This form collects the technical and operational details we need to specify equipment, flooring, rigging, and layout that withstand heavy commercial use and meet global safety standards.
Company/Property Name
Primary Contact Full Name
Job Title/Role in Project
Business Email
Mobile/WhatsApp Number
Project Stage
Conceptual
Design Development
Procurement
Under Construction
Post-Opening Upgrade
Desired Installation Start Date
Hard Opening/Hand-over Date
Facility Type
Corporate HQ Campus
Multi-Tenant Office Tower
Residential Complex
Hotel/Resort
Private Health Club
University/School
Government/Military
Mixed-Use Development
Other:
Approximate Floor Area (m²)
Clear Ceiling Height (cm)
Floor Level
Basement
Ground
Upper Floor
Rooftop/Outdoor Terrace
Multiple Levels
Is the space above underground parking or a transfer slab?
Maximum allowable additional dead load (kg/m²)
Are windows or glazed walls within impact distance?
Describe glazing type & height from floor
Describe existing finishes (floor, walls, columns, HVAC, etc.)
Upload latest floor plan/reflected ceiling plan (PDF or image)
Upload photos or 360° walk-through video of the empty space
Expected peak simultaneous users
Daily footfall (total entries)
Primary user group
Employees only
Residents only
Hotel guests
Pay-per-use public
Hybrid
Peak usage drivers
Before work (06:00-08:00)
Ltime (12:00-14:00)
After work (17:00-20:00)
Weekend mornings
Weekend afternoons
Seasonal spikes
How would you characterize typical workout intensity?
Very light (yoga, stretching)
Light (cardio, machine weights)
Moderate (free weights, HIIT)
Heavy (Olympic lifting, sled pushes)
Extreme (competitive training, drop jumps)
Will personal trainers or coaches conduct dynamic drills?
Select drills that apply
Battle ropes
Plyo-box jumps
Medicine-ball slams
Kettlebell swings
Sled drives
Olympic lifting platforms
Expected equipment replacement cycle (years)
Select categories and specify quantities. We will later refine brands, models, and space planning.
Cardio Zone
Item | Qty | Self-powered (no external cord) | Entertainment console required | Notes | ||
|---|---|---|---|---|---|---|
A | B | C | D | E | ||
1 | Treadmills | 4 | Yes | Yes | ||
2 | Ellipticals | 2 | Yes | |||
3 | Upright bikes | 2 | Yes | |||
4 | Rowing ergometers | 1 | ||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
9 | ||||||
10 |
Strength & Functional Zone
Item | Qty | Guidance type | Notes | ||
|---|---|---|---|---|---|
A | B | C | D | ||
1 | Multi-station cable crossover | 1 | Selectorized,Plate-loaded,Band-based | ||
2 | Half-rack with monkey bars | 1 | Fixed,Modular | ||
3 | Adjustable benches | 4 | Flat only,Folding,Decline | ||
4 | Dumbbells (pairs) | 10 | Rubber hex,Urethane | ||
5 | |||||
6 | |||||
7 | |||||
8 | |||||
9 | |||||
10 |
Do you need a dedicated free-weight lifting zone with platforms?
Number of Olympic platforms
Do you want a functional rig with monkey-bar bay attachments?
List desired attachments (e.g. landmine, battle-rope anchor, TRX, core bags)
Specialty zones (if any)
Yoga/Mind-body studio
Spin studio
Reformer Pilates
Rehab/physio room
Cold plunge & sauna
Outdoor training terrace
Locker & changing village
Do you require inclusive equipment (wheelchair-accessible machines, low-start resistance)?
Do you need asset-tracking (IoT sensors, RFID) for preventive maintenance?
Preferred flooring type
Recycled SBR rubber tiles
EPDM color-chip rubber
Recycled vulcanized rolls
Engineered wood sport court
Hybrid vinyl-sport
Raised floor with understructure
Minimum required impact-sound reduction (ΔIIC)
Is there a below-grade neighbor sensitive to vibration?
Describe neighbor type (office, MRI lab, hotel, etc.) and acceptable vibration criteria
Must flooring be non-porous and disinfectable (medical-grade)?
Slip resistance requirement (dry)
R9 (low)
R10 (moderate)
R11 (high)
R12 (extreme)
Do you need integrated line-marking for functional training grids?
Will free weights be dropped from overhead?
Maximum drop height (cm)
Is emergency-egress width likely to be compromised by equipment layout?
Required clear egress width (cm)
Safety accessories
Crash rails on columns
Mirror safety backing
Wall-protector corner guards
Fire-extinguisher cabinets
AED wall station
First-aid kit niche
Current fresh-air supply (L/s per m²)
Acceptable CO₂ ppm during peak occupancy
Target temperature range during workouts
18-20 °C
20-22 °C
22-24 °C
24-26 °C
Relative humidity target
40-50%
50-60%
60-70%
Is mechanical cooling (chilled water or VRF) prohibited by landlord?
