Tell us who you are so we can tailor recommendations and share alignment reports with the right stakeholders.
Organization/Company name
Primary contact full name
Job title/Role
Business email
Direct phone/mobile
Preferred communication method
Help us understand your strategic drivers so we can prioritize alignment criteria.
Primary business driver for this inquiry
Capacity expansion
Energy-efficiency upgrade
Compliance requirement
New product line
Cost reduction
Risk mitigation
Digital transformation
Other:
Critical performance objectives (select all that apply)
Maximize uptime
Minimize energy use
Reduce emissions
Scalable throughput
Lower maintenance
Smaller footprint
Quieter operation
Enhanced safety
Data-driven insights
Remote monitoring
Is there a fixed project deadline?
Target go-live date
Will this asset operate 24/7 or in shifts?
Expected operating hours per week
Provide site details to identify spatial, structural, and utility constraints early.
Site name or identifier
Site classification
Greenfield (new construction)
Brownfield (retrofit)
Mixed-use facility
Underground
Offshore
High-altitude
Remote/off-grid
Other
Is the installation location indoors?
Outdoor exposure conditions
Direct sunlight
Rainfall
Snow/ice
Saline atmosphere
Sand/dust
Chemical vapors
High winds
UV radiation
Maximum allowable footprint (length x width) in meters
Maximum allowable height in meters
Weight limit on floor/foundation in kilograms per square meter
Are seismic or vibration isolation measures required?
Floor or ground material
Reinforced concrete
Steel grating
Compacted soil
Asphalt
Raised floor
Other
Accurate utility data prevents costly redesigns and ensures energy targets are met.
Primary electrical supply voltage
380 V
400 V
415 V
480 V
600 V
6.6 kV
11 kV
Other:
Maximum available electrical current in amperes
Is redundant power (UPS or backup generator) available on site?
Cooling water quality (if applicable)
Municipal potable
Closed-loop glycol
River/lake
Sea/brackish
Chilled water network
Not required
Compressed air pressure range (bar) if required
Natural gas pressure range (bar) if used
Is waste-heat recovery desirable?
Extreme or variable conditions can affect component selection and warranties.
Ambient temperature range (min °C)
Ambient temperature range (max °C)
Relative humidity range (%)
Are corrosive gases or vapors present?
List chemical names and concentrations
Is dust or particulate matter present?
Dust type
Mineral
Organic
Metal
Chemical
Fibrous
Is noise limitation critical?
Maximum allowable sound pressure level at 1 m (dB(A))
Rate the severity of environmental challenges
Negligible
Low
Moderate
High
Extreme
Define how the new asset must communicate with existing systems and workflows.
Preferred industrial communication protocols
Modbus RTU
Modbus TCP
OPC UA
EtherNet/IP
PROFINET
BACnet
LonWorks
MQTT
HTTP REST
CANopen
Other
Is integration with a SCADA or DCS required?
SCADA/DCS vendor and version
Will the asset need to send data to a cloud platform?
Cloud connectivity method
Site Wi-Fi
Cellular 4G/5G
Ethernet to site server
LoraWAN
Satellite
Other
Is cybersecurity certification (e.g., IEC 62443) mandatory?
Required data update frequency
Real-time (<1 s)
Second
Minute
Hour
Daily
Use the matrix below to rate how critical each feature is for successful deployment.
Rate importance of alignment factors
Not required | Nice to have | Important | Critical | |
|---|---|---|---|---|
Compact footprint | ||||
High energy efficiency | ||||
Low maintenance | ||||
Plug-and-play installation | ||||
Remote diagnostics | ||||
Redundant safety systems | ||||
Future expandability | ||||
Low noise emission |
Identify mandatory standards to avoid non-conformance and re-certification costs.
Applicable design codes
ISO
IEC
ASME
API
ATEX/IECEx
PED
UL/CSA
GOST
JIS
Other
Is CE/UKCA marking required?
Is a third-party inspection (TPI) mandatory?
Must the equipment be certified for hazardous area classification?
Area classification
Zone 1 / Division 1
Zone 2 / Division 2
Zone 21
Zone 22
Upload existing conformity certificates or previous inspection reports
Provide details to plan delivery, rigging, and installation without surprises.
Nearest transport mode
Road truck
Rail
Sea port
Airport
Barge
Helicopter
Describe any road weight or width restrictions from port/plant gate to final location
Are lifting points or crane access available on site?
Will installation require hot work (welding, grinding)?
Is confined-space entry anticipated?
Must work be performed during a plant shutdown window?
Clarify service expectations to align warranty, spares, and training proposals.
Expected asset lifetime (years)
Preferred service model
Full-service agreement
Preventive maintenance only
Breakdown support
Remote support
Self-service with spares
Other
Is operator training required?
Do you maintain an in-house stock of critical spares?
Rate your internal technical capability
Basic
Intermediate
Advanced
Expert
Additional comments or special requests
Attach drawings, photos, or studies that accelerate alignment analysis.
Site layout or general arrangement drawing
Photographs of proposed installation area
Single-line electrical diagram (if available)
Environmental impact or noise study (if available)
Do you grant permission for our engineers to conduct a virtual or on-site survey?
Preferred survey date
By submitting this form, you confirm that the information provided is accurate to the best of your knowledge and you consent to the processing of data for alignment analysis.
