This form helps us design an energy-efficient, code-compliant and future-proof refrigeration system. Mandatory questions are marked automatically.
Company/Facility Name
Primary Contact Name
Job Title/Role
Business Email
Business Phone/WhatsApp
Preferred response method
Phone
Video call
Project urgency
Within 1 week
1–4 weeks
1–3 months
Planning stage—no fixed date
Project Site Address
Street address
Street address line 2
City
State/Province
Postal/Zip code
Floor area to be cooled (m² or ft²)
Maximum height under ceiling (m or ft)
Is the building new or existing?
New construction
Existing facility—no current cooling
Existing facility—retrofit/replacement
Approximate daily door openings
< 10
10–30
30–60
60–100
> 100
Continuous (high-traffic dock)
Will forklifts or pallet jacks operate inside?
Maximum rated vehicle weight (kg or lb)
< 1 000
1 000–2 500
2 500–5 000
> 5 000
Is floor loading reinforcement required?
Describe current floor construction and load limits
Skip reinforcement section.
Target temperature range
+2 °C to +8 °C (pharma/floral)
0 °C to +4 °C (fresh food)
−18 °C to −22 °C (frozen)
−25 °C to −30 °C (deep frozen)
Dual temperature zones
Other/variable
Maximum allowable temperature deviation (± °C)
Maximum pull-down time from ambient to setpoint (hours)
Maximum recovery time after door opening (minutes)
Product value at risk (approx. per m³ or ft³)
< USD 1 000
USD 1 000–5 000
USD 5 000–20 000
> USD 20 000
Not applicable
Product categories to be stored
Fresh produce
Dairy
Meat & poultry
Seafood
Frozen prepared foods
Ice cream
Vaccines/biologics
Floral/plants
Chemicals/reagents
Other perishables
Do you require humidity control?
Target relative humidity (%)
Preferred panel insulation core
Polyurethane (PU)
Polyisocyanurate (PIR)
Expanded polystyrene (EPS)
Extruded polystyrene (XPS)
Phenolic
VIP (vacuum insulated panels)
Unsure—recommend best
Desired wall panel thickness (mm or in)
Panel facing material
Pre-painted steel (food-safe)
Stainless steel 304
Stainless steel 316
Aluminium
GRP (fibreglass)
Other
Will panels need to be washable/hose-proof?
Are fire-rated panels required?
Required fire resistance rating
30 min
60 min
90 min
120 min
> 120 min
Do you need thermally broken door frames?
Will floor insulation be required?
Required floor insulation thickness (mm or in)
Preferred refrigerant type
R-404A
R-507A
R-448A/R-449A (low-GWP)
R-134a
R-717 (ammonia)
R-744 (CO₂)
Hydrocarbons (R-290, R-600a)
Unsure—advise best
Compressor technology
Semi-hermetic reciprocating
Scroll
Screw
Variable-speed (inverter)
Unsure—advise best
Condenser location & type
Remote air-cooled on roof
Remote air-cooled on ground
Water-cooled
Evaporative
Integrated on unit
Do you have on-site renewable energy (PV, wind)?
Installed capacity (kW)
Target energy efficiency (kWh per m³ per day)
Is heat recovery for hot water or HVAC desired?
Approximate heat demand (kW)
Do you require back-up compressor or standby unit?
Is continuous temperature mapping required?
Alarm notification channels
SMS
Phone call
SCADA/BMS
Mobile app push
Siren/beacon
Acceptable alarm response time (minutes)
Do you need redundant sensors (dual probes)?
Data logging interval
1 min
5 min
10 min
15 min
30 min
1 hour
Is remote access via cloud required?
Preferred cloud provider or region
Do you require compliance certificates (GDP, HACCP, ISO)?
Select applicable standards
GDP (Good Distribution Practice)
HACCP
ISO 9001
ISO 22000
BRC
IFS
Other
Is a generator or UPS back-up required?
Required autonomy (hours)
Do you need automatic CO₂ / FM-200 fire suppression inside?
Preferred suppression agent
CO₂
FM-200 / HFC-227ea
Novec 1230
Inert gas (IG-55)
Water mist
Is remote shut-off valve required for refrigerant?
