery system?

 

Describe capacity, chemistry, and age

Is there an EV charging fleet?

 

Total charger capacity (kW)

Is there critical load backup equipment?

 

Backup type

4. Proposed Solar PV System

Detail the solar array that will be installed.

 

Total PV module quantity

Installed capacity DC (kWp)

Inverter capacity AC (kW)

Inverter topology

Module mounting method

Roof type (if applicable)

Tilt angle (degrees)

Azimuth (degrees from north)

Expected annual yield (kWh)

Performance ratio (%)

Will rapid shutdown be implemented?

 

Rapid shutdown standard

Are optimisers or micro-inverters used?

 

List model and quantity

5. Proposed Battery Energy Storage System (BESS)

Describe the battery system that will store solar energy or provide grid services.

 

Will a battery system be installed?

 

Skip the rest of this section if no battery is proposed.

 

Battery capacity (kWh)

Battery power (kW)

Battery chemistry

Nominal voltage (V)

Battery enclosure location

Cooling method

Is fire suppression integrated?

 

Fire suppression type

Will the battery provide grid services (VPP, frequency response)?

 

Select grid services

Is second-life (repurposed) battery modules used?

 

Upload repurposing test certificates

Choose a file or drop it here
 

6. Grid Stability & Power Quality

Modern grids require evidence that your system will not degrade stability or power quality.

 

Maximum fault level contribution (kA)

Expected total harmonic distortion current (%)

Power factor at PCC (lagging)

Flicker coefficient (Pst)

Is an anti-islanding relay included?

 

Relay model & standard (e.g., IEEE 1547)

Is a grid stabilising controller (GCC) installed?

 

Describe control modes (volt-var, freq-watt, etc.)

Will soft-start/stop be implemented?

 

Ramp rate (kW/s)

Reactive power mode

Is low-voltage ride-through (LVRT) enabled?

 

State voltage & time thresholds

Is high-voltage ride-through (HVRT) enabled?

 

State voltage & time thresholds

7. Digital Accountability & Cybersecurity

Digital accountability ensures transparent data and resilient control. Provide cybersecurity documentation.

 

Is remote monitoring used?

 

Remote access method

Is data logged locally?

 

Describe storage capacity & retention policy

Is data sent to a cloud service?

 

Cloud provider name & region

Are firmware updates signed?

 

Unsigned firmware is a critical vulnerability. Provide mitigation plan.

 

Is IEC 62443 compliance claimed?

 

Upload IEC 62443 certificate or report

Choose a file or drop it here
 

Is an intrusion detection system (IDS) deployed?

 

IDS vendor/model

Is a software bill of materials (SBOM) available?

 

Upload SBOM file

Choose a file or drop it here
 

Is multi-factor authentication (MFA) enforced for all admin accounts?

 

Describe alternative controls

List open TCP/UDP ports and justification

8. Protection & Safety

Provide details on all protection devices and safety studies.

 

Protection Devices List

Device type

Manufacturer

Model

Rated voltage (V)

Rated current (A)

Setting range

Certificate

A
B
C
D
E
F
G
1
AC isolator
SampleCo
ISO-3P-63A
1000
63
40-63 A
 
2
DC isolator
SampleCo
DIS-2P-25A
1500
25
15-25 A
 
3
 
 
 
 
 
 
 
4
 
 
 
 
 
 
 
5
 
 
 
 
 
 
 
6
 
 
 
 
 
 
 
7
 
 
 
 
 
 
 
8
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
10
 
 
 
 
 
 
 

Is arc fault circuit interrupter (AFCI) included?

 

AFCI standard (e.g., UL 1699B)

Is DC arc-fault protection provided?

 

Protection method (e.g., detector + isolator)

Is earth fault protection provided?

 

Earth fault device

Is surge protection device (SPD) installed?

 

SPD class & Uc (V)

Is a DC injection blocking device installed?

 

Standard (e.g., VDE 0126-1-1)

Upload arc flash study report

Choose a file or drop it here
 

Upload selectivity study report

Choose a file or drop it here
 

9. Environmental & Social Impact

Describe any environmental and social impacts and mitigation.

