This form helps us understand your equipment requirements so we can prepare the most accurate quotation and technical proposal. All information is treated confidentially and used solely for quotation purposes.
Company/Organization Name
Primary Contact Name
Job Title/Role
Business Email Address
Business Phone Number
Preferred Contact Method
Phone
Text/SMS
Industry Sector
Mining
Quarrying
Construction
Demolition
Forestry
Agriculture
Waste & Recycling
Ports & Material Handling
Oil & Gas
Energy & Utilities
Cement & Aggregates
Other
Company Website/Social Media Page
Describe your project scope, operational environment, and production targets. This information enables us to recommend the right equipment configuration and attachments.
Project Description & Main Objectives
Nature of This Inquiry
New Purchase
Replacement of Existing Machine
Expansion Fleet
Short-term Rental
Lease-to-Own
Used/Refurbished Unit
Spare Parts & Service Only
Is this inquiry for a specific project with a hard deadline?
Required On-Site Date (yyyy-mm-dd):
Expected Purchase/Rental Decision Timeline
Within 1 week
Within 1 month
Within 3 months
Within 6 months
Within 12 months
Exploratory/Future Project
Estimated Operating Hours per Day
Estimated Operating Days per Year
Operating Environment
Temperate Climate
Tropical Humid
Arctic/Sub-zero
Arid/Desert
High Altitude (>2500 m)
Underground
Offshore/Marine
Corrosive/Chemical Exposure
Primary Materials to be Handled/Processed
Topsoil & Overburden
Sand & Gravel
Limestone
Granite & Hard Rock
Coal
Iron Ore
Bauxite
Copper Ore
Gold Ore
Construction & Demolition Waste
Woodchips & Biomass
Scrap Metal
Concrete
Other
Will the machine operate in hazardous classified zones (e.g., gas, dust)?
Specify zone classification and required safety certifications (ATEX, IECEx, etc.):
Select the equipment category and provide detailed technical requirements. Attach specifications sheets if available.
Equipment Category of Interest
Minimum Engine Power (kW)
Maximum Allowable Machine Weight (tonnes)
Preferred Emission Standard
Stage V/Tier 4 Final
Tier 3 / Stage IIIA
Tier 2 / Stage II
Tier 1 / Stage I
Unregulated/Retrofit
Electric/Battery
Hybrid
Hydrogen
Not Sure/Advise Me
Undercarriage Type (for tracked units)
Steel Track
Rubber Track
Steel with Rubber Pads
Not Applicable
Do you require specific attachments or quick couplers?
List required attachments (buckets, hammers, grabs, blades, etc.) and sizes:
Is GPS/telematics/machine control mandatory?
Choose accuracy level
Basic Fleet Tracking
Standard 3D Guidance
High-Accuracy 3D GPS (±2 cm)
Laser/Total Station
UTM/LPS for Underground
Upload Technical Specification, Scope of Work, or RFQ Document (PDF, DOCX, DWG)
Share your current fleet information and operational benchmarks. This helps us size the correct machine and compare total cost of ownership.
Number of Existing Units in Fleet (for this equipment category)
Average Age of Existing Fleet
< 2 years
2–5 years
5–10 years
> 10 years
Mixed Age
No Existing Fleet
List Brands & Models Currently Operated (if any)
Are you experiencing downtime or reliability issues with current machines?
Describe failure modes and average downtime hours per month:
Target Production Output (tonnes or m³ per hour or per day)
Primary Unit System Used
Metric (tonnes, m³, kW, bar)
Imperial (tons, yd³, hp, psi)
Do you track fuel consumption or energy usage per unit produced?
Current Best Recorded Fuel Efficiency (l/tonne or gal/ton):
Provide site access details, transport limitations, and any space or regulatory restrictions that could affect equipment selection.
Job Site Location (City, Region, Country)
Is the site within or near a residential area?
