Tell us the basics so we can match you with the right systems, materials, and acoustic solutions.
Project name or reference
Sector
Corporate Office
Retail/Showroom
Hospitality
Healthcare
Education
Industrial
Mixed-Use
Other:
Floor area (m²) to be fitted
Number of floors affected
Is this a phased project?
Describe phase sequence and key milestones:
Preferred site start date
Required practical completion date
Is the building listed or heritage-controlled?
Are there existing tenant operations that must remain undisturbed?
Partition types of interest
Frameless Glass
Framed Glass
Solid Demountable
Acoustic Pods/Booths
Operable Walls
Steel Stud/Plasterboard
Timber Clad
Other
Primary glass type
Clear Float
Low-Iron/Extra-Clear
Tinted (Grey, Bronze, Blue)
Translucent/Acid-Etched
Switchable (PDLC)
Fire-Rated
Laminated Acoustic
Other:
Typical head track fixing
Suspended Ceiling
Concrete Slab
Steel Beam
Timber Joist
Raised Floor Pedestal
Other
Maximum partition height (mm)
Require integrated blinds or switchable privacy?
Will the wall carry signage or loads?
Describe load type, weight, and fixing method:
Need re-locatable or fully demountable system?
Acoustic comfort drives productivity. Specify STC/Rw targets and noise sources so we propose the correct glazing, seals, and core materials.
Required weighted sound reduction index (Rw/STC) for private offices
Required Rw/STC for meeting pods
Ambient noise level classification
Quiet (<40 dB)
Moderate (40-55 dB)
Noisy (>55 dB)
Unknown
Dominant noise sources
Road Traffic
Rail/Metro
Aircraft
Plant Room/HVAC
Open-plan Colleagues
Music/PA System
Industrial/Workshop
Other
Is flanking transmission via ceiling void a concern?
Require speech privacy (confidentiality) or speech intelligibility reduction?
Importance of acoustic performance vs. budget
Door style
Frameless Glass Hinge
Glass Pivot
Glass Sliding
Framed Hinge
Framed Sliding
Timber
Steel
Aluminium
Acoustic Sliding
Other
Hardware finish
Satin Stainless
Polished Stainless
Black Powder-coat
Bronze PVD
Brushed Brass
Custom RAL
Other
Require access control (card/QR/fingerprint)?
Preferred technology
Magstripe
MIFARE
HID Prox
QR Code
Fingerprint
Face Recognition
Mobile NFC
Need hold-open devices or floor springs?
Vision panel in solid doors?
Number of single doors
Number of double doors
Specify fire resistance, egress, and impact safety requirements to ensure code-compliant proposals.
Required fire-resistance rating (FRR)
Not required
30 min
60 min
90 min
120 min
180 min
To be advised by consultant
Is emergency egress a design driver?
Clear door opening width (mm) required for egress
Need impact-resistant safety glass (e.g., full-height barriers)?
Require balustrade/guarding compliance?
Will the wall system need seismic or structural movement joints?
List any special local codes or insurer requirements
Thermal performance priority
Not relevant (interior only)
Moderate (comfort)
High (energy code)
Certified Passivhaus/Net-Zero
Required U-value (W/m²·K) if known
Is condensation resistance critical (swimming pool, spa)?
Need low-VOC or Greenguard certified materials?
Require recyclable/take-back scheme at end-of-life?
Daylight/glare control
None
Integrated blinds
Electro-chromic glazing
External fins/louvres
Tinted glass
Other
Glass edge finish
Polished flat
Polished arris
Matte bevel
Leave as-cut
Joint/trim finish
Clear silicone
Color-matched silicone
Aluminium pressure plate
Timber bead
Shadow gap
Other
Need manifestation or decorative film?
Require company logo etch or UV print?
Want switchable LED reveal/light strips?
Preferred RAL/Pantone reference if known
Site access floor level
Ground
Raised ground
Upper floor with lift
Upper floor stair only
Roof/Penthouse
Basement
Other
Are out-of-hours deliveries required?
Is a loading dock available?
Maximum lift car depth (mm) if applicable
Maximum lift car width (mm) if applicable
Maximum lift capacity (kg) if applicable
Are existing services (HVAC, power) in the ceiling zone?
Need protection of adjacent finishes during install?
Describe any restricted working hours or noise curfews
Budget range (per m²)
< 300 USD
300–500 USD
500–800 USD
800–1,200 USD
> 1,200 USD
To be advised after consultation
Is this a design-bid-build or design-build contract?
Need leasing/financing options?
Require maintenance contract post-handover?
Is there a performance bond/guarantee requirement?
Decision priority: Cost vs. Speed vs. Quality
Upload floor plans (PDF, DWG, Revit)
Upload acoustic consultant report if available
Upload site photos or inspiration images
Upload fire strategy drawing
Upload MEP ceiling coordination drawing
Green building certifications targeted
LEED
BREEAM
DGNB
Green Star
WELL
Living Building Challenge
None
Other
Require Environmental Product Declarations (EPD)?
Need recycled content > 30%?
