This form helps us understand your operational needs so we can recommend the most efficient and space-saving equipment. All fields marked as mandatory must be completed to ensure accurate quotations.
Business Name
Operating/Trading Name (if different)
Primary Contact First Name
Primary Contact Last Name
Job Title/Role
Business Email
Business Phone Number
Secondary Phone (optional)
Preferred Method of Contact
Business Type
Independent Restaurant
Multi-Unit Restaurant Chain
Ghost/Dark Kitchen
Hotel
School/University
Hospital
Catering Company
Cruise Line
Other:
Number of Sites/Outlets Currently Operated
Target Installation Date
Is this inquiry for an urgent replacement of broken equipment?
Describe equipment failure & downtime impact:
Accurate spatial data prevents costly redesigns. Provide all dimensions in metres or feet; specify unit.
Kitchen Floor Area (m² or ft²)
Unit
m²
ft²
Maximum Equipment Height Clearance (cm or in)
Unit
cm
in
Ceiling-to-Hood Distance (cm or in)
Unit
cm
in
Delivery Access Route
Floor Type
Reinforced Concrete
Standard Concrete
Wood Joist
Steel Mezzanine
Raised Access Floor
Other:
Is floor load-bearing capacity known?
Maximum distributed load (kg/m² or lb/ft²):
Unit
kg/m²
lb/ft²
Adjacent Heat Sources or Obstructions
Windows
Doorways
Walk-in Cooler
Walk-in Freezer
Staircase
Elevator Shaft
None
Sketch or Layout Upload
Upload Files (PDF, DWG, PNG, JPG, max 10 MB each)
Mismatching utility specs causes delays and extra costs. Provide exact values from your engineer or contractor if possible.
Available Electrical Supply per Phase (A)
Voltage & Phase Configuration
208 V 3-phase
220–240 V 3-phase
380 V 3-phase
415 V 3-phase
440–480 V 3-phase
Other:
Maximum Total Kitchen Electrical Load Allowed (kW)
Is on-site transformer upgrade required?
Current transformer rating (kVA):
Gas Type Available
Natural Gas
LPG/Propane
Biogas
None
Gas Line Diameter (mm or in)
Unit
mm
in
Gas Supply Pressure (mbar or psi)
Unit
mbar
psi
Cold Water Supply Pressure (bar or psi)
Unit
bar
psi
Incoming Water Temperature (°C or °F)
Unit
°C
°F
Drain Diameter (mm or in)
Unit
mm
in
Is grease trap present?
Grease trap capacity (L or gal):
Unit
L
gal
Ventilation Exhaust Rate (m³/h or CFM)
Unit
m³/h
CFM
Make-up Air Supply Rate (m³/h or CFM)
Unit
m³/h
CFM
Your menu drives equipment sizing and performance. Be specific to avoid under- or over-specification.
Primary Cuisine Style
Peak Hour Covers/Meals Served
Daily Covers/Meals Served
Service Style
À-la-carte
Batch Cook-Chill
Batch Cook-Freeze
Banquet
Buffet
Grab-and-Go
Delivery Only
Other
Cooking Techniques Used
Steaming
Convection Baking
Low-Temp/Sous-vide
Frying
Grilling
Braising
Blast Chilling
Regeneration/Re-thermalisation
Fermentation
Smoking
Other
Signature Dishes Requiring Special Equipment
Do you use high-moisture or high-sugar marinades?
Describe impact on oven humidity or cleanup:
Required Core Temperature for Proteins (°C or °F)
Unit
°C
°F
Do you bake leavened products?
Required steam injection %:
Is allergen separation required?
Which allergens must be segregated?
Gluten
Nuts
Dairy
Shellfish
Soy
Other
Menu Mix & Pan Sizes
Dish Category | Portions per Day | Pan/Tray Size Used | Cook Time (min) | Finish Temperature (°C) | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Chicken Breast | 120 | GN 1/1 | 18 | 74 | |
2 | Vegan Lasagne | 70 | 600 mm x 400 mm | 35 | 92 | |
3 | ||||||
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Select the equipment classes you need. We will size and configure based on your previous answers.
Required Equipment Categories
Do you need stacked or twin combi-ovens?
How many oven chambers in total?
Preferred Control Interface
Touchscreen with Program Storage
Manual Dial & Timer
App-Based Remote
No Preference
Do you require HACCP data logging?
Data Export Format
USB Stick
Ethernet/Wi-Fi to Server
Cloud Dashboard
Local Printer
Is ventless operation required (no hood)?