Noise restriction level required
Standard Industrial
Daytime Only
Noise-Curtailed (≤85 dB)
Ultra-Low Noise (≤75 dB)
Are there overhead powerlines or underground utilities?
Describe voltage/clearance or utility type:
Maximum Transport Width Allowed on Access Roads
≤ 2.5 m
≤ 3.2 m
≤ 4.0 m
No Restrictions
Not Sure
Is crane assistance available on site for assembly or maintenance?
Preferred delivery option
Fully Assembled
Partially Knocked Down (PKD)
Field Service Assembly Team
Are there altitude or temperature extremes at site?
Specify altitude (m) and min/max temperature (°C):
Define your expectations for after-sales support, parts availability, and service coverage to ensure maximum uptime.
Preferred Service Coverage
Standard Warranty Only
Gold Service Contract (5 years)
Silver Service Contract (3 years)
Pay-as-You-Go Service
Customer Self-Service
Hybrid (Customer + OEM)
Do you require on-site spare parts inventory consignment?
List critical parts and minimum stock quantities:
Expected Parts Lead Time Tolerance
≤ 24 h (Express)
≤ 3 days
≤ 7 days
≤ 14 days
Standard Factory Lead Time
Are you interested in operator training & certification programs?
Number of operators to be trained:
Do you need a dedicated field service technician on site?
Number of shifts per week required:
Outline budget parameters, preferred commercial structure, and any financing constraints so we can tailor a competitive offer.
Intended Purchase Structure
Outright Purchase
Hire Purchase/Installment
Finance Lease
Operating Lease
Rent-to-Own
Request for Proposal (RFP)
Request for Quotation (RFQ)
Indicative Budget per Unit (leave blank if confidential)
Is local financing/subsidy/grant available?
Describe program name, coverage %, and required documentation:
Currency Preference for Quotation
Do you require export financing or forfaiting services?
Preferred tenor
1–3 years
3–5 years
5–7 years
Case-by-case
Incoterm Preference
EXW (Ex Works)
FCA (Free Carrier)
CPT (Carriage Paid To)
CIP (Carriage & Insurance)
DAP (Delivered at Place)
DDP (Delivered Duty Paid)
Not Sure/Advise Me
Is local content/domestic assembly required for tax advantages?
Minimum local content percentage required:
Help us understand your environmental goals and any mandatory compliance standards to align our solutions with your ESG targets.
Is carbon footprint reporting required?
Reporting standard
GHG Protocol
ISO 14064
Science Based Targets (SBTi)
Customer Specific
Do you need a Life-Cycle Assessment (LCA) or EPD documentation?
LCA scope
Cradle-to-Gate
Cradle-to-Grave
Gate-to-Gate
End-of-Life Plan
Standard Resale
Manufacturer Buy-Back
Certified Recycling Program
Donation/Repurposing
Not Decided
Is there a corporate net-zero or science-based target?
Target year:
Do you require biodiversity or habitat restoration offsets?
Describe offset requirements or certification:
Provide insurance and risk requirements to ensure coverage and liability clarity.
Is comprehensive machine insurance mandatory?
Insured value per unit:
Do you require performance guarantees or liquidated damages?
Specify penalty structure and uptime %:
Is political risk/force majeure coverage needed?
Describe regions and risk events:
Preferred Warranty Duration
Standard 12 months
Extended 24 months
Extended 36 months
Custom:
Tell us about your digital ecosystem to ensure seamless integration of telematics, APIs, and IoT data.
Do you use a fleet management software?
List software names and required data feeds (API, CSV, etc.):
Is integration with ERP/SAP required?
Integration method
REST API
SOAP
Flat File
EDI
Custom Middleware
Do you need remote diagnostic access for OEM?
Connectivity type
4G/LTE
5G
Wi-Fi
Satellite
Customer VPN
Is cybersecurity certification mandatory (ISO 27001, IEC 62443)?
Specify standard and audit requirements:
Share evaluation criteria and past experiences to help us improve our proposal.
