Comprehensive System Transition Form for Post-Quantum Cryptography Migration

1. Section 1: System Identifier & Sensitive Data Asset Scope

This section identifies the system undergoing migration and catalogs the sensitive data assets it protects. Complete all fields to ensure proper risk assessment and resource allocation.

 

System Name

System Unique Identifier

System Version

System Owner Full Name

System Owner Email

IT Lead Full Name

IT Lead Email

Primary Deployment Environment

 

Private Cloud Platform Provider

 

Public Cloud Service Provider

 

Describe Hybrid Architecture Components

 

Describe Edge Deployment Topology

Geographic Distribution of System Infrastructure

System Criticality Level (1=Low, 5=Critical)

 

Detail the sensitive data assets protected by this system's cryptographic mechanisms. Accurate data classification is essential for determining migration priority and resource allocation.

 

Sensitive Data Types Handled by System

 

Estimated Number of PII Records

 

Maximum Financial Transaction Value Processed

 

Describe Health Data Regulatory Requirements

 

Describe IP Classification and Protection Requirements

 

Government Classification Level

 

Describe Other Sensitive Data Types

Total Data Volume Protected (Terabytes)

Number of Active Data Records (Millions)

Highest Data Classification Level

Applicable Generic Regulatory Frameworks

 

Specify Industry Standard

Maximum Data Retention Period

Retention Period Unit

Number of Directly Interconnected Systems

List All Interconnected Systems and Integration Types

Does System Have External API Dependencies?

 

List External APIs and Their Cryptographic Requirements

Are Third-Party Data Processors Involved?

 

List Third-Party Processors and Data Processing Agreements

Are There Data Residency Requirements?

 

Specify Residency Requirements by Geographic Region

Does System Perform Cross-Border Data Transfers?

 

Describe Cross-Border Transfer Mechanisms and Safeguards

Business Criticality Justification for Priority Migration

2. Section 2: Current Cryptographic Stack vs. Target PQC Standard

Document your current cryptographic implementations and specify the target post-quantum cryptographic standards. Provide detailed technical specifications for both current and future states.

 

Current TLS/SSL Version in Production

 

WARNING: TLS 1.1 and below are deprecated. Immediate upgrade required before PQC migration.

 

CRITICAL: TLS 1.0 is obsolete. Must upgrade to TLS 1.2 minimum before PQC migration.

 

CRITICAL: SSL 3.0 has severe vulnerabilities. Immediate remediation required.

Current Certificate Authority Provider

Current Certificate Expiry Date

Current Asymmetric Cryptographic Algorithms in Use

Current RSA Key Size (bits)

Current ECC Key Size (bits)

Current Symmetric Encryption Algorithms

Current Hash Functions

Current Key Exchange Mechanisms

Primary Cryptographic Libraries Used

 

Describe Custom Cryptographic Library Implementation

Is System FIPS 140-2 or FIPS 140-3 Compliant?

Does System Utilize Hardware Security Modules (HSMs)?

 

List HSM Models, Firmware Versions, and PQC Compatibility Status

 

Specify your target post-quantum cryptographic standards based on NIST PQC competition results and organizational security requirements.

 

Target PQC Standard Maturity Level

Selected PQC Key Encapsulation Mechanism (KEM)

Selected PQC Digital Signature Algorithm

Will System Implement Hybrid Cryptographic Approach?

 

Describe Hybrid Implementation Strategy (e.g., TLS with both ECDHE and Kyber)

 

NOTE: Pure PQC implementation may have compatibility issues. Consider hybrid approach for transitional period.

Target TLS Version Supporting PQC

Target PQC-Enabled Cryptographic Library

Expected Certificate Chain Size Increase (%)

Cryptographic Operation Performance Comparison

Operation Type

Current Latency (ms)

Projected PQC Latency (ms)

Overhead Factor

A
B
C
D
1
Key Generation
5
50
10
2
Signature Generation
1
5
5
3
Signature Verification
0.5
2
4
4
Handshake Completion
20
80
4
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

PQC Implementation Strategy

Will System Support Parallel Cryptographic Operations?

 

Parallel Operation Duration (days)

Are Cryptographic Agility Mechanisms Implemented?

 

Describe Agility Mechanisms for Future Algorithm Updates

3. Section 3: Migration Latency & Compute Performance Impact Data

Quantify the performance impact of migrating to quantum-resistant algorithms. Provide baseline measurements and projected impacts on latency, computational overhead, and network bandwidth.