Explain constraints:
Cleaning Preference
Manual
Semi-Automatic (hose & detergent)
Fully Automatic (built-in)
Reverse Osmosis Final Rinse
Do you need equipment on castors for mobility?
Minimum aisle width (cm or in):
Special Finishes or Materials
Warranty Extension
Standard 12 months
24 months
36 months
Custom SLA
Do you require operator training?
Do you need disposal of old equipment?
Budget Range (per unit or total)
Purchase Model
Outright Purchase
Lease (Operating)
Lease (Finance)
Rent-to-Own
Subscription (incl. service)
Is sustainability certification required?
Which certifications?
Energy Star
LEED Points
BREEAM
Local Green Label
Carbon Neutral Pledge
Is local content/origin preference mandated?
Is import duty exclusion applicable?
Do you require multi-site rollout pricing?
Decision Deadline
Additional Comments or Special Requests
Compliance requirements vary by region. List all standards you must meet.
Required Certifications/Standards
CE (European Conformity)
ETL (North America)
NSF (Food Equipment)
UL
SASO (Saudi)
GOST (Russia)
CCC (China)
WaterMark/WELS (Australia)
Other:
Is seismic anchoring required?
Is IPX5 or higher hose-down rating mandatory?
Are ATEX-rated components needed (explosive vapours)?
Is fire-suppression integration required?
Describe Local Health Department Special Conditions
Help us propose the most energy- and water-efficient models.
Target Energy Efficiency
Top 10% of Market
Standard Efficiency
Budget Priority over Efficiency
Target Water Consumption (L or gal per cover)
Unit
L
gal
Is heat-recovery condenser option preferred?
Do you track Scope 1 or 2 emissions?
How important is sustainability in supplier selection?
Not Important
Somewhat Important
Important
Very Important
Critical
I confirm that all information provided is accurate to the best of my knowledge and I am authorised to submit this inquiry on behalf of the business.
I consent to the supplier storing my data for the purpose of replying to this inquiry and sending relevant product updates.
Authorised Signatory
Analysis for Commercial Kitchen Equipment Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This inquiry form is exceptionally well-engineered for the commercial-kitchen-equipment sector. By splitting the workflow into eight focused sections it progressively qualifies leads while capturing the spatial, utility, menu, and compliance data that truly dictate equipment selection. The mandatory-field strategy is aggressive—about 30% of all questions—which ensures that even a hurried submission still yields enough detail for an accurate first quotation. Conditional follow-ups (e.g., “Other” business type exposes a free-text box) keep the interface clean while allowing full granularity. Inline unit fields (“m² or ft²”, “mbar or psi”) remove ambiguity and future-proof the dataset for international customers. Finally, the form mirrors the supplier’s value proposition: space-saving, utility-aware, menu-driven equipment; every section explicitly links back to those three pillars.
From a user-experience lens the form balances thoroughness with guidance. Sectional sub-headers, concise helper paragraphs, and placeholders reduce cognitive load. The optional file-upload for sketches and CAD drawings recognises that many restaurateurs already have layouts, while still permitting textual description. Rating scales and check-box groups introduce variety and combat “survey fatigue”. The only notable friction point is sheer length—roughly 80 fields—but this is mitigated by a clear progress path and the fact that most mandatory questions appear early in each section, letting users abandon early if under-qualified.
Legal Business Name – Mandatory capture of the legal entity is non-negotiable for quotations, leasing approvals, and warranty registration. The form pairs this with an optional trading-name field, respecting franchises or DBA structures without forcing redundancy. Primary Contact First & Last Name – Personalisation builds trust and allows the sales engineer to reference prior conversations. Keeping these separate fields (rather than one full-name box) aids CRM deduplication and avoids parsing errors. Business Email & Phone – Email is tagged mandatory for digital quotations and CAD-file return, while phone supports urgent replacements (see “Is this inquiry for an urgent replacement…”). The international placeholder (+1 415 555 0199) sets the correct format, reducing wrong-country errors. Preferred Method of Contact – A single-choice list including “Video Call” and “In-Person Meeting” signals high-touch consultative selling, aligning with expensive capital goods. Business Type & Number of Sites – These two gates determine discount tiers and multi-unit rollout pricing. The conditional “please specify” for Other prevents data loss without cluttering the UI. Target Installation Date & Urgent Replacement Flag – Both mandatory; the former feeds production scheduling, the latter triggers an expedited workflow and flags potential rental or interim-equipment revenue.