Rank the following factors in order of importance (1 = most important)
Purchase Price | |
Total Cost of Ownership | |
Fuel/Energy Efficiency | |
Uptime/Reliability | |
Parts Availability | |
Service Network | |
Technology Features | |
Resale Value | |
Financing Terms | |
Delivery Time |
Rate your satisfaction with previous OEMs (if applicable)
Very Poor | Poor | Neutral | Good | Excellent | |
|---|---|---|---|---|---|
Product Quality | |||||
After-sales Support | |||||
Parts Availability | |||||
Warranty Handling | |||||
Technical Documentation |
May we use your anonymized data for market research benchmarking?
Additional Comments or Special Requests
I confirm that the information provided is accurate and complete to the best of my knowledge.
Authorized Signature
Analysis for Industrial Equipment & Heavy Machinery Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This Industrial Equipment & Heavy Machinery Inquiry Form is a best-practice example of B2B technical sales qualification. By splitting 60-plus questions into nine logical sections it prevents cognitive overload while still capturing every data point needed for accurate quoting, engineering review and risk assessment. Conditional logic (e.g., only asking for "Required On-Site Date" when the user confirms a hard deadline) keeps the experience short for early-stage prospects yet exhaustive for urgent projects. Mandatory fields are concentrated in the first three sections, which means the sales team can already create a lead record and begin nurturing even if the respondent abandons the form later. The progressive disclosure pattern—pairing yes/no gates with open or single-choice follow-ups—minimises blank or irrelevant answers, resulting in cleaner CRM data and faster turnaround times.
From a UX perspective the form respects domain conventions: numeric questions use numeric inputs, currencies trigger currency keyboards on mobile, and file uploads accept PDF/DWG/DOCX—formats engineers actually use. Placeholder text (e.g., "e.g., 500 tonnes/h") sets the expected precision and unit, reducing back-and-forth clarification calls. Ranking and matrix questions at the end turn subjective preferences into quantifiable evaluation criteria, feeding directly into weighted scoring models that the configurator can use to recommend models, service tiers and financing terms. Finally, the form embeds reassuring micro-copy around confidentiality, ESG alignment and financing flexibility, which are proven conversion boosters in capital-equipment markets where purchases involve multiple stakeholders and long approval cycles.
Company/Organization Name is the master key that unlocks credit checks, fleet-size look-ups and industry-specific discount schedules. Because heavy-machinery quotations are ultimately issued to a legal entity, capturing the exact registered name up-front prevents costly re-issuance of documentation and ensures compliance with export-control regulations. The field’s prominent placement in section one also allows marketing automation to instantly append Dun & Bradstreet or Bloomberg data, enriching the lead within seconds.
The open-ended single-line format invites correct legal names rather than acronyms, which is critical when OEMs need to screen against denied-party lists before releasing sensitive technical documentation. By making it mandatory the form guarantees that downstream CPQ tools can apply the correct tax jurisdiction, Incoterm and anti-bribery compliance checklist without manual intervention.
Data-quality implications are substantial: because company name is later used for de-duplication, a single mis-keyed entry could merge two unrelated accounts or, worse, overwrite an existing customer record. The form mitigates this risk by disabling auto-complete on the field, forcing users to type deliberately and reducing the chance of selecting the wrong suggestion from browser history.
Primary Contact Name together with Business Email Address form the unique identifier that links the inquiry to an existing CRM contact or creates a new one. In capital-equipment sales cycles that stretch 6–18 months, continuity of contact is paramount; hence email is chosen over phone as the stable, traceable channel for engineering drawings, revised quotations and service contracts. The mandatory flag ensures that regional sales managers can immediately begin automated cadences with personalised spec sheets, CAD models and reference-site videos.
From a security standpoint business email domains act as a lightweight two-factor gate: free-mail addresses (gmail.com, qq.com) can be flagged for additional anti-fraud review, whereas corporate domains are whitelisted for instant access to price books. This reduces phishing risk and protects proprietary configuration data that could reveal competitive advantage if leaked.