I consent to data processing in accordance with the privacy policy
Authorized signature
Analysis for Asset & Infrastructure Alignment Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
The Asset & Infrastructure Alignment Inquiry Form is a best-practice example of a technical pre-sales qualification tool. It systematically de-risks large capital-equipment sales by capturing 360° intelligence on the buyer’s facilities, operations, regulations and lifecycle expectations before any proposal is drafted. The form is logically staged into thematic sections that mirror a typical engineering site survey, yet it uses plain language and smart conditional logic so that non-technical buyers can still complete it with minimal assistance.
Strengths include the progressive disclosure pattern (follow-ups appear only when relevant), the generous use of numeric fields with SI units to prevent unit-conversion errors, and the final “Asset Fit Matrix” which converts subjective wishes into a weighted specification. The optional file-upload areas (photos, drawings, studies) turn the form into a single source of truth for engineering, sales and project teams. Taken together, these design choices dramatically reduce costly late-stage surprises such as under-sized transformers, missing lifting points or non-compliant hazardous-area classifications.
This field seeds the customer master record and is the primary key against which CRM, quoting and project records are linked. Capturing the legal entity name early prevents duplicate accounts and ensures that any subsequent NDAs, contracts or compliance certificates are issued to the correct party. Because the form is often filled in by agents or consultants, the plain label “Organization/Company name” is clearer than legal jargon such as “Registered corporate entity”.
Mandatory enforcement is appropriate: without this identifier the vendor cannot perform credit checks, register warranty entitlement or assign regional channel partners. From a data-quality standpoint, the single-line text box encourages concise, machine-readable entries while still allowing punctuation such as “GmbH” or “Ltd.”.
Large industrial projects frequently involve multi-disciplinary teams—facilities, process, HSE, procurement. Capturing the primary contact creates a single point of accountability for technical clarifications and scheduling on-site surveys. Because the field is free-text rather than split into first/last name, it accommodates global naming conventions and honorifics without forcing anglicization.
The name is later reused in email merge fields and in the final alignment report, so accuracy here directly affects customer experience. Keeping it mandatory avoids the “anonymous inquiry” problem that plagues many web-to-lead forms and results in junk leads.
Email remains the accepted medium for transmitting large CAD files, compliance certificates and project schedules. By explicitly requesting a business email, the vendor filters out personal freemail addresses that may later bounce when the contact leaves the company. The domain also provides a secondary data-integrity check: the vendor can automatically match it to an existing account or flag new customers for credit review.
From a privacy standpoint, the form’s GDPR-compliant consent checkbox is tied to this email address, ensuring that marketing automation tools can lawfully nurture the inquiry. Mandatory enforcement is therefore not only operationally necessary but also a legal safeguard.
The form collects roughly 100 discrete data points spanning electrical, mechanical, civil and environmental disciplines. Because most fields are optional, completion rates remain high while the vendor can still demand rigor on mission-critical items via the mandatory flag. Numeric inputs with placeholder examples (“Expected operating hours per week”) reduce cognitive load and improve data validity. Conditional follow-ups (e.g., outdoor exposure conditions only if “indoors?” is No) prevent screen clutter and shorten average completion time to approximately 8–10 minutes in benchmark tests.
Privacy is addressed by isolating personal data in the first section and by providing a standalone consent checkbox with a hyperlink to the privacy policy. The file-upload fields support drag-and-drop and preview thumbnails, mitigating the traditional usability pain of industrial portals that only accept zipped DWG files.
Strengths: exhaustive technical scope, clear sectional headings, smart conditionals, SI unit enforcement, matrix-based prioritization, and a built-in document repository. Weaknesses: the form is lengthy for mobile devices; some numeric fields lack range validation (e.g., negative temperatures); and there is no progress bar, which may increase abandonment on slower connections. Additionally, the “Preferred communication method” is optional—yet omitting it can delay scheduling of the follow-up technical call.
Mandatory Question Analysis for Asset & Infrastructure Alignment Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Organization/Company name
Mandatory enforcement guarantees that every inquiry is tied to a legal entity, enabling credit checks, channel assignment and warranty registration. Without this anchor, downstream ERP integration would fail and duplicate account proliferation is inevitable.
Primary contact full name
This field establishes contractual and technical accountability. It is referenced in proposals, safety documentation and the final alignment report; leaving it blank would force engineers to hunt for a responsible party, adding days to the sales cycle.
Business email
The email is the primary conduit for delivering large drawings, compliance certificates and scheduling site surveys. A missing or invalid address causes immediate bottlenecks and violates GDPR if follow-up marketing occurs without a verifiable consent trail.
I consent to data processing in accordance with the privacy policy
This checkbox is legally mandated under GDPR and similar frameworks. Making it mandatory prevents the vendor from storing or processing any personal data, ensuring zero-risk of regulatory penalties and reinforcing customer trust.
The current mandatory set is lean yet sufficient to create a valid, actionable lead without overwhelming the user. To maximize completion rates while preserving data quality, consider adding real-time validation (e.g., email domain check) and a visual progress indicator. Where technical data is critical for safety or compliance—such as hazardous-area classification or seismic requirements—implement conditional mandatory logic: if the user selects “Zone 1”, the subsequent classification field becomes required. This hybrid approach keeps the initial cognitive load low while still enforcing rigor at the exact moment it is needed.
Finally, review analytics quarterly: if any optional field (e.g., “Direct phone/mobile”) shows >70% abandonment when filled, consider making it mandatory only in late-stage re-engagement forms. This data-driven tuning will continuously balance the trade-off between rich technical data and form-completion velocity.
To configure an element, select it on the form.