This section captures critical equipment specifications, configuration details, and personnel qualifications. All information must match current physical labels and valid certification documents. Any discrepancies must be resolved before lift authorization.
Crane Type Classification
Mobile Hydraulic Crane
Crawler Crane
Tower Crane
Rough Terrain Crane
All-Terrain Crane
Ring Crane
Straddle Crane
Other Specialized
Describe specialized crane type and unique configuration:
Crane Manufacturer & Model
Crane Serial Number/Unit ID
Manufacture Year
Is this a tandem lift requiring multiple cranes?
How many cranes will be used in tandem configuration?
Maximum Rated Capacity (metric tons)
Current Configuration Rated Capacity (metric tons)
Maximum Boom Length (meters)
Current Boom Length Configured (meters)
Is auxiliary equipment installed (jib, fly, luffing)?
Specify all auxiliary equipment and length additions:
Upload Current Load Chart PDF for this exact configuration
Upload Crane Annual Inspection Certificate (within 12 months)
Primary Crane Operator Full Name
Operator Certification Number
Operator Certification Expiry Date
Total Hours Experience on This Specific Crane Model
Lift Director/Supervisor Name
Certified Master Rigger Name (if different from above)
Rigging Gear Inventory & Certification Status
Gear Type | Component ID/Serial | Working Load Limit (tons) | Last Inspection Date | Days Since Inspection | Certification Current? | ||
|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | ||
1 | Wire Rope Slings | WRS-001 | 50 | 1/15/2025 | 120 | Yes | |
2 | Alloy Shackles | AS-042 | 35 | 2/20/2025 | 85 | Yes | |
3 | Spreader Bar | SB-15T | 15 | 1/30/2025 | 105 | Yes | |
4 | |||||||
5 | |||||||
6 | |||||||
7 | |||||||
8 | |||||||
9 | |||||||
10 |
Are all rigging gear components within certification period?
List all expired components and replacement plan:
Critical ground conditions directly impact crane stability. Complete all fields based on geotechnical data, physical inspection, and engineered calculations. Any ground failure risk requires immediate halt and remediation before lift approval.
Primary Soil Classification at Setup Location
Compacted Gravel/Engineered Fill
Native Clay (Stiff to Very Stiff)
Native Clay (Soft to Medium)
Sandy Soil (Dense)
Sandy Soil (Loose)
Silt or Silty Clay
Rock/Shotcrete Surface
Unknown/Unverified
Describe mitigation measures for poor soil (e.g., soil stabilization, compaction):
Describe engineered surface and load transfer mechanism:
Has geotechnical engineer performed on-site soil investigation?
Upload Geotechnical Report
WARNING: Lift cannot proceed without verified soil classification. Arrange immediate geotechnical assessment.
Has recent precipitation or flooding affected the site?
Describe precipitation events, dates, and current moisture conditions:
Maximum Outrigger Reaction Force (tons)
Outrigger Float/Pad Length (meters)
Outrigger Float/Pad Width (meters)
Calculated Ground Bearing Pressure (tons per square meter)
Verified Soil Bearing Capacity (tons per square meter)
Is soil bearing capacity greater than calculated ground pressure with safety factor?
Describe ground improvement plan or outrigger extension configuration:
Safety Factor Applied (e.g., 2.5 for critical lifts)
Are outrigger pads made of engineered materials (steel, composite) or timber?
Describe timber quality, thickness, and layering arrangement:
Have underground utilities been located and cleared within outrigger radius?
List uncleared utilities and mitigation actions required:
Is there any evidence of voids, uncompacted fill, or subsurface anomalies?
Describe anomaly location, depth, and engineered remediation:
Upload Photo of Each Outrigger Pad Setup (4 corners minimum)
Upload Photo of Ground Surface Condition Around Full Crane Radius
Overall Ground Stability Confidence Level
Very Low - Do Not Proceed
Low - Requires Remediation
Moderate - Monitor Closely
High - Acceptable
Very High - Excellent
Precise load calculations are non-negotiable. Every component must be accounted for. Use engineered lift plans and verify all measurements. The crane's capacity must exceed total load weight by mandated safety factors at all boom angles and radii.
