Operational Authorization for RCS Valve Preventive Maintenance

1. Section 1: Plant Unit & Primary Loop Valve Identifiers

Provide complete identification of the plant unit and all reactor coolant system valves subject to preventive maintenance. Ensure all tag numbers and technical specifications are accurately recorded.

 

Nuclear Facility Identifier Code

Reactor Unit Number

Reactor Coolant System Configuration

Primary Loop Identifier

Valve Tag Numbers (list all valves requiring maintenance)

Detailed Valve Specifications

Valve Tag Number

Valve Type

Nominal Size (inches)

Pressure Class

Manufacturer

Safety Class (Seismic Category)

A
B
C
D
E
F
1
RC-MOV-101A
Motor-Operated Gate
12
Class 1500
Velan
Safety Class 1
2
RC-MOV-101B
Motor-Operated Gate
12
Class 1500
Velan
Safety Class 1
3
 
 
 
 
 
 
4
 
 
 
 
 
 
5
 
 
 
 
 
 
6
 
 
 
 
 
 
7
 
 
 
 
 
 
8
 
 
 
 
 
 
9
 
 
 
 
 
 
10
 
 
 
 
 
 

Work Order Number

Scheduled Maintenance Start Date/Time

Scheduled Maintenance Completion Date/Time

Maintenance Type Classification

Last Maintenance Date

Does this maintenance require containment vessel access?

 

Select all containment access pathways required:

 

Confirm that all work will be performed outside radiological controlled areas or in low-dose zones only.

Upload valve location diagram and system isometric drawing

Choose a file or drop it here
 

2. Section 2: Radiation Dosage & Personal Protective Equipment (PPE) Clearance

Complete radiological work permit prerequisites and verify personal protective equipment readiness. All dosage readings must be current and within administrative limits.

 

Primary Technician Name

Primary Technician ID Number

Current Dosimeter Reading (mSv)

Projected Total Dose for This Task (mSv)

Remaining Dose Allocation Until Next Monitoring Period (mSv)

Has ALARA review been completed and documented?

 

ALARA Review Document Reference Number

 

STOP WORK - ALARA review must be completed before proceeding. Contact Radiation Protection Department immediately.

PPE Inspection and Readiness Verification

Not Applicable

Failed Inspection

Marginal Condition

Acceptable

Optimal Condition

Disposable coveralls (Tyvek or equivalent) inspected and defect-free

Double-layer gloves (inner and outer) properly sized

Safety boots with contamination covers

Full-face respirator or SCBA unit tested and functional

Hearing protection rated for industrial noise

Safety harness and lanyard for elevated work

Portable dosimeter and alarm setpoints verified

Respiratory Protection Equipment Required

Has fit test been completed for required respirator within the last 12 months?

 

CRITICAL DEFICIENCY - Fit test must be current. Work cannot proceed without valid fit test certification.

Maximum Expected Dose Rate at Work Location (mSv/hr)

Will continuous air monitoring be required during maintenance?

 

Continuous Air Monitor (CAM) Unit Serial Number

Select all required supplementary protective equipment:

Describe any radiological hazards or contamination concerns specific to this valve maintenance

Upload radiological survey map and RP briefing checklist

Choose a file or drop it here
 

3. Section 3: System Isolation, Depressurization & LOTO Checklist

CRITICAL SAFETY SECTION - Verify each isolation and depressurization step before proceeding. Any 'No' response requires immediate stop-work evaluation and corrective action. All verifications must be independently confirmed by a second qualified individual.

 

1.0 - System one-line diagram reviewed and isolation boundaries marked?

 

Describe corrective action required before proceeding

2.0 - All upstream and downstream isolation valves closed, locked, and tagged?

 

Identify which isolation valves are not secured and explain

3.0 - Motor-operated valve power supplies disconnected and LOTO applied at MCC?

 

Specify which MOVs remain energized and justification

4.0 - Pneumatic/hydraulic actuator supplies isolated and bled down?

 

Detail which actuators remain pressurized and controls in place

5.0 - System pressure verified at zero psig on at least two independent gauges?

 

Record actual pressure readings and gauge locations

6.0 - All system drain valves opened and verified flowing to waste collection?

 

Identify blocked drains and alternative depressurization path

7.0 - Temperature verified below 120°F (49°C) before breaking containment?

 

Record actual system temperature (°F)

8.0 - Blind flanges installed at all identified break points?

 

Specify which break points lack blind flanges and protective measures

9.0 - Containment isolation valves verified closed on both primary and backup systems?

 

Describe isolation deficiency and compensatory measures

10.0 - LOTO verification walkdown completed by independent verifier?

 

STOP WORK - Independent verification is mandatory. Contact Shift Manager and Safety Engineer before proceeding.