Do you want demand-controlled ventilation (DCV) via CO₂ sensors?
Is biophilic design (living plant walls) part of the brief?
Number of 220-240 V dedicated circuits required
Total standby + operating power (kVA)
Do cardio machines need PoE+ or USB-C for screens?
Will you broadcast virtual-classes to screens?
Preferred video infrastructure
IPTV multicast
HDBaseT matrix
AV-over-IP
Wireless casting
Do you require people-counting or face-blurring analytics?
Sound system zones
Background music only
Instructor mic & music
Distributed line-array
Silent headphone system
Must Wi-Fi 6/6E cover 100% of floor with <-65 dBm RSSI?
Sustainability certification target
None
LEED Gold
LEED Platinum
BREEAM Very Good
BREEAM Excellent
WELL Building
Local Green Building Standard
Do you require Environmental Product Declarations (EPD) for all materials?
Is take-back of flooring & equipment at end-of-life mandatory?
Preferred recycled content thresholds
Rubber flooring > 50% post-consumer
Steel frames > 30% recycled
Plastic accessories > 70% ocean plastic
Wood from FSC-certified forests
Do you want real-time energy dashboard for users?
Budget range for equipment & flooring (turn-key)
Procurement model
Outright purchase
Lease-to-own
Subscription (equipment-as-a-service)
Rental for pop-up
Is import duty & freight inside budget or separate line item?
Do you need staged delivery to match construction milestones?
Will spare-parts storage for 5 years be required on-site?
We design to international norms (ISO 20957, EN 957, ASTM F1749) unless local codes are stricter. Specify any deviations below.
Is a third-party inspection & load-test certificate mandatory?
Do you need product-liability insurance naming your entity as co-insured?
List any additional national or local standards we must follow
Are there building insurance clauses that restrict floor-loading or noise?
Do you require operator-training videos & SOP manuals?
Is an annual re-certification & maintenance contract needed?
Any special requests or constraints not covered above
Upload RFP/tender document (if applicable)
I confirm that structural engineer approval will be obtained prior to installation
I consent to the storage of my data for quotation and project communication purposes
Would you like to receive our quarterly white-papers on wellness design trends?
Analysis for Commercial Fitness & Wellness Infrastructure Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
The Commercial Fitness & Wellness Infrastructure Inquiry Form is a best-practice example of B2B technical discovery. By forcing respondents to confront load limits, vibration thresholds, peak footfall, and replacement cycles up-front, the form prevents costly re-designs and legal exposure later. Its progressive disclosure pattern—starting with contact data, moving through site physics, user demand, safety, and finally budget—mirrors the way architects and facilities managers actually plan capital projects, so cognitive load is low despite the depth of detail.
Mandatory fields are concentrated where they materially affect structural, acoustic, or liability risk, while optional fields expand on comfort, sustainability, and future-proofing. This keeps completion friction low for early-stage prospects yet still arms engineers with the non-negotiables they need for a compliant quotation. The repetition of numeric fields (area, load, decibel, temperature, humidity, CO₂ ppm) signals to the user that the vendor will perform real calculations, not guesswork—an important trust signal in a sector notorious for over-promising and under-engineering.
Company/Property Name is the master key that links every downstream specification to a legal entity and a physical asset. Without it, quotations, insurance certificates, and structural letters of assurance cannot be issued. The form’s decision to make this mandatory is therefore non-negotiable.
From a data-quality standpoint, the open-ended single-line format invites correct legal names, which is essential for lien searches, landlord approvals, and import documentation. A drop-down would need constant curation and would still miss subsidiaries or special-purpose vehicles common in mixed-use developments.
Privacy implications are minimal because the name is already in the public domain, yet it still provides a valuable de-duplication key for the vendor’s CRM, preventing multiple sales reps from quoting the same project under different aliases.
Business Email is the primary asynchronous channel for sending load tables, CAD blocks, and compliance certificates that are too large or sensitive for phone calls. Making it mandatory ensures the sales engineer can deliver a technically complete proposal rather than an informal budget estimate.
The field’s open-ended nature allows corporate or government domains, which in turn enables automatic verification against public procurement databases—useful for lease-to-own or subscription models where credit checks are required.
User-experience friction is low because every commercial buyer expects to provide a business email; the form does not ask for personal contact details, so GDPR consent is scoped narrowly to legitimate interest.
Project Stage is the single best predictor of quotation complexity and timeline. A respondent still at “Conceptual” needs space programming and budgetary pricing, whereas “Under Construction” demands shop drawings, point loads, and coordination with MEP trades. Making this choice mandatory allows the vendor to route the lead to the correct technical team immediately, cutting days off response time.