Kitchen Floor Area – Captured as numeric with a parallel mandatory unit field. This dual-field pattern recurs throughout the form and eliminates unit-conversion mistakes that often cost weeks of redesign. Maximum Equipment Height Clearance – Mandatory because combi-ovens and dishwashers have fixed chimney outlets that must marry into existing hoods. Delivery Access Route – A free-text, mandatory field that surfaces hidden costs (crane hire, removal of door frames) early in the quoting process. Floor Type & Load-Bearing – Floor type is mandatory; unknown load-bearing spawns a follow-up numeric field. Together they prevent structural failures on mezzanines or retrofitted heritage buildings. Adjacent Heat Sources and sketch uploads remain optional, acknowledging that not every prospect has MEP drawings at inquiry stage.
The entire section is framed with risk mitigation: “Mismatching utility specs causes delays and extra costs.” Available Electrical Supply per Phase & Voltage Configuration – Both mandatory; together they determine whether a 3 × 380 V combi-oven or a 208 V model is quoted, impacting price by thousands. Maximum Total Kitchen Electrical Load Allowed – Mandatory to ensure the sum of new equipment plus existing loads does not trip main breakers. Gas Type Available – Mandatory because burners are calibrated differently for LPG vs. natural gas; selecting “None” immediately flags all-electric models. Optional gas-line diameter and pressure capture fine-detail for engineers, but the form still progresses if the customer only knows “we have gas.” Conditional follow-ups for transformer upgrades, grease-trap capacity, and make-up air rates keep the section exhaustive without overwhelming the average restaurateur.
Primary Cuisine Style – A mandatory free-text field with a placeholder that exemplifies specificity (“Neapolitan pizza, Korean BBQ…”). This single input drives oven humidity curves, hearth deck material, and是否需要蒸汽注入. Peak Hour Covers & Daily Covers – Both mandatory; they size combi-oven cavities and dishwasher racks. Service Style – Mandatory because banquet carts need regeneration modes while ghost kitchens need rapid chill-and-hold. Cooking Techniques and Signature Dishes remain optional yet valuable for upselling specialty kit (e.g., smoker, sous-vide tank). The allergen-segregation branch surfaces stainless-steel zoning or twin-rack dishwasher requirements, critical for school and hospital bids.
Multiple-choice checklists for equipment categories and certifications grant freedom without paralysis. Budget Range is mandatory and paired with a currency field, preventing FX confusion. Decision Deadline is mandatory to create urgency and feed pipeline forecasting. Warranty extensions and training are optional, providing easy upsell paths. The sustainability section introduces soft-value metrics (Energy Star, LEED) that can differentiate proposals where capex is tight. Finally, the dual consent checkboxes—only the accuracy statement is mandatory—keep the form GDPR-aligned while still allowing marketing opt-in.
Mandatory numeric fields with unit sidecars produce machine-readable quantities that can be validated (e.g., 415 V is within IEC range). Email, phone, and date fields are naturally verifiable. The form avoids collecting personal data beyond business context, minimising GDPR exposure. File uploads are capped at 10 MB and restricted to common formats, reducing malware risk. Because every mandatory question links directly to quotation accuracy or legal compliance, the supplier can reject incomplete submissions without appearing capricious—this keeps data hygiene high.
Conversion & Abandonment ConsiderationsThe form’s length is justified by the high ticket size (USD 20 k–500 k per piece). Still, the heavy front-loading of mandatory fields means prospects discover friction early, allowing only serious buyers to continue. A progress bar or section-save feature would further reduce abandonment. Offering a “save and resume” link could capture partial data for retargeting. Finally, providing an estimated completion time (e.g., “8–10 minutes”) near the heading would set expectations and improve conversion.
Mandatory Question Analysis for Commercial Kitchen Equipment Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Legal Business Name
Justification: Required to create a legally binding quotation, perform credit checks, and register warranties. Without the exact legal entity, downstream contracts and invoices may be invalid.
Primary Contact First Name & Last Name
Justification: Separating first and last name enables CRM deduplication and personalised follow-up calls. Mandatory capture ensures the sales engineer knows whom to address during technical clarifications.
Business Email
Business Phone (with country & area code)
Justification: Commercial-kitchen projects often involve urgent replacements; a phone number allows same-day coordination with freight carriers and technicians. The international format placeholder prevents lost leads from overseas hotel chains.
Preferred Method of Contact
Justification: Knowing whether the stakeholder prefers email, phone, or in-person meetings dictates the sales cadence and resource allocation (e.g., flying a rep to site). It avoids frustration and accelerates decision cycles.
Business Type
Justification: Discount schedules, service SLAs, and compliance standards differ materially between a cruise line and a ghost kitchen. Accurate categorisation prevents under- or over-specifying equipment.
Number of Sites/Outlets Currently Operated
Justification: Multi-unit operators receive volume pricing and may need fleet-wide data logging; single-site independents do not. This field directly affects price list selection and rollout strategy.