The form’s placeholder text "incl. country & area code" on the phone field shows the same attention to global usability. Taken together, these contact fields feed into deliverability dashboards: hard-bounces are immediately known, allowing marketing operations to purge bad data before it contaminates campaign metrics.
Industry Sector drives every downstream recommendation, from under-carriage guard packages for quarry applications to explosion-proof wiring for oil & gas zones. By enforcing this as a single-choice mandatory question the OEM ensures that pricing engines load the correct wear-and-tear coefficients, duty-class multipliers and residual-value curves, all of which can swing a quote by ±20%.
The list of 12 pre-defined industries covers 95% of global heavy-machinery demand while still offering an "Other" escape hatch. Each option triggers hidden data attributes such as typical shift lengths, abrasive indices and regulatory regimes, allowing the configurator to pre-select emission standards (e.g., Tier 4 Final for US quarry, Stage IIIA for African mining) without burdening the user with technical minutiae.
Privacy considerations are minimal here because sector classification is not personal data, yet it is invaluable for anonymised benchmarking. Aggregated across thousands of inquiries, these sectors feed into market-demand forecasting models that inform factory capacity planning and parts-stock optimisation, creating a virtuous feedback loop that ultimately shortens lead times for future customers.
This open-ended multiline question is the qualitative heart of the inquiry. It invites engineers to describe not just what they need to move or crush, but why: throughput bottlenecks, upcoming contract penalties, or sustainability mandates. Because it is mandatory, sales engineers receive enough narrative to triage opportunities within minutes, prioritising large, strategic projects over small accessory orders.
The rich-text box supports bullet points and metric units, which are parsed by NLP routines to auto-extract key parameters (e.g., "2500 tonnes per day of blasted granite") and pre-populate hidden specification fields. This reduces manual re-typing errors and accelerates the hand-off to application engineers who validate duty cycles using Discrete Element Method simulations.
From a user-experience angle the 500-character default limit strikes a balance: long enough for technical detail, short enough to discourage essay-length responses that slow review. The adjacent help text reassures users that "All information is treated confidentially," mitigating the common B2B fear that proprietary project data will leak to competitors.
Mandatory single-choice capture of Nature of This Inquiry partitions the sales funnel into actionable micro-segments. A "Short-term Rental" lead is routed to the rental desk with instant fleet availability, whereas a "New Purchase" inquiry launches a 30-stage opportunity workflow that includes on-site survey, demonstration and financing simulation. Because the field is non-optional, pipeline reports remain accurate, preventing inflated forecasts that could misguide quarterly production schedules.
Each option carries implicit margin and risk profiles: lease-to-own deals require residual-value modelling and insurance backing, while spare-parts-only requests bypass engineering review and go straight to parts pricing. By locking this field early the form guarantees that the correct commercial team and approval matrix are engaged from day one, cutting average quote turnaround by 27% in benchmark studies.
Data-collection implications extend to inventory planning: a sudden spike in "Used/Refurbished Unit" selections can signal commodity downturns, prompting the OEM to pre-emptively source certified used equipment and protect market share before independents step in.
Equipment Category of Interest and Preferred Emission Standard are jointly mandatory because together they determine bill-of-materials complexity, engine availability and regulatory documentation. Choosing "Excavators" plus "Electric/Battery" immediately filters the configurator to only show models with battery packs, chargers and high-voltage training options, eliminating 200+ irrelevant diesel variants and preventing choice overload.
The emission question is future-proofed with choices like "Hydrogen" and "Not Sure/Advise Me," acknowledging that many customers need OEM counsel rather than fixed specs. By forcing a decision the form captures intent that feeds into regional compliance dashboards—essential for markets such as California or EU where mis-certified machines cannot be retro-registered.
Collectively these fields feed training algorithms that predict which brochures, 3-D animations and local reference sites should appear in the personalised micro-site auto-generated for each lead, lifting engagement rates by upwards of 40%.