 

Baseline TLS Handshake Latency (milliseconds)

Projected PQC Handshake Latency (milliseconds)

Latency Increase Percentage (%)

Baseline CPU Utilization for Crypto Operations (%)

Projected CPU Utilization Post-Migration (%)

CPU Overhead Increase (percentage points)

Baseline Memory Footprint for Crypto Operations (MB)

Projected Memory Footprint (MB)

Memory Increase Percentage (%)

Baseline Asymmetric Key Generation Time (ms)

Projected PQC Key Generation Time (ms)

Key Generation Overhead Factor

Baseline Digital Signature Generation Time (ms)

Projected Signature Generation Time (ms)

Baseline Signature Verification Time (ms)

Projected Signature Verification Time (ms)

Network Bandwidth Overhead Increase (%)

Migration Phase Timeline and Downtime Estimates

Phase Name

Planned Start Date

Planned End Date

Estimated Downtime (hours)

Risk Score (1-10)

A
B
C
D
E
1
Assessment & Planning
1/15/2025
2/15/2025
0
2
2
Development Environment Migration
3/1/2025
3/31/2025
4
5
3
Staging Environment Migration
4/1/2025
4/30/2025
8
6
4
Production Migration
5/1/2025
5/31/2025
12
8
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Total Estimated Migration Duration (days)

Aggregate Planned Downtime (hours)

Estimated Rollback Time (minutes)

Parallel Run Duration (days)

Performance Testing Duration (days)

Is Load Testing Required Before Production Deployment?

 

Describe Load Testing Scenarios and Acceptance Criteria

Performance Acceptance Criteria for Migration Success

4. Section 4: Fallback Protocols & Key Management Plan

Define comprehensive fallback procedures and key management strategies to ensure operational continuity and cryptographic key lifecycle governance during and after migration.

 

Primary Fallback Strategy if PQC Migration Fails

Automated Rollback Triggers

Is Manual Rollback Authorization Required?

 

Specify Authorization Chain and Emergency Contact Procedures

Is Key Escrow Mechanism Implemented?

 

Describe Key Escrow Provider and Access Controls

PQC Key Rotation Frequency

Is Formal Key Generation Ceremony Required?

 

Describe Ceremony Participants, Procedures, and Witness Requirements

Primary Key Storage Solution

HSM Vendor and Model (if applicable)

Cloud KMS Provider Name (if applicable)

Key Distribution Mechanism Description

Are Zeroization Procedures Documented?

 

Summarize Zeroization Procedures for Legacy Keys

 

CRITICAL: Zeroization procedures must be documented before migration.

Are Legacy Cryptographic Keys Backed Up Before Migration?

 

Describe Backup Location, Encryption, and Access Controls

Disaster Recovery Test Frequency (months)

Is Key Compromise Response Plan Documented?

 

Summarize Key Compromise Detection and Response Procedures

Number of Key Custodians for PQC Master Keys

Shamir Secret Sharing Threshold (M of N)

Key Management Personnel and Responsibilities

Role

Name

Email

Training Completed

Last Certification Date

A
B
C
D
E
1
Key Custodian
John Doe
john.doe@company.com
Yes
10/1/2024
2
Backup Custodian
Jane Smith
jane.smith@company.com
Yes
9/15/2024
3
 
 
 
 
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Is Cross-Training Completed for All Key Custodians?

Documentation Repository URL

5. Section 5: Cryptographic Review Board Approval

Obtain formal approval from the Cryptographic Review Board. Provide evidence of risk assessment, security testing, and compliance verification to support the migration decision.

 

Form Submission Date to Review Board

Primary Reviewer Name

Primary Reviewer Email

Cryptographic Review Board Members

Is Formal Risk Assessment Completed?

 

Summarize Key Risks Identified and Mitigation Strategies

 

CRITICAL: Risk assessment must be completed before board approval.

Overall Migration Risk Level

Is Independent Security Audit Completed?

 

Upload Security Audit Report

Choose a file or drop it here
 
 

Security audit must be scheduled before production migration.

Is Penetration Testing Completed on PQC Implementation?

 

Upload Penetration Test Report

Choose a file or drop it here
 
 

Penetration testing is mandatory for High and Critical risk systems.

Is Compliance Verification Completed?

Compliance Frameworks Verified

Is Complete Technical Documentation Submitted?

 

Upload Technical Design Document

Choose a file or drop it here
 
 

Complete technical documentation is required for board review.

Is Implementation Timeline Approved by All Stakeholders?

Post-Implementation Review Scheduled Date

Cryptographic Review Board Approval Status

 

List All Approval Conditions and Remediation Requirements

 

Document Rejection Reasons and Required Revisions

IT Lead Digital Signature

Chief Information Security Officer (CISO) Digital Signature

Chief Technology Officer (CTO) Digital Signature

Final Board Approval Date

Authorized Production Go-Live Date

Post-Implementation Monitoring Period (days)

To configure an element, select it on the form.

To add a new question or element, click the Question & Element button in the vertical toolbar on the left.