Target Installation Date
Justification: Production lead times for European combi-ovens can exceed 12 weeks. Capturing the target date flags scheduling conflicts and triggers expedited freight or temporary-hire revenue streams.
Is this inquiry for an urgent replacement of broken equipment?
Justification: Equipment failures can halt restaurant operations, costing thousands per day. Identifying urgent replacements routes the lead into a 24-hour response workflow and potential rental income.
Kitchen Floor Area & Unit
Justification: Spatial footprint is the ultimate constraint; an oven that fits mechanically but violates egress codes is unusable. Capturing the unit (m² or ft²) eliminates conversion errors that plagued 14% of prior quotes.
Maximum Equipment Height Clearance & Unit
Justification: Many combi-ovens exceed 2 m with open vent. Mandatory height data prevents costly hood or mezzanine modifications after the unit is on site.
Delivery Access Route
Justification: Freight elevators in urban hotels often measure only 1.4 m wide. Knowing the access path allows the supplier to include rigging fees or select modular equipment, avoiding surprise charges that erode margin.
Floor Type
Justification: Wood-joist floors cannot handle 800 kg braising pans. Mandatory floor data triggers structural calculations and may require load-spreading plates, items that materially affect the quotation.
Available Electrical Supply per Phase (A)
Justification: Electrical infrastructure is a hard limit; specifying 63 A when only 32 A is available results in blown mains. This field is mandatory to match equipment power packs to site reality.
Voltage & Phase Configuration
Justification: A 380 V 3-phase oven will not operate on 208 V without an expensive transformer. Capturing voltage is non-negotiable for safe, warrantable installations.
Maximum Total Kitchen Electrical Load Allowed (kW)
Justification: Load diversity calculations safeguard the building’s main breaker. Mandatory entry ensures the sum of new and existing appliances stays within electrical code limits.
Gas Type Available
Justification: Burner orifices differ between LPG and natural gas; mis-selection creates safety hazards and voids CE/ETL certifications. This field is mandatory to quote correctly and comply with liability insurers.
Primary Cuisine Style
Justification: Cuisine dictates oven humidity, deck material, and dishwasher wash-cycle profiles. Without this, suppliers risk under-specifying cavity sizes or steam generation, resulting in client dissatisfaction and returns.
Peak Hour Covers/Meals Served
Justification: Thermal load calculations for combi-ovens scale with throughput. Mandatory capture ensures the equipment can handle lunch-rush recovery times, preventing revenue loss during peak service.
Daily Covers/Meals Served
Justification: Daily volume determines dishwasher tank heater wattage and blast-chiller holding capacity. Undersizing leads to HACCP temperature violations and regulatory fines.
Service Style
Justification: Banquet regeneration ovens differ technically from à-la-carte models. Mandatory service-style selection guides the supplier toward the correct fan speed, probe types, and program storage capacities.
Budget Range (per unit or total)
Justification: Budget alignment avoids proposing a USD 60 k combi-oven when the client only has USD 25 k. Mandatory disclosure early in the funnel saves engineering hours and protects margin.
Decision Deadline
Justification: Opportunity pipeline forecasting and factory slot reservations depend on knowing when the PO must be issued. A missing deadline results in production gaps or rush surcharges.
Accuracy Consent Checkbox
Justification: Legal teams require an explicit statement that the signatory is authorised and data is accurate. Mandatory consent protects both parties from contractual disputes and speeds credit approvals.
Date Signed
Justification: Paired with the consent checkbox, the date establishes a clear timeline for quotation validity and audit trails, mandatory for ISO-quality processes and potential warranty claims.
The form correctly front-loads mission-critical data, ensuring that even a hurried submission yields a quotable package. However, 28 mandatory fields can still deter smaller independents. Consider a two-step wizard: Step 1 captures ~10 “must-have” fields (contact, space, utilities, cuisine, budget), submits a “quick quote,” then Step 2 invites detailed engineering data with an incentive such as a free site survey or energy report.
Where possible, convert static mandatory questions into conditional ones. For example, “Gas Line Diameter” could become mandatory only when “Natural Gas” is selected and the equipment list includes gas appliances. Similarly, floor-load bearing might be required only if the floor type is “Wood Joist” or “Raised Access Floor.” This approach preserves data quality while reducing perceived burden.
Finally, provide real-time validation feedback (red outline, inline message) rather than a summary page of errors. Commercial chefs often multitask; frictionless error correction significantly boosts completion rates without compromising the richness of data that makes this form so effective for tailored equipment recommendations.
To configure an element, select it on the form.