The enumerated list covers the full capital-project lifecycle without overlap, eliminating ambiguity that would otherwise require back-and-forth clarification. It also signals to the buyer that the vendor is experienced with fast-track as well as green-field scenarios, reinforcing credibility.
Data collected here feeds pipeline forecasting: early-stage opportunities receive nurture content on sustainability certifications, while procurement-stage leads are fast-tracked to order-entry, improving sales velocity.
Approximate Floor Area (m²) is the foundational scalar for every subsequent engineering calculation: equipment count, ventilation rates, flooring cost, and even staffing recommendations. By making it mandatory, the vendor ensures that preliminary quotations are internally consistent and defensible when the landlord or financier reviews the budget.
The numeric field enforces metric units, preventing costly conversion errors that plagued older forms that accepted “10,000 sq ft” in a free-text box. The tolerance implied by “approximate” reduces user anxiety, yet still yields data within ±10% accuracy—good enough for ±15% budgetary pricing, which is the industry norm.
Because area correlates strongly with user capacity and therefore with revenue potential, this question also underwrites the business-case section of the eventual proposal, helping the client justify capex to their board.
Expected Peak Simultaneous Users directly drives structural live-load, ventilation airflow, and equipment redundancy. A mandatory answer forces the client to think realistically about density—an overloaded boutique studio can exceed 5 kN/m², triggering the need for a transfer-slab analysis.
The numeric format allows the vendor’s software to auto-check against local building codes (e.g., ASHRAE 62.1 requires 27 m³/h per person for low-intensity cardio). If the user enters a number that implies >800 ppm CO₂ with the stated airflow, the system can flag the mismatch and propose DCV upgrades, demonstrating engineering competence before a site visit.
From a UX perspective, this question appears early in the usage-intensity section, so the respondent can logically extrapolate from daily footfall data they already know, reducing perceived burden.
Budget Range for Equipment & Flooring (turn-key) is mandatory because it anchors the entire value-engineering conversation. Without it, architects often over-spec premium brands, only to discover the capex ceiling during board approval, wasting weeks of design work.
The currency field auto-detects locale, avoiding the ambiguity of “$” that could mean CAD, AUD, or USD. Combined with the procurement-model question, the vendor can immediately propose lease-to-own or subscription options if the budget is tight, keeping the deal alive.
Psychologically, asking for budget after the user has already invested in describing technical constraints reduces sticker-shock; the respondent understands that the vendor needs a financial boundary to deliver a safe, compliant facility.
This mandatory checkbox is a liability firewall. Fitness rigs and free-weight zones can impose point loads >12 kN per anchor; without a structural letter of assurance, the vendor could be drawn into litigation if slab failure occurs. Forcing the client to acknowledge this responsibility up-front protects both parties and accelerates insurance underwriting.
The wording “will be obtained” is deliberate: it transfers the obligation to the client while still offering the vendor’s engineering sub-consultancy as a billable service, creating an additional revenue stream.
UX friction is minimal because the form already asked for dead-load limits earlier; the user is primed to understand that structural sign-off is non-negotiable.
Mandatory GDPR consent is legally required for any non-transactional follow-up. By making the checkbox explicit and narrow—“quotation and project communication”—the vendor avoids the conversion-killing language of broader marketing consents while still remaining compliant.
The checkbox appears last, after value has been established, so abandonment is low. Because it is mandatory, the CRM can legally auto-enroll the contact into technical drip campaigns (e.g., white-papers on vibration isolation) without risking spam complaints.
The form’s greatest strength is its ruthless focus on variables that affect life-safety and liability: floor loading, glazing impact, vibration, egress width, and user density. By making these fields mandatory, the vendor filters out tire-kickers and arms its engineers with the data needed for a compliant design. Optional fields neatly capture comfort, sustainability, and AV extras that differentiate the proposal but do not gate the quotation process.
Weaknesses are minor: the absence of conditional logic between “roof-top terrace” and wind-load calculations, and no auto-calculation of ventilation rates from CO₂ targets. However, the current structure already outperforms industry norms by integrating safety, usage, and budget into a single coherent discovery flow.
Mandatory Question Analysis for Commercial Fitness & Wellness Infrastructure Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Company/Property Name
Justification: This field is the legal anchor for contracts, insurance certificates, and landlord approvals. Without the exact entity name, the vendor cannot issue compliant quotations or perform lien searches, creating unacceptable downstream risk.
Primary Contact Full Name
Justification: A named individual is required for authority-to-proceed letters, technical submittals, and safety-training records. It also prevents duplicate leads when the same project is submitted by different departments.
Business Email
Justification: Engineering deliverables (load diagrams, CAD blocks, compliance matrices) are too large and technical for phone calls. A business email ensures traceable, auditable communication and satisfies ISO 9001 document-control requirements.
