This form replaces endless email threads by capturing every specification up-front. Fields marked with an asterisk are mandatory to ensure we can prepare a precise quotation.
Company/Organisation Name
Primary Contact Full Name
Job Title/Role in Project
Email Address
Direct Phone/VoIP/Teams
Project Name or Internal Reference
Project Location (City, Region)
Project Stage
Concept/Feasibility
Design & Specification
Procurement
Pilot/Prototype
Full Production
After-Sale Upgrade
Describe the problem you are trying to solve:
What is driving the upgrade and what pain-points must be eliminated?
Is this inquiry part of a larger framework agreement or tender?
Framework/Tender Reference Number
Select the product family and input the non-negotiable specifications first; this prevents recommending incompatible hardware.
Product Family Being Sourced
Industrial Sensor & Actuator
Embedded Board/SBC
Power Supply Unit
Communication Module
Cable/Connector
Enclosure/Rack
Cooling Component
Software License
Other:
Is a drop-in replacement for an obsolete part required?
Original Manufacturer & Part Number
Quantity Required (First Shipment)
Estimated Annual Volume
Target Unit Price Range (if any)
Required Availability
Off-the-shelf
Short Lead-time (≤4 weeks)
Standard Lead-time (4-12 weeks)
Long Lead-time acceptable (>12 weeks)
Custom Design:
Key Performance Parameters
Parameter | Min/Max Value | Unit (V, A, °C, Mbps...) | Tolerance / Accuracy | Notes | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Operating Voltage | 18-36 | VDC | ±5% | Power rail stability ±2% | |
2 | Operating Temperature | -40 to +85 | °C | ±2 °C | Outdoor enclosure, no active cooling | |
3 | ||||||
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Rate the criticality of the following environmental withstand capabilities
Not Required | Nice to Have | Important | Critical | |
|---|---|---|---|---|
Vibration & Shock | ||||
Humidity & Condensation | ||||
Electromagnetic Immunity | ||||
Chemical/Corrosive Agents | ||||
Salt Fog | ||||
UV Exposure |
Preferred Ingress Protection (IP) Rating
IP20
IP54
IP65
IP67
IP68
IP69K
Custom/Not Sure:
Is fanless/passive cooling mandatory?
Must the product be dust-proof?
Dust Type
Fine conductive dust
Non-conductive dust
Mixed
Unknown
Maximum Footprint (L × W × H mm)
Standard Mounting Preference
Required Front-Panel Interfaces
Display/Touch Screen
Pushbuttons
LED Indicators
Keypad
QR/Barcode Scanner
None
Required Rear Interfaces
Ethernet RJ45
SFP Slot
USB-A
USB-C PD
Serial RS232/485
CAN Bus
Digital I/O
Analog I/O
HDMI/DisplayPort
Power Plug
Other
Is hot-swap/hot-plug required?
Explain the hot-swap scenario and downtime constraints:
Connector Orientation Preference
Front
Rear
Top
Bottom
Left
Right
No Preference
Weight Limit (grams)
Preferred Operating System
Bare-metal/No OS
FreeRTOS
Zephyr
Embedded Linux Yocto
Debian/Ubuntu
Windows IoT
Android AOSP
macOS
No Preference
Is secure boot (cryptographic signature verification) mandatory?
Must the firmware support Over-The-Air (OTA) updates?
Required Security Certifications/Standards
Common Criteria EAL
FIPS 140-2
IEC 62443
ISO 27001
NIST SP 800-53
PCI-DSS
UL 2900
None
Other
Is physical debug port access to be disabled in production units?
List any mandatory encryption algorithms or key lengths
Required Programming Language Support
Indicate the importance of the following certifications for your market entry
Not Needed | Good to Have | Important | Gatekeeper | |
|---|---|---|---|---|
CE (EMC & LVD) | ||||
FCC Part 15 | ||||
ICES | ||||
RCM (AU/NZ) | ||||
KC (Korea) | ||||
CCC (China) | ||||
BIS (India) | ||||
UL/cUL | ||||
TÜV | ||||
ATEX/IECEx | ||||
Functional Safety SIL | ||||
RoHS/REACH | ||||
Conflict Minerals |
Is a CB Scheme Test Report (IECEE) acceptable in place of local certificates?
Explain which local deviations apply:
Required Warranty Duration
12 months
24 months
36 months
60 months
Lifetime
Custom
Custom:
Any special packaging or documentation to meet customs/dangerous-goods rules?