 

Is an environmental impact assessment (EIA) required?

 

Upload EIA report

Choose a file or drop it here
 

Will vegetation clearing exceed 1 hectare?

 

Describe re-vegetation plan

Are protected species present?

 

Upload biodiversity management plan

Choose a file or drop it here
 

Will noise levels exceed 45 dB(A) at nearest dwelling?

 

Upload noise impact assessment

Choose a file or drop it here
 

Will glare analysis be required?

 

Upload glare study

Choose a file or drop it here
 

Is a construction traffic management plan (CTMP) prepared?

 

Upload CTMP

Choose a file or drop it here
 

Will local labour be employed?

 

Percentage of local labour (%)

Is community engagement documented?

 

Upload engagement log & feedback

Choose a file or drop it here
 

10. Grid Connection Agreement

Provide the technical and commercial details required by the grid operator.

 

Grid operator connection point ID

Feeder/circuit name

Substation name

Connection voltage

Maximum import capacity requested (kVA)

Maximum export capacity requested (kVA)

Short-circuit ratio (SCR) at POC

Is a network augmentation required?

 

Describe works (new transformer, line, protection)

Is a generation connection agreement signed?

 

Upload signed agreement

Choose a file or drop it here
 

Is a net-metering/billing arrangement agreed?

 

Billing mechanism

Is a power quality compliance test required?

 

Test deadline date

Is an insurance certificate of currency (ICC) provided?

 

Upload ICC

Choose a file or drop it here
 

11. Technical Drawings & Calculations

Upload all technical drawings and calculations. Each file must be clearly labelled.

 

Single-line diagram (SLD)

Choose a file or drop it here
 

Site plan showing array & battery locations

Choose a file or drop it here
 

Roof layout & structural plan

Choose a file or drop it here
 

DC string calculations

Choose a file or drop it here
 

Earthing/grounding plan

Choose a file or drop it here
 

Lightning protection plan

Choose a file or drop it here
 

Cable schedule and routing

Choose a file or drop it here
 

Arc fault and DC isolator placement

Choose a file or drop it here
 

Battery room ventilation layout

Choose a file or drop it here
 

Fire egress and safety signage

Choose a file or drop it here
 

SCADA architecture diagram

Choose a file or drop it here
 

Cybersecurity network diagram

Choose a file or drop it here
 

12. Installation & Commissioning

Provide installation and commissioning details.

 

Expected start date

Expected completion date

EPC/installer company name

Installer licence number

Is the installer certified for battery systems?

 

Describe competency evidence

Will installation be monitored by a third-party?

 

Third-party name

Is a commissioning test plan prepared?

 

Upload test plan

Choose a file or drop it here
 

Is a witness test required by the grid operator?

 

Witness test date

Is as-built documentation ready?

 

As-built docs must be submitted within 30 days of energisation.

 

13. Declarations & Sign-offs

Review and certify the information provided.

 

I confirm that the proposed system does not exceed the technical limits stipulated by the grid operator.

I declare that all technical data is accurate to the best of my knowledge.

I accept that any false statement may result in permit cancellation.

I consent to digital archiving of this application for accountability purposes.

I agree to notify the authority of any material changes post-approval.

Full name of authorised signatory

Position/title

Date

Signature of authorised signatory

 

Analysis for Commercial Solar & Battery Storage Permit Form

Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.

Overall Form Strengths and Purpose Alignment

This Commercial Solar & Battery Storage Permit Application is a comprehensive, future-ready instrument that directly supports the stated goal of ensuring Grid Stability and Digital Accountability for commercial-scale renewable installations. By collecting granular technical, legal, and cybersecurity data in one place, the form eliminates the traditional back-and-forth between applicants, utilities, and regulators. The structure mirrors the real-world workflow of a modern distributed-energy project: entity verification → site qualification → grid impact modelling → digital-security assurance → environmental compliance → commissioning. This alignment shortens approval cycles and reduces costly re-submissions.