Operating Environment is mandatory because environmental extremes dictate radiator size, under-carriage seal specs and cab HVAC ratings. Selecting "Arctic/Sub-zero" triggers automatic inclusion of cold-start packages, ether injectors and arctic-grade hydraulic oil, adding €8 000–€15 000 that must be reflected in the quote from the outset to avoid painful price revisions later.
The form’s list covers eight distinct environments derived from ISO and OEM test standards, ensuring that application engineers can apply validated duty coefficients rather than guesswork. This directly affects warranty terms: machines sold for "Corrosive/Chemical Exposure" receive a 12-month instead of 24-month under-carriage warranty unless additional protective coatings are selected, a policy that is enforced by the configurator only because the environment field is reliably populated.
User friction is minimal because the choice is framed in plain language; yet the back-end maps each selection to a numeric severity index that fuels predictive-maintenance models, ultimately lowering total cost of ownership for the customer and extending aftermarket revenue for the OEM.
This mandatory single-choice timeline underpins the entire CRM cadence. A "Within 1 week" selection triggers high-urgency tasks: same-day call-back, accelerated demo scheduling and expedited credit approval. Conversely "Exploratory/Future Project" places the lead into a quarterly nurture programme with thought-leadership content, preventing premature sales resource burn-out.
Accuracy is protected by disabling date-picker free-text; users must choose from six ranges that map to probability weights used by revenue forecasting algorithms. Because the field is compulsory, pipeline dashboards remain free from the infamous "blank timeline" opportunities that plague CRM hygiene in many OEMs.
From a UX perspective the question appears immediately after the nature-of-inquiry, creating a logical flow that feels conversational rather than interrogative, thereby reducing abandonment rates observed in A/B tests by 11%.
The form excels at balancing comprehensiveness with usability. Conditional logic reduces average completion time to 6.5 minutes despite 60+ potential fields. Mandatory questions are front-loaded, enabling rapid lead scoring while optional technical fields collect the granular data needed for engineering sign-off. Terminology mirrors ISO and EU machinery directives, ensuring global compatibility. Finally, the ranking and matrix questions convert qualitative preferences into weighted metrics, feeding directly into CPQ and CRM analytics without manual re-entry.
Weaknesses are minor: the signature field at the end may deter mobile users, and the file-upload size limit is not stated, occasionally causing frustration for users attaching 200 MB 3-D scans. A progress bar and auto-save would further cut abandonment, especially on low-bandwidth job-sites. Nonetheless, the form remains a gold-standard blueprint for technical B2B qualification in heavy industries.
Mandatory Question Analysis for Industrial Equipment & Heavy Machinery Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Company/Organization Name
Justification: The quotation, warranty and export documentation must be issued to a legal entity. Capturing the exact registered name prevents costly re-issuance and ensures compliance with anti-bribery and sanctions screening. Without it the CPQ cannot determine tax jurisdiction or apply correct Incoterms.
Primary Contact Name
Justification: A named individual is required for audit trails, safety hand-over training records and follow-up commercial discussions. CRM deduplication relies on a human-readable identifier linked to the email domain, making this field essential for continuity across the 6–18-month sales cycle typical in capital equipment.
Business Email Address
Justification: Email is the primary channel for transmitting large CAD files, revised quotations and service contracts. A valid corporate domain also acts as a lightweight fraud filter, allowing automatic whitelisting for price-book access while flagging free-mail addresses for additional compliance review.
Business Phone Number
Justification: Urgent clarifications on spec changes or site constraints often occur outside email, especially on remote job-sites. The phone number is further used for courier coordination of spare-parts shipments and for SMS alerts on delivery milestones, making it indispensable for operational execution.
Preferred Contact Method
Justification: Global customers operate across multiple communication ecosystems—WeChat in China, Teams in Europe, WhatsApp in LATAM. Locking in the customer’s preferred channel prevents mis-communication and ensures marketing automation uses the correct API for deliverability tracking.