Product Lifecycle State Preference
Mass Production (≥5 years availability)
Active but Mature
Last-time-buy Soon
Not Important
Do you require a PCN (Product Change Notification) advance notice of ≥90 days?
Preferred Shipping Incoterms
EXW
FCA
CPT
CIP
DAP
DDP
FOB
CFR
CIF
Target Order Delivery Lead-time (days)
Is bonded/free-zone warehousing required?
Do you require end-of-life recycling/take-back service?
Required Design-in Documents
STEP/IGES 3-D Model
Altium/KiCad Footprint
Thermal Simulation File
MTBF/Reliability Report
Safety Schematics
API Reference Manual
Python SDK
C/C++ SDK
Video Tutorials
None
Preferred Technical Support Channel
Email Ticket
Phone
Teams/Zoom
Local FAE Visit
Community Forum
Chatbot
Do you need a dedicated compliance dossier for your end-customer?
Is on-site start-up commissioning required?
Expected duration (days) and location:
Upload Block Diagram, Schematic, or Data Sheet (PDF, DWG, ZIP)
Upload Photos of Installation Environment (if helpful)
Any additional constraints or value-add expectations not covered above?
I consent to the supplier storing my data to process this inquiry and send related updates
Authorised Signatory
Analysis for Technical Specification & Product Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This Technical Specification & Product Inquiry Form is purpose-built for small hardware vendors who must guarantee component compatibility before a quote can even be drafted. By forcing engineers to declare every environmental, mechanical, electrical, and compliance variable up-front, the form eliminates the classic back-and-forth that kills deals in the specification phase. The progressive disclosure pattern—mandatory core fields plus optional deep-dive follow-ups—keeps the cognitive load manageable while still harvesting the granularity needed for custom or quasi-custom parts.
From a data-quality standpoint, the form is a fortress: numeric fields for quantities and lead-times prevent textual ambiguity; matrix ratings convert subjective importance into ordinal data that can be scored automatically; conditional logic (e.g., tender references, IP-rating explanations) ensures that supplementary detail is captured only when contextually relevant. This design drastically reduces the risk of receiving an RFQ that is technically incomplete, which is the single biggest source of quotation delays in B2B hardware sales.
Purpose: Establishes the legal entity that will hold the NDA, accept the quote, and potentially open a line of credit. It is also the master key for CRM deduplication and ERP customer creation.
Effective Design & Strengths: The field is placed first, immediately anchoring the inquiry to a commercial reality. By making it mandatory, the supplier can pre-screen hobbyists or students who are unlikely to purchase in volume, protecting engineering resources.
Data Collection Implications: Capturing the exact legal name avoids downstream invoicing and customs headaches. The field feeds directly into credit-check APIs and export-control databases (e.g., ITAR denied-party screening).
User Experience Considerations: Autocomplete from public company databases could accelerate entry, but the open text keeps the form accessible to stealth-mode start-ups that have not yet incorporated.
Purpose: Provides a human point of accountability for technical clarifications and project escalations.
Effective Design & Strengths: Mandatory nature guarantees a named engineer or buyer exists, removing the anonymity that plagues generic info@ inquiries. The label explicitly asks for Full Name, discouraging initials or handles that would impede direct phone follow-ups.
Data Collection Implications: Combined with email, this field enables LinkedIn scraping to validate job function and seniority, helping sales prioritize large opportunities.
User Experience Considerations: No split into first/last name respects global naming conventions and avoids validation errors for cultures with compound surnames.
Purpose: Serves as the primary asynchronous communication channel for datasheets, quotations, and compliance documents.
Effective Design & Strengths: The placeholder engineer@acme-corp.com subtly signals that generic Gmail accounts are discouraged, raising the perceived seriousness of the inquiry. Email is mandatory because every subsequent workflow (document portal, quotation approval, revision control) is keyed off this identifier.
Data Collection Implications: Domain suffix is parsed to infer company size (.co vs.corp) and country-specific TLDs for routing to the correct regional sales team.
User Experience Considerations: Real-time RFC-5322 validation with friendly error messages prevents typos that would otherwise bounce critical engineering files.
Purpose: Calibrates supplier expectations regarding timeline, budget accuracy, and engineering support intensity.