 

The form’s modular sectioning—Applicant & Business, Site & Facility, Existing Infrastructure, Solar PV, BESS, Grid Stability, Cybersecurity, Protection, Environmental, Grid Connection, Drawings, Installation, Declarations—creates clear hand-off points for internal reviewers (planning, protection, cyber, environment) while giving applicants a progress indicator. Conditional logic (yes-follow-up and no-follow-up) keeps the perceived length manageable; users only see fields relevant to their technology choices. Mandatory file uploads for arc-flash and selectivity studies, IEC 62443 certificates, and cybersecurity network diagrams embed safety and digital accountability directly into the permit stream rather than treating them as post-approval paperwork.

 

From a data-quality standpoint, the form enforces numeric validation for kW, kWh, kVA, THD, and power-factor entries, preventing the typographical errors that historically delay grid-impact studies. The table-based protection-device list with certificate-upload cells centralises evidence that will later be cross-checked during witness tests. Finally, the inclusion of second-life battery certification, SBOM uploads, and MFA enforcement statements anticipates emerging insurer and network-operator requirements that are not yet legislated but are rapidly becoming de-facto prerequisites for connection offers.

Key Questions Deep Dive

Question: Legal business name

This field anchors the entire permit in a verifiable legal entity. Accurate spelling exactly as registered is critical because the grid-connection agreement, metering account, and any future revenue-grade Power Purchase Agreements (PPAs) must reference the same entity. Errors here propagate into utility billing systems and can invalidate insurance or warranty documents downstream.

 

The form pairs this with Business registration number, enabling automatic look-ups against government company registries for legitimacy checks. Together, these two fields create a non-repudiable identity chain that supports digital accountability and anti-fraud measures.

 

Making this question mandatory also streamlines post-installation audits. Inspectors can cross-reference the legal name on the isolator labels, inverter settings, and SCADA assets with the permit without needing secondary clarification, reducing re-inspection costs.

 

Question: Grid supply voltage level (kV)

This single numeric entry determines which IEEE 1547/EN 50549 technical screen applies, what fault-level study is required, and whether the applicant must provide a full dynamic model or only a static load-flow. Accurate voltage level also fixes the short-circuit current threshold that protection relays must be set below.

 

The form’s follow-up questions on fault-level contribution and SCR at the point of connection are only meaningful if the base voltage class is correct. An error here would invalidate both the utility’s protection coordination study and the applicant’s earthing design, potentially delaying energisation by months.

 

By capturing this early, the utility can auto-route the application to the correct planning engineer (LV, MV, or HV), cutting internal queue time. The numeric validation prevents entries such as “11 kV” or “11,000 V” and normalises to “11”, simplifying downstream database queries and cost-allocation models.

 

Question: Will a battery system be installed?

This binary gate controls the visibility of the entire BESS sub-section. Batteries introduce unique hazards—thermal runaway, toxic gas venting, high-voltage DC arcs—that do not exist with PV alone. The permit needs to know this up-front to trigger fire-code reviews, hazardous-gas ventilation calculations, and possibly a separate building permit for the battery enclosure.

 

From a grid-stability perspective, batteries capable of providing synthetic inertia or fast frequency response must be modelled in the utility’s dynamic stability database. If the applicant omits the battery at the permit stage but adds it later, the original grid-impact study becomes invalid, creating a compliance gap and potential network-protection miscoordination.

 

Mandating this question also flags insurance underwriting requirements. Many commercial policies exclude lithium-ion storage unless fire-suppression and vent-plume modelling are pre-approved. Early disclosure prevents mid-project policy renegotiation that can stall financing.

 

Question: Remote monitoring used?

Cyber-security risk scales exponentially once an asset is remotely accessible. This mandatory yes/no triggers the subsequent encryption-method and cloud-provider questions, ensuring that the utility’s cyber-team can classify the asset inside their IEC 62443 security level (SL-1, SL-2, etc.).

 

Remote monitoring also has grid-operational implications. If the battery participates in a Virtual Power Plant (VPP), the operator needs evidence that commands are authenticated and logged for digital accountability. The form’s request for TLS encrypted API or MQTT with certificate pinning captures evidence that best-practice encryption is in place, reducing the probability of a cyber incident that could trip the feeder.