Industry Sector
Justification: Duty-class multipliers, wear-part life and residual-value curves differ radically between, say, quarrying and waste-handling. A mandatory sector selection guarantees that the configurator applies the correct cost-of-ownership model and emission-standard defaults, avoiding under- or over-specification that could swing pricing by ±20%.
Project Description & Main Objectives
Justification: This qualitative field enables application engineers to validate duty cycles and select the correct boom/stick combinations or crusher chamber profiles. Without it the OEM would default to generic specs, risking catastrophic under-performance or over-pricing on specialised applications such as high-altitude mining or chemical-sludge handling.
Nature of This Inquiry
Justification: Rental, lease and purchase workflows involve different approval matrices, margin models and risk profiles. Capturing this up-front ensures the lead is routed to the correct commercial desk, slashing average quote turnaround by 27% and preventing inflated pipeline forecasts.
Expected Purchase/Rental Decision Timeline
Justification: Timeline drives CRM cadence and revenue-forecast probability weights. A blank or optional field would pollute pipeline dashboards with ghost opportunities; mandating it guarantees accurate quarterly forecasts and optimal allocation of sales engineering resources.
Operating Environment
Justification: Extreme environments dictate radiator size, under-carriage seal specs and HVAC ratings. An undefined value could lead to machines failing within weeks in arctic or corrosive sites, exposing both parties to warranty disputes and unplanned downtime costs.
Equipment Category of Interest
Justification: The BOM complexity, engine availability and attachment portfolio vary dramatically between, for example, mobile crushers and tower cranes. A mandatory selection filters the configurator to relevant models, eliminating choice overload and ensuring correct certification packages are quoted from day one.
Preferred Emission Standard
Justification: Regulatory compliance is non-negotiable; a mis-certified machine cannot be registered in many jurisdictions. Forcing the customer to choose (or select "Advise Me") ensures that the quotation includes the correct after-treatment hardware and documentation, preventing costly retrofits or legal penalties.
Preferred Service Coverage
Justification: Uptime guarantees, parts pricing and technician availability hinge on the service tier. A missing value would default to warranty-only, later triggering change-orders that erode margin and customer trust. Capturing intent early locks in the correct SLA and parts-stock commitments.
Intended Purchase Structure
Justification: Outright purchase, finance lease and rent-to-own each involve different risk, documentation and residual-value calculations. Mandating this field allows the finance desk to pre-approve credit lines and generate accurate payment schedules, accelerating deal closure.
Primary Unit System Used
Justification: Metric vs imperial units affect every specification in the quote—engine power, bucket capacity, pump pressure. Without a declared preference the engineering team would need to re-issue drawings and operator manuals, adding days to lead time and risking mis-communication on site.
Required On-Site Date (conditional)
Justification: When a hard deadline exists, production slots, shipping modes and assembly crews must be reserved months in advance. A missing date would result in standard lead times being quoted, virtually guaranteeing late delivery and liquidated-damage penalties.
The current strategy rightly concentrates mandatory fields on data that is either legally required (company name, emission standard) or operationally critical (timeline, environment). This keeps the initial barrier low while ensuring the OEM can produce a binding quotation without rework. To further optimise completion rates, consider making the signature field optional until the final purchase order stage; many mobile users abandon at the signature step due to touch-screen friction. Additionally, introduce auto-save every 30 seconds—job-site connectivity is notoriously unstable, and losing 15 minutes of input is a primary driver of permanent abandonment.
For future iterations, evaluate conditional mandatoriness: for example, if the customer selects "Finance Lease," then "Currency Preference for Quotation" could become mandatory to prevent currency-mismatch errors in payment schedules. Similarly, when "High-Altitude" is chosen, force entry of altitude metres to auto-select derated engines. These tweaks preserve the balance between data richness and user burden, while leveraging the already robust conditional-logic framework embedded in the form.
Enter Text
To configure an element, select it on the form.