Is circular economy (reversible connections) a goal?
Company/Organization
Contact person full name
Job title/Role
Phone/WhatsApp
Preferred contact method
Phone
Teams/Zoom
In-person meeting
How did you hear about us?
Web search
Referral
Previous project
Trade show
Publication
Other
Additional comments or special requests
I consent to data storage for quotation purposes
Analysis for Commercial Interior Fit-Out & Glazing Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This form is a best-practice example for B2B interior-fit-out inquiries. By splitting 60-plus questions into ten logical sections it prevents cognitive overload while still capturing every technical, regulatory and commercial parameter required for an accurate quotation. Mandatory fields are limited to the absolute minimum (project name, sector, completion date, contact details and consent), which keeps the barrier to entry low while still giving estimators the data they need to price work and check feasibility. The progressive-disclosure pattern (follow-up questions appear only when relevant) keeps the interface clean and shortens perceived length. Contextual helper text under section headings explains why the information is needed, which increases trust and improves data quality.
From a data-collection perspective the form balances breadth with specificity. It collects quantified acoustic targets (Rw/STC values), fire-rating steps, U-values, load capacities and budget bands—turning qualitative aspirations into measurable briefs. Optional file uploads for drawings, acoustic reports and MEP drawings allow purchasers to evidence existing design work, which shortens the back-and-forth cycle and reduces sales cost. The inclusion of sustainability certifications, take-back schemes and EPD questions future-proofs the dataset for green-building procurement, aligning with tightening EU and North-American regulations.
Purpose: Creates a unique handle that links subsequent emails, drawings and revision logs to the same opportunity. In multi-stakeholder fit-out tenders this prevents duplicate enquiries and helps contractors track projects in CRM/ERP systems.
Design Strength: Single-line open text keeps the field flexible enough for internal codes (e.g., "BWP-2025-05") or descriptive names ("HQ West Wing Refurb"). The placeholder gives an example that nudges users toward concise, consistent entries without enforcing a rigid format.
Data Quality: Because the field is short and immediately visible, completion rates stay high; the estimator can later append suffixes such as "_Rev-A" to manage revisions. Storing the string as plain text avoids parsing errors common with auto-generated IDs.
UX Consideration: Positioned first in the flow, it acts as a low-friction micro-commitment, getting the user started before heavier cognitive questions appear.
Purpose: Drives the entire compliance and product filter set—healthcare requires anti-ligature hardware, retail may need burglary-resistant glazing, education calls for safety-rated glass below 800 mm. The sector flag also sets default acoustic and fire benchmarks.
Design Strength: Single-choice radio keeps answers mutually exclusive, avoiding ambiguous multi-select noise. The "Other" branch with conditional text input captures edge cases without cluttering the primary list.
Data Collection: Because the value is stored as a controlled vocabulary, downstream algorithms can auto-suggest partition cores, STC targets and door hardware packages, accelerating specification and reducing engineering hours.
UX: Users recognise their industry quickly; no scrolling through long nested lists. The icon or tile styling (if implemented visually) reinforces recognition over recall.
Purpose: Determines whether the enquiry is actionable. A 4-week lead-time for bespoke acoustic booths is physically impossible; the date triggers a capacity check and informs premium/overtime pricing.
Design Strength: HTML5 date-picker prevents ambiguous month-day transposition and auto-validates working days. Making it mandatory avoids RFQs that sit in limbo with "TBC" dates.
Data Quality: Stored as ISO-8601, the date can be compared algorithmically to factory lead-times, flagging hot-list projects automatically.
UX: Calendar widget reduces typing effort; field-level error messaging can warn if selected date falls on a weekend/bank-holiday, guiding the user toward realistic choices.
Purpose: Enables credit checks, NDA issuance and contract entity verification. For listed multinationals the name also signals potential repeat business, influencing discount tiers.
Design Strength: Autocomplete against a company-house API can pre-populate VAT number and registered address, shortening the form and improving accuracy.
Data Collection: Capturing the legal entity avoids later disputes over scope variations and provides a consistent billing label across projects.
Purpose: Establishes a single point of accountability for drawings, approvals and site access requests. In phased projects it prevents fragmented communication chains that delay RFI responses.
Design Strength: Free-text accommodates cultural naming conventions; no forced first/last split that can fail with compound surnames.
Purpose: Primary asynchronous channel for sending quotations, BIM models and programme Gantt charts. Email also acts as the unique user key for client portals.
Design Strength: Browser-native email validation reduces typos. Marking it mandatory prevents ghost enquiries that sales cannot follow up.
Purpose: Enables rapid clarification calls, site-survey scheduling and on-site problem solving. WhatsApp is increasingly used for photo sharing of existing ceiling grids or MEP clashes.
Design Strength: Accepts international formats; a small JavaScript mask guides +country code entry without rejecting valid but unusual numbers.
Purpose: Provides GDPR/CCPA-compliant legal basis for storing personal data and marketing follow-ups. Without it the entire lead becomes uncontactable.
Design Strength: Explicit opt-in checkbox with clear, plain-language label reduces regulatory risk and builds trust.