 

Applicants who answer “yes” must later provide SBOM and IDS vendor data, creating a closed-loop evidence chain that supports post-event forensics. This design future-proofs the permit against emerging regulations such as the EU’s NIS2 Directive and the U.S. NERC CIP standards that are being extended to behind-the-meter resources.

 

Question: Single-line diagram (file upload)

The SLD is the master reference for every protection relay setting, arc-flash label, and earthing calculation. Requiring it as a mandatory upload guarantees that reviewers have a common graphical language to understand the proposed topology—DC/AC coupling, earthing method, isolation points, and communication paths.

 

Modern PDF SLDs embedded with clickable layers allow inspectors to toggle between normal and fault conditions, accelerating review time. The form’s enforced upload ensures that the applicant cannot proceed to witness test scheduling without this artefact, eliminating the classic gap where installers energise with hand-drawn sketches that later prove inaccurate.

 

Because the file is stored digitally, the utility can run automated validation scripts (e.g., check that DC isolators are shown on both positive and negative conductors) before human review starts, cutting engineering labour by roughly 30% in pilot programs.

 

User-Experience Observations

Despite its length, the form keeps cognitive load low through progressive disclosure and contextual help paragraphs. Numeric inputs use HTML5 type=number with step and min/max attributes, preventing out-of-range entries on mobile devices. File uploads accept PDF, DWG, and PNG, covering both CAD-based engineering and camera-captured field photos without forcing format conversion.

 

The only notable friction point is the open TCP/UDP ports question under cybersecurity; many applicants will not know this offhand. A tooltip or example string (e.g., “443 HTTPS, 8883 MQTT-TLS, 22 SSH-bastion”) would reduce abandonment. Similarly, the Performance ratio (%) field could auto-calculate from DC capacity and annual yield to serve as a sanity check.

 

Overall, the form balances thoroughness with usability. Mandatory fields are concentrated in early sections, so applicants can save a draft after the business-details screen and return later. The clear visual hierarchy (section headings, collapsible fieldsets) and meta-description optimised for search engines ensure that small-business energy managers can locate the permit quickly when researching “commercial solar permit + battery + grid connection”.

 

Mandatory Question Analysis for Commercial Solar & Battery Storage Permit Form

Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.

Mandatory Field Analysis

Legal business name
Justification: The legal business name is the primary identifier used in the grid-connection agreement, metering account, and all subsequent regulatory correspondence. Any discrepancy here invalidates insurance coverage and warranty transfers, making it indispensable for risk management and digital accountability.

 

Business registration number
Justification: This number enables automatic validation against government company registries, ensuring that only legitimate entities receive permits. It also links the renewable asset to the correct tax identifier for future renewable-energy-certificate (REC) issuance and prevents shell-company fraud.

 

Primary contact full name
Justification: A named individual must be accountable for technical and legal queries throughout the project lifecycle. Regulators and utilities need a single point of contact for safety notices, witness tests, and post-event audits; without a mandatory name, responsibility becomes diffused.

 

Job title
Justification: The job title establishes the authority level of the signatory. Utilities will reject applications signed by unauthorised personnel (e.g., a junior engineer without power-of-attorney), so capturing this field up-front avoids costly re-signing cycles.

 

Email address
Justification: Email is the default channel for sending protection-coordination comments, cyber-security questionnaires, and commissioning schedules. A missing or incorrect address is the leading cause of permit delays, hence the mandatory status.

 

Mobile/cell phone
Justification: Field inspectors and control-room operators need instant contact during installation and fault conditions. A mobile number ensures that critical safety messages (e.g., cease-energisation orders) reach the applicant in real time.

 

Business street address
Justification: The physical address is required for legal-service-of-notice and for calculating local-government rates that may apply to the solar asset. It also determines whether additional state-level permits are triggered.

 

City & Postal/zip code
Justification: These fields feed directly into the utility’s geographic information system (GIS) for feeder capacity analysis and emergency-response planning. Accurate location data prevents overloading of distribution transformers and ensures correct tariff assignment.

 

Installation street address/City/Postal code
Justification: The site address may differ from the business headquarters. Mandatory capture guarantees that the grid-impact study references the correct feeder, fault level, and earthing network, avoiding dangerous misallocations of protection settings.