Project Stage
Justification: Resource allocation and quotation accuracy hinge on timing. Early-stage leads receive space programming, while procurement-stage leads need shop drawings; misclassification wastes engineering hours and jeopardizes delivery dates.
Desired Installation Start Date & Hard Opening/Hand-over Date
Justification: These dates drive manufacturing lead-times, sea-freight bookings, and installation crew scheduling. Missing a hand-over date can trigger liquidated damages clauses, so accurate scheduling data is non-negotiable.
Facility Type
Justification: Corporate campuses have different liability profiles than pay-per-use public gyms (e.g., duty-of-care standards, insurance premiums). Correct classification ensures the proposal includes appropriate safety and access-control measures.
Approximate Floor Area (m²)
Justification: Every cost and engineering calculation—ventilation rates, equipment count, flooring tonnage—scales from area. Without it, any quotation would be speculative and non-contractual.
Floor Level
Justification: Upper floors and rooftops have stricter vibration and fire-egress constraints than ground floors. This field triggers structural load-path analyses that must be priced into the proposal.
Are windows or glazed walls within impact distance?
Justification: Glazing within drop-zones must be replaced with safety film or laminated glass to meet EN 12600 impact standards. Omitting this data exposes both client and vendor to post-installation retrofit costs and injury liability.
Expected Peak Simultaneous Users & Daily Footfall
Justification: These metrics determine live-load, ventilation airflow, and equipment redundancy. Under-estimating user density can result in code violations and overheated spaces, while over-estimating inflates capex unnecessarily.
Primary User Group
Justification: Employees-only facilities can tolerate higher noise and vibration limits than mixed-use developments with hotel guests or MRI suites below. Correct classification prevents costly acoustic remediation post-hand-over.
Peak Usage Drivers
Justification: Knowing that peak occurs at 17:00-20:00 allows the HVAC design to target 24 °C and <800 ppm CO₂ precisely when failure would be most visible—and litigious.
Workout Intensity Rating
Justification: Heavy Olympic lifting requires 40 mm+ shock-absorbing rubber and 2.5× safety-factor anchorage, whereas yoga needs no impact attenuation. Misclassification risks floor failure and user injury.
Expected Equipment Replacement Cycle
Justification: A five-year cycle demands commercial-grade bearings and upholstery, while a ten-year cycle justifies stainless-steel fasteners and belt-driven cardio. Without this datum, warranty pricing is guesswork.
Preferred Flooring Type
Justification: Each flooring substrate has distinct load-bearing, acoustic, and slip-resistance properties. Specifying SBR tiles versus raised floor changes the entire structural coordination and cost base.
Minimum Required Impact-Sound Reduction (ΔIIC)
Justification: Landlord leases often stipulate ΔIIC ≥ 17 to protect below-grade tenants. Failing to meet this triggers penalties and forced retrofits, so the value must be locked in during quotation.
Target Temperature Range During Workouts
Justification: Temperature drives HVAC plant sizing and electrical load. An incorrect set-point can double chiller capacity and operating cost, voiding energy-model guarantees.
Sustainability Certification Target
Justification: LEED Platinum requires EPDs for 90% of products and take-back programs, adding 8-12% to material cost. Early confirmation prevents value-engineering shocks at contract stage.
Budget Range for Equipment & Flooring (turn-key)
Justification: Without a budget ceiling, proposals risk over-specifying premium brands and losing the deal on price, or under-specifying and failing on performance. A stated range anchors realistic value-engineering.
Procurement Model
Justification: Subscription models require residual-value calculations and service-level agreements, whereas outright purchase shifts spare-parts risk to the client. Correct model selection affects cash-flow and tax treatment.
I confirm that structural engineer approval will be obtained prior to installation
Justification: This checkbox transfers liability for slab adequacy to the client, protecting the vendor from litigation while ensuring that point loads and anchorage are formally reviewed—an insurance underwriter requirement.
I consent to the storage of my data for quotation and project communication purposes
Justification: GDPR mandates explicit, informed consent before any non-transactional follow-up. Making this mandatory ensures the CRM can legally store data and send technical submittals without risking spam penalties.
The form strikes an optimal balance: 23% of fields are mandatory, concentrated where life-safety, liability, or cost accuracy is at stake. This keeps completion friction low while ensuring engineers receive the non-negotiables needed for a compliant quotation. To further improve, consider making slip-resistance and egress-width mandatory only when free-weight zones exceed 150 m², using conditional logic to reduce perceived burden on small corporate cardio rooms.
Additionally, introduce progressive disclosure: if “Procurement Model” equals “Subscription,” auto-require “spare-parts storage” and “annual re-certification” to be mandatory, aligning data collection with the selected business model. Finally, add inline help text stating that mandatory fields are required for “safety compliance and accurate pricing,” so users understand the rationale and are less likely to abandon the form.
To configure an element, select it on the form.