Purpose: Scales material take-offs and labour gang sizes. A 50 m² executive boardroom receives different glazing thickness and silicone joint spacing than a 2,000 m² open-plan.
Design Strength: Numeric input triggers built-in range validation (e.g., >5 m²) preventing nonsensical entries. Optional status avoids scaring off early-stage feasibility enquiries where size is still fluid.
Purpose: Quantifies acoustic performance, driving glass specification (laminated, asymmetric, vacuum) and perimeter sealant type. Mis-estimating this parameter causes costly post-installation retrofits.
Design Strength: Numeric entry allows exact STC/Rw value; optional status recognises that some clients rely on consultant reports that arrive later.
Purpose: Aligns client expectations with feasible systems. A <300 USD budget immediately rules out switchable PDLC glass and acoustic pods, guiding the estimator toward plasterboard-on-stud solutions.
Design Strength: Single-choice bands prevent decimal-point gaming while still giving enough granularity for go/no-go decisions. Optional status reduces sticker-shock abandonment.
Purpose: Respects user communication preferences, improving response speed. Asian clients may prefer WhatsApp, while US corporate contacts favour Teams.
Design Strength: Radio list keeps the mutually exclusive nature clear; the answer can be used to route leads into different queues (call centre vs. digital sales). Optional status acknowledges that email is already captured and sufficient for first contact.
The form collects personal identifiers (name, email, phone) and corporate financial indicators (budget). All fields are transmitted over TLS; uploaded drawings may contain proprietary floor-plate layouts. A clear retention period (e.g., 24 months post-quotation) should be disclosed to remain compliant with GDPR Article 5(1)(e). Because phone numbers can be used for SMS marketing, explicit opt-in and easy unsubscribe are critical to avoid TCPA or PECR penalties.
Although the form is long, the sectional accordion and step-indicator reduce perceived burden. However, file uploads for CAD drawings can exceed 10 MB on poor hotel Wi-Fi, causing timeout errors. Implementing chunked resumable upload and showing a progress bar would mitigate abandonment. The numeric fields for lift dimensions are only revealed if the user selects upper-floor access; this conditional logic should be tested with screen-readers to ensure accessibility compliance (WCAG 2.2). Finally, the absence of a "save and continue later" option may deter busy facilities managers who cannot finish in one sitting; integrating local-storage auto-save or email-draft functionality would raise completion rates.
Mandatory Question Analysis for Commercial Interior Fit-Out & Glazing Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Project name or reference
Justification: Acts as the master key for CRM tracking, drawing revision control and contractual correspondence. Without a unique label duplicate enquiries proliferate, causing double-counting in capacity planning and confusing project histories.
Sector
Justification: Drives the entire product and compliance filter set—fire ratings, acoustic benchmarks, hardware standards and pricing matrices vary dramatically between healthcare, retail and corporate offices. Making it mandatory ensures estimators apply the correct code set from the first quotation revision.
Required practical completion date
Justification: Determines project feasibility and factory slot allocation. A missing date prevents the production planner from checking glass toughening and acoustic-pod assembly lead-times, resulting in quotes that may promise impossible delivery schedules and expose the supplier to liquidated damages.
Company/Organization
Justification: Required for legal entity verification, credit checks and contract issuance. It also flags repeat clients, enabling automatic application of frame-contract discounts and preferred payment terms.
Contact person full name
Justification: Establishes a single point of accountability for technical queries, site surveys and approval sign-offs. Without a named individual communication fragments across multiple departments, delaying RFI responses and potentially stalling construction programmes.
Email
Justification: Serves as the primary digital channel for transmitting quotations, BIM models, programme schedules and revision notices. An accurate email address is also the unique identifier for client-portal access; making it mandatory eliminates ghost leads that sales teams cannot follow up.
Phone/WhatsApp
Justification: Enables rapid two-way communication for urgent clarifications, installation scheduling and on-site problem resolution. Voice or messaging apps are often the only viable channels when email servers block large attachments or when real-time photo sharing is needed to resolve ceiling-coordination clashes.
I consent to data storage for quotation purposes
Justification: Provides the legal basis under GDPR/CCPA for storing personal data and sending commercial follow-ups. Without explicit opt-in the vendor cannot retain contact details, rendering the entire enquiry untraceable and non-actionable.
The current form adopts a minimal-mandatory philosophy: only eight out of 60-plus fields are required, yet these eight capture the irreducible data set needed for feasibility, legal compliance and follow-up communication. This approach balances data quality with user convenience, keeping form-abandonment low while still arming estimators with critical parameters. To further optimise, consider making the budget range conditionally mandatory when a user selects "design-build" or requests seismic joints, as these choices drastically affect structural engineering costs. Additionally, implement real-time validation feedback (red outline and helper text) rather than post-submission errors, which reduces cognitive friction. Finally, introduce an auto-save feature so that busy facilities managers can pause and resume without re-entering data, thereby increasing completion rates for this high-value B2B lead-capture tool.
To configure an element, select it on the form.