 

Local grid operator/distributor name
Justification: Each operator has unique technical requirements (e.g., UK G99 vs. AU AS/NZS 4777). Knowing the operator up-front routes the application to the correct engineering team and auto-loads the right validation rules.

 

Grid supply voltage level (kV)
Justification: As discussed in the insight, this single value determines which IEEE/EN standard applies and what short-circuit study is required. Incorrect voltage classification can invalidate the entire grid-connection agreement.

 

Meter point/MPAN
Justification: The MPAN is the unique identifier for the metering point and links the renewable system to the market-settlement system. Without it, the utility cannot create a generation account or allocate export credits.

 

Contracted import & export capacity (kVA)
Justification: These values set the upper bounds for network-charging calculations and protection-relay settings. They are also used to assess whether the local transformer needs upgrading, making them critical for cost-quote accuracy.

 

Total PV module quantity/Installed capacity DC (kWp) / Inverter capacity AC (kW)
Justification: These three fields are the minimum data set required to calculate the array’s load ratio, estimate fault-level contribution, and verify inverter loading limits per IEC 61724. Without them, the utility cannot perform a valid grid-impact study.

 

Will a battery system be installed?
Justification: This yes/no gate controls safety reviews (fire code, gas venting) and grid-stability modelling (synthetic inertia, frequency response). Omitting it would allow hidden battery additions that invalidate the original protection-coordination study.

 

Battery capacity (kWh) & Battery power (kW)
Justification: These values determine the battery’s potential fault current and the required fire-suppression agent quantities. They are also used to assess whether the unit qualifies for certain market services (e.g., FCAS in Australia), making them essential for revenue forecasting.

 

Remote monitoring used?
Justification: Remote access introduces cyber-risk that must be classified and mitigated before connection approval. Mandatory disclosure ensures the utility’s cyber-team can apply the correct IEC 62443 security level and audit controls.

 

Grid operator connection point ID/Feeder/circuit name
Justification: These identifiers are required by the utility’s outage-management and planning systems. Without them, the application cannot be mapped to the correct feeder for hosting-capacity analysis or construction scheduling.

 

Single-line diagram/Site plan/Roof layout/DC string calculations/Earthing plan (file uploads)
Justification: These drawings are the minimum technical artefacts required for protection-coordination, arc-flash, and earthing-compliance reviews. Missing any one of them would force the utility to suspend assessment and request resubmission, delaying energisation.

 

Expected start & completion dates
Justification: The utility uses these dates to sequence construction outages and allocate inspection resources. Accurate scheduling prevents double-booking of crews and ensures witness tests align with commissioning windows.

 

EPC/installer company name & Installer licence number
Justification: Only licensed installers can legally connect generation to the network in most jurisdictions. Capturing the licence number up-front enables automatic verification against regulator databases and prevents unqualified contractors from starting work.

 

Mandatory declaration checkboxes & Signatory details
Justification: These fields create a legally binding attestation that the technical data is accurate and that the applicant will notify the authority of material changes. Without them, the permit would lack enforceability and digital accountability.

 

Strategic Recommendations on Mandatory Field Strategy

The current mandatory set is well-calibrated for safety-critical and legally required data, but the form could benefit from conditional mandatoriness. For example, Maximum building height should become mandatory only when the proposed system exceeds 50 kW and is ground-mounted, as height then affects aviation-obstacle lighting calculations. Similarly, Heritage listing follow-up documents should be required only if the site is within a conservation zone, reducing upload burden for urban rooftops.

 

To maximise completion rates while preserving data quality, consider moving non-critical but useful fields (e.g., Performance ratio, Local labour %) into an optional supplementary section that can be completed after initial submission. Provide a progress bar that explicitly shows “70% complete—remaining fields optional” to manage user expectations. Finally, implement inline validation warnings rather than hard stops: instead of blocking submission when cloud provider region is blank, flag the omission with a yellow alert that can be resolved post-approval but pre-energisation. This hybrid approach maintains rigorous safety and grid-stability standards without creating unnecessary friction for small-business applicants who may lack immediate access to every technical detail.

 

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.