List all LOTO tag numbers and corresponding equipment isolated

Isolation Valve Status Verification

Valve Tag Number

Closed & Secured

LOTO Applied

LOTO Tag Number

Verifier Initials

Verification Timestamp

A
B
C
D
E
F
1
RC-ISO-101
LOTO-2847
JS
6/30/2025, 6:00 AM
2
RC-ISO-102
LOTO-2848
JS
6/30/2025, 6:05 AM
3
 
 
 
 
4
 
 
 
 
5
 
 
 
 
6
 
 
 
 
7
 
 
 
 
8
 
 
 
 
9
 
 
 
 
10
 
 
 
 

Primary Isolation Technician Signature

Independent Verifier Signature

Upload marked-up system one-line diagram showing isolation boundaries

Choose a file or drop it here
 

4. Section 4: Post-Maintenance Hydrostatic Testing Sequence

Execute hydrostatic testing in accordance with ASME Section XI or equivalent code requirements. Record all test parameters and witness all hold periods. Any deviation from specified test pressure or leakage criteria requires immediate stop-work and engineering evaluation.

 

Test Pressure (psig)

Test Pressure Tolerance (+/- psig)

Required Pressure Hold Duration (minutes)

Maximum Allowable Pressure Drop During Hold (psi)

Has test gauge been calibrated within the last 90 days?

 

Calibration Due Date

 

CRITICAL - Uncalibrated gauges invalidate test results. Replace with calibrated gauge before proceeding.

Test Medium

Test Medium Temperature (°F)

Is test medium temperature within 30°F of ambient temperature?

 

CAUTION - Temperature differential may affect pressure readings. Allow thermal equilibrium or apply temperature correction factor.

Hydrostatic Test Data Log

Time

Pressure Reading (psig)

Temperature (°F)

Visual Leak Observed

Technician Observations

A
B
C
D
E
1
6/30/2025, 2:00 PM
500
72
 
Initial pressurization - no leaks
2
6/30/2025, 2:15 PM
2485
73
 
Reached test pressure - stable
3
6/30/2025, 2:45 PM
2480
73
 
End of hold period - pressure drop 5 psi acceptable
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

Was pressure drop within acceptable limits?

 

Document pressure drop value and initiate condition report for engineering evaluation

Were any leaks observed during hold period?

 

Describe leak location, size, and probable cause. Initiate corrective action request.

Was post-test drain and dry-out procedure completed?

 

Explain why drain/dry-out was not completed and document compensatory measures

Select all test phases successfully completed:

Summary of test results and any anomalies observed

Upload test pressure chart recording and photographic evidence

Choose a file or drop it here
 

5. Section 5: Chief Nuclear Officer & Radiation Safety Officer Sign-Off

FINAL AUTHORIZATION - This section must be completed by authorized signatories only. All preceding sections must be fully documented and any deficiencies resolved before requesting final approval. This authorization permits system restoration and return to normal operations.

 

Have all sections of this form been completed in full?

 

INCOMPLETE FORM - Return to originating technician to complete all mandatory fields before submittal for sign-off.

Were any stop-work conditions identified during maintenance execution?

 

Summarize stop-work issues, corrective actions taken, and final resolution status

Documentation Quality and Completeness Review

Unacceptable

Minor Deficiencies

Acceptable with Notes

Fully Compliant

Exceeds Standards

Section 1 valve identification data accurate and complete

Section 2 radiological controls properly established

Section 3 isolation and LOTO verifications documented

Section 4 hydrostatic test results within acceptance criteria

Photographic evidence supports maintenance activities

All anomalies properly documented with condition reports

Is system ready for return to service?

 

Specify remaining work items or restrictions preventing system restoration

Operational Readiness Status

Special conditions, restrictions, or limitations for system operation post-maintenance

Final Authorization Signatures

Signatory Role

Printed Name

Authorization Number

Signature Date/Time

Digital Signature

A
B
C
D
E
1
Maintenance Supervisor
Robert Chen
AUTH-MS-4521
6/30/2025, 4:00 PM
 
2
Radiation Safety Officer
Dr. Sarah Mitchell
AUTH-RSO-892
6/30/2025, 4:15 PM
 
3
Chief Nuclear Officer
James Rodriguez
AUTH-CNO-001
6/30/2025, 4:30 PM
 
4
 
 
 
 
 
5
 
 
 
 
 
6
 
 
 
 
 
7
 
 
 
 
 
8
 
 
 
 
 
9
 
 
 
 
 
10
 
 
 
 
 

I certify that all work has been performed in accordance with approved procedures and that the system is safe for return to service.

 

CERTIFICATION DENIED - Cannot approve system restoration without full compliance certification.

Upload all supporting documentation, condition reports, and as-found/as-left condition photos

Choose a file or drop it here
 
 

This operational authorization form is now complete. Retain in plant records for minimum 10 years or per facility record retention schedule. System restoration may commence upon final CNO signature.