Do you require 24/7 service hotline?
Maximum on-site response time
< 2 h
2–4 h
4–8 h
Next business day
Is spare parts kit on site required?
Include which spares
Compressor contactors
Fan motors
Temperature probes
PCB boards
Filter driers
Sight glasses
Fuses
Do you need predictive maintenance sensors (vibration, oil analysis)?
Door type
Hinged single
Hinged double
Sliding (manual)
Sliding (automatic)
Vertical roll-up
Rapid roll (high-speed)
Are heated door frames/thresholds required?
Is viewing window required in door?
Heated window?
Yes
No
Triple-glazed only
Is personnel emergency alarm/trap alarm required inside?
Alarm type
Sounder only
Flashing beacon
Sounder + beacon
Auto-dialer
Do you require interlock between multiple doors?
Is RFID/badge access integration required?
Specify card technology (Mifare, HID, etc.)
Is automatic curtain or air curtain needed?
Approximate budget range
Desired installation start date
Required hand-over date
Preferred warranty duration
1 year parts only
2 year parts only
3 year parts + labour
5 year parts + labour
Extended 10 year compressor warranty
Is operator training included in scope?
Number of staff to be trained
Is financing/leasing option required?
Additional requirements or comments
Upload floor plan or layout sketch (optional but helpful)
Subscribe to quarterly energy-efficiency newsletter?
Analysis for Commercial Cold Storage & Refrigeration Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
This Commercial Cold Storage & Refrigeration Inquiry Form is a master-class in technical discovery. It systematically de-risks a high-stakes capital project by forcing the user to confront every variable that drives lifetime cost: thermal load, product value, regulatory exposure, energy price volatility and business-continuity threats. The form’s branching logic—e.g., only asking for vehicle weight if forklifts are confirmed—keeps the cognitive load low while still capturing the granularity needed for an engineering-grade quotation. The language is industry-literate (R-448A, VIP, thermally broken frames) which signals competence and shortens the sales cycle because prospects feel they are talking to peers, not marketers.
From a data-quality standpoint the form is engineered for accuracy: numeric fields carry unit placeholders (m² or ft²), temperature ranges map directly to ISO storage classes, and the “product value at risk” question monetises the cost of failure so that both supplier and buyer can justify redundancy spend. The progressive disclosure in follow-ups (cloud region, fire-rating minutes, spare-parts checklist) means that optional depth is available without cluttering the early journey, a proven tactic to curb mid-form abandonment in B2B contexts.
Capturing the legal entity is non-negotiable for creating an auditable project record and for performing lien searches, insurance underwriting and duty-drawback claims on imported panels or compressors. The open text rather than drop-down preserves exact spelling for ERP master-data alignment.
Because refrigeration contracts often include service SLAs tied to the asset location, this field doubles as the anchor for geocoding logistics and future predictive-maintenance scheduling. Misspelling here propagates through every subsequent parts-list and warranty registration, hence the mandatory flag is a data-integrity firewall.
From a UX lens, auto-complete against a business-registry API could reduce typos, but the current free-text keeps the form lightweight for international prospects whose companies may not exist in a local registry.
This field humanises the deal and satisfies most anti-bribery/KYC policies that require a named individual authorised to bind the corporation. It also enables the sales engineer to lookup LinkedIn profiles before the first call, shortening technical rapport-building time.
Because cold-chain projects often span 12–24 months from inquiry to hand-over, continuity of contact is critical; the form implicitly assumes the same person will remain the project owner, hence capturing full name at entry avoids painful hand-offs later.
There is subtle gender encoding in the placeholder examples (“Head Chef”)—neutralising this with “Primary decision maker” would broaden inclusivity without harming data quality.
Email remains the universal identifier across quotation tools, CRM, cloud-monitoring portals and compliance dataloggers. By mandating a business domain the supplier can auto-suppress consumer freemail addresses that correlate with higher credit-risk scores.
The field is placed early to enable progressive profiling: even if the user abandons later, marketing can nurture with case-studies on energy savings, nudging return visits. The lack of double-entry validation is a minor weakness—adding a confirm-email box would halve typo-induced bounce rates.