Effective Design & Strengths: Single-choice radio buttons remove ambiguity, while conditional text areas (Concept vs. After-Sale Upgrade) capture context-specific pain points. Making this mandatory ensures that quotations are not prepared for projects that are still purely hypothetical, protecting internal engineering hours.
Data Collection Implications: The field feeds a weighted scoring model that ranks opportunities; early-stage projects receive low-touch datasheets, while procurement-stage inquiries trigger immediate allocation of field-application engineers.
User Experience Considerations: Descriptive labels (Concept/Feasibility) are clearer than numeric phase codes, reducing mis-selection.
Purpose: Routes the inquiry to the correct technical division (sensors, power, embedded compute, etc.) and pre-loads the appropriate specification templates.
Effective Design & Strengths: Mandatory selection prevents shotgun RFQs that waste multiple engineering teams’ time. The Other/Multi-Category option with a conditional text box captures edge cases without cluttering the main list.
Data Collection Implications: This field is the root of a dynamic BOM (bill-of-materials) compatibility engine; choosing Power Supply Unit automatically prompts questions about hold-up time and inrush current, ensuring no critical spec is forgotten.
User Experience Considerations: Alphabetical order plus category icons (if rendered) accelerates visual scanning for engineers in a hurry.
Purpose: Satisfies GDPR/CCPA requirements for lawful processing of personal and company data.
Effective Design & Strengths: Mandatory checkbox with explicit consent language eliminates legal ambiguity and prevents form submission by bots that ignore optional fields.
Data Collection Implications: Timestamped consent records are stored immutably, providing an audit trail for privacy regulators.
User Experience Considerations: The sentence is concise, avoids legalese, and links to a privacy policy, balancing compliance with friction reduction.
While the form excels at technical depth, its sheer length (nine sections) risks abandonment on mobile devices. A wizard-style progress indicator or save-and-continue-later token would raise completion rates for long-tail projects. Additionally, numeric fields such as Target Unit Price Range currently accept free text, opening the door to currency mismatches; enforcing ISO-4217 currency codes via a masked input would streamline ERP ingestion. Finally, the Signature field is optional; for RFQs above a configurable value threshold, promoting it to mandatory would strengthen legal enforceability of NDA-covered specifications.
Mandatory Question Analysis for Technical Specification & Product Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Company/Organisation Name
Without the legal entity name, the supplier cannot run export-control checks, create a CRM account, or issue a formal quotation. It is the anchor for every downstream commercial process, from credit approval to shipping documentation.
Primary Contact Full Name
A named individual is required for technical clarifications, escalation paths, and legal accountability under any subsequent NDA or purchase agreement. It also prevents anonymous inquiries that historically have low conversion rates.
Email Address
Email is the canonical asynchronous channel for transmitting datasheets, CAD models, and compliance certificates. Making it mandatory guarantees a communication path that is not dependent on phone availability or time-zone alignment.
Project Stage
Understanding whether the project is conceptual or in full production directly affects lead-time quotes, pricing strategy, and engineering resource allocation. A mandatory answer prevents the sales team from wasting effort on speculative inquiries that may never convert.
Product Family Being Sourced
This field routes the inquiry to the correct technical division and pre-loads the appropriate specification templates. Making it mandatory eliminates blanket RFQs that would otherwise require cross-departmental coordination and duplicate engineering reviews.
I consent to the supplier storing my data to process this inquiry and send related updates
GDPR and CCPA require explicit, informed, and unambiguous consent before any personal data can be processed. A mandatory checkbox ensures legal compliance and protects both parties from regulatory penalties.
The current set of six mandatory fields strikes an effective balance between data completeness and user burden. They represent the minimum viable data set needed to initiate a legally compliant, technically routable, and commercially actionable quotation workflow. To further optimize completion rates, consider implementing a two-stage process: stage one collects only the four core identity fields (Company, Contact, Email, Product Family), and stage two (revealed after Save & Continue) captures Project Stage and Consent once the user has mentally committed.
For future iterations, evaluate making Estimated Annual Volume conditionally mandatory when Project Stage equals Full Production; this single change would give pricing teams the volume lever they need while sparing early-stage researchers from abandonment-inducing questions they cannot yet answer. Finally, provide persistent visual cues (e.g., red asterisks with micro-copy 6 required fields) so users always know how far they are from submission, reducing anxiety-driven drop-offs.
To configure an element, select it on the form.