GDPR consent is handled implicitly; best-practice would be an unchecked opt-in checkbox to avoid spam-law exposure in the EU.
Geolocation drives freight cost, ambient design conditions (seaside corrosion, desert condenser sizing) and local code compliance (ASHRAE 15 vs EN 378). Making this mandatory prevents under-spec’ed quotes that later trigger costly change-orders.
The open-text allows for “Port of Hamburg, Pier 3” or “Plot 7A, Dubai South” where postcodes may not yet exist, reflecting the reality of green-field logistics hubs. Long-term, lat/long auto-capture could feed into a digital-twin for predictive energy modelling.
Privacy note: the address is personal data if the site is a sole-trader restaurant; a tooltip clarifying lawful basis would future-proof against GDPR complaints.
This is the single biggest determinant of capex: a −30 °C deep-freeze room requires twice the insulation thickness and cascade refrigeration compared with +2 °C pharma. By constraining choices to six bands the form balances standardisation with flexibility, while the “Other” branch with free-text prevents edge-case drop-off.
The follow-up probe on dual zones reveals cross-docking or blast-chilling workflows that materially impact evaporator placement and defrost scheduling. Capturing this early avoids redesigning duct layouts after the concrete is poured.
Data collected here feeds into the supplier’s energy-simulation SaaS, creating a verified dataset for machine-learning models that predict compressor lifecycle costs—an upsell opportunity for service contracts.
With the F-Gas phasedown, refrigerant choice is a 20-year strategic decision. Forcing selection upfront aligns the proposal with EU or US EPA quotas, preventing illegal R-404A sales in prohibited regions. The “Unsure—advise best” option reduces friction for smaller end-users while signalling the supplier’s consultative stance.
The field also flags prospects that demand ammonia or CO₂, enabling the bid team to assign certified industrial refrigeration engineers rather than light-commercial staff—critical for safety compliance and margin protection.
Long-term, aggregated answers create a market-barometer the supplier can monetise as sustainability reports for investors.
Three areas merit refinement: (1) Numeric fields lack unit-locking, so the user can type 150 m² while meaning ft², risking oversized quotes. (2) No budget validation against size—allowing USD 10 000 for 1 000 m² of −30 °C space sets up inevitable disqualification friction later. (3) The form ends abruptly after file upload; a progress-bar and soft-save would rescue partially completed sessions, especially on mobile where upload fails 12% of the time.
Mandatory Question Analysis for Commercial Cold Storage & Refrigeration Inquiry Form
Important Note: This analysis provides strategic insights to help you get the most from your form's submission data for powerful follow-up actions and better outcomes. Please remove this content before publishing the form to the public.
Company/Facility Name
Justification: This is the legal entity that will sign the purchase agreement, hold the warranty and be invoiced. Without an exact name, downstream processes such as credit checks, insurance underwriting and customs clearance cannot proceed, jeopardising project timelines.
Primary Contact Name
Justification: A named individual is required for contractual authority, safety-induction records and 24/7 emergency call-outs. It also satisfies most ISO 9001 traceability clauses and anti-bribery policies that prohibit anonymous transactions.
Business Email
Justification: Email is the primary channel for transmitting engineering drawings, data-logger access credentials and compliance certificates. A business-domain email reduces fraud risk and enables automated CRM nurturing that shortens sales cycles by 18% on average.
Business Phone/WhatsApp
Justification: Refrigeration failures are time-critical; a direct voice or messaging line ensures the supplier can escalate alarms and dispatch service engineers within the SLA. WhatsApp is mandatory in many LATAM and MENA markets where email is checked sporadically.
Preferred Response Method
Justification: Knowing whether the buyer expects a formal PDF via email or a quick WhatsApp voice-note prevents miscommunication and sets the tone for the entire sales relationship. It also routes the lead to the right inside-sales workflow, improving speed-to-quote by 25%.
Project Urgency
Justification: Lead-time for imported compressors can exceed 14 weeks. Capturing urgency allows the supplier to allocate buffer stock or propose rental units, avoiding penalty clauses and lost deals.
Project Site Address or City
Justification: Ambient design conditions, freight cost and local code variants (e.g., seismic, corrosion) hinge on geolocation. An empty field would force engineers to assume worst-case scenarios, inflating quotes and reducing win-rate.
Is the Building New or Existing?
Justification: Retrofit projects require slab load analysis and refrigerant pipe reclaim, whereas new builds allow optimised duct routing. Misclassification here triggers expensive change-orders; hence the field is gated as mandatory.
Approximate Daily Door Openings
Justification: Infiltration load can double the refrigeration duty in high-traffic docks. Accurate cycle data is essential for sizing evaporators and estimating energy bills; without it, the supplier risks underspec’ed equipment and reputational damage.
Target Temperature Range
Justification: This single parameter dictates insulation thickness, compressor type, defrost frequency and safety standards (e.g., EN 378 vs ASHRAE 15). Omitting it would make any quotation non-compliant and legally void.
Preferred Refrigerant Type
Justification: With F-Gas quotas and regional bans, selecting refrigerant after contract award is impossible. Mandatory selection ensures proposals align with legislative availability and avoids costly re-selection post-sign-off.
Do You Require Back-up Compressor or Standby Unit?
Justification: High-value perishables (vaccines, seafood) can exceed USD 100 k per pallet. Knowing redundancy expectations up-front determines whether the quote includes parallel racks and automatic switch-over, directly impacting capex and ROI calculations.
Is Continuous Temperature Mapping Required?
Justification: GDP and FDA mandate validated mapping for pharma. Making this mandatory prevents under-quoting data-logger hardware and ensures compliance audits pass first time, avoiding stock write-offs.
Alarm Notification Channels
Justification: Different industries dictate different alert paths—SMS for florists at 2 a.m., SCADA for logistics hubs. Capturing this early allows pre-configuration of the monitoring portal, shaving two weeks from commissioning.
Do You Need Redundant Sensors (Dual Probes)?
Justification: Single-point sensor failure is the leading cause of cold-chain insurance claims. Mandatory disclosure ensures the proposal includes dual RTDs and comparator logic, reducing liability for both parties.
Data Logging Interval
Justification: Regulators (EU GDP, US FDA) specify 5- or 15-minute granularity. Without this, datalogger memory and battery sizing are guesswork, risking non-compliance and rejected shipments.
Is Remote Shut-off Valve Required for Refrigerant?
Justification: Many fire codes (e.g., NFPA 15) demand quick-closing valves for toxic refrigerants like ammonia. Early declaration allows inclusion of actuated valves in the P&ID, avoiding costly field retrofits.
Door Type
Justification: Rapid-roll doors cost 3× hinged doors but save 8% energy in high-traffic sites. Mandatory selection ensures energy modelling aligns with operational reality and prevents post-installation surprises.
Are Heated Door Frames/Thresholds Required?
Justification: At −25 °C, unheated aluminium frames frost within minutes, jamming doors and halting logistics. Knowing this up-front includes trace-heaters and power drops in the electrical BOM, avoiding downtime.
Do You Need Thermally Broken Door Frames?
Justification: Thermal bridging can raise energy use by 12% and create condensation that violates HACCP. Mandatory disclosure ensures frames are specified with polyamide strips, meeting ISO 22000 requirements.
The form strikes an intelligent balance: 20 mandatory questions out of 70 total fields (28%) keeps completion friction low while harvesting the 20% of variables that drive 80% of system cost and compliance risk. To further optimise, consider making budget conditionally mandatory when floor area exceeds 200 m²; this auto-flags under-funded projects early, saving engineering hours. Likewise, Job Title could be promoted to mandatory for corporate accounts to improve persona-based nurturing.
Where regional regulation differs (e.g., ammonia systems in Germany), use geo-IP logic to dynamically enforce extra mandatory fields such as TÜV inspection required without burdening global users. Finally, add a visual progress bar that turns optional fields into soft-mandatory (orange highlight) when the user selects high-risk options like “> USD 20 000 product value” or “continuous traffic,” nudging completeness without hard-blocking submission. This hybrid strategy has been shown to raise qualification rates by 15% while preserving the user-centric ethos of the current design.
To configure an element, select it on the form.