Weight of Primary Load (metric tons)
Load Description & Material Specification
Load Dimensions (L x W x H) and Center of Gravity Location
Is the load's center of gravity centrally located or offset?
Describe offset distance, direction, and special rigging required to maintain level lift:
Total Weight of All Rigging Gear Below Hook (tons)
Total Gross Load Weight (Load + Rigging)
Planned Boom Length for Lift (meters)
Planned Boom Angle (degrees from horizontal)
Maximum Radius During Load Travel (meters)
Crane Capacity at This Radius & Configuration (tons)
Calculated Safety Factor (Capacity/Gross Load)
Does safety factor meet or exceed project minimum (typically 1.5-2.0)?
Explain why lower safety factor is acceptable or describe configuration changes needed:
Will load be side-loaded or have non-vertical lift forces?
Describe side-loading scenario and engineered analysis of boom stress:
Multi-Stage Lift Plan - Critical Position Analysis
Lift Stage | Radius (m) | Boom Angle (deg) | Chart Capacity (t) | Gross Load (t) | Safety Factor | ||
|---|---|---|---|---|---|---|---|
A | B | C | D | E | F | ||
1 | Initial Pick | 15 | 65 | 180 | 120 | 1.5 | |
2 | Mid-Travel | 20 | 58 | 150 | 120 | 1.25 | |
3 | Final Set | 12 | 72 | 200 | 120 | 1.666666667 | |
4 | 0 | ||||||
5 | 0 | ||||||
6 | 0 | ||||||
7 | 0 | ||||||
8 | 0 | ||||||
9 | 0 | ||||||
10 | 0 |
Are there any capacity deductions for jib, fly, or special attachments?
List all deductions applied and final net capacity:
Upload Engineered Lift Drawing with Load Path & Radii
Upload Load Calculation Worksheet Signed by Qualified Person
Environmental hazards pose dynamic risks. Real-time weather data, comprehensive 360-degree sweeps, and calculated exclusion zones are mandatory. This section ensures all atmospheric and spatial hazards are identified, measured, and controlled before lift commencement.
Current Wind Speed at Ground Level (m/s)
Wind Speed at Maximum Load Height (m/s)
Maximum Allowable Wind Speed for This Lift (m/s)
Is current wind speed below maximum allowable with safety margin?
Describe hold plan and wind speed monitoring protocol until conditions improve:
Wind Gust Factor Applied
Are there any overhead power lines within boom radius +10m safety zone?
Specify voltage, minimum clearance distance, and power company notification status:
Are there other cranes, towers, or structures that could cause wind tunnel effects?
Describe potential wind acceleration zones and compensatory measures:
Overhead Obstacles Within Boom Path - Select All That Apply
None - Clear Path
Active Power Lines
De-energized Power Lines
Structural Steel Beams
Tower Crane Boom/Jib
Facade/Mast Climbing Work Platform
Temporary Lighting Towers
Communication Antennas
Other
Provide lockout/tagout verification number and electrical authority clearance documentation:
Describe obstacle type, location, and clearance distance:
Minimum Vertical Clearance to All Overhead Obstacles (meters)
Has a full 360-degree visual sweep been performed from operator perspective?
CRITICAL: Sweep must be completed before proceeding. Document all hazards.
Calculated Exclusion Zone Radius (meters)
Is exclusion zone barricaded with physical barriers and warning signage?
Describe barricade plan and timeline for installation before lift:
Are spotters assigned to monitor exclusion zone during lift?
Explain alternative monitoring protocol:
Communication Method Between Operator, Rigger, and Spotters
Dedicated Two-Way Radio (Reserved Channel)
Hand Signals (ASME B30 Standard)
Hardwired Communication System
Air Horns/Audible Signals
Multiple Redundant Methods
Is there a qualified signal person designated and identified?
Explain communication protocol and signal person qualifications:
Load Swing Radius During Travel (meters)
Are tag lines properly sized and rigged to control load rotation?
Describe load rotation control methodology:
Upload 360-Degree Site Panorama Photo from Crane Cab Height
Upload Photo of Exclusion Zone Barricade and Signage
Environmental Hazard Control Verification
Not Verified | Partially Verified | Fully Verified | |
|---|---|---|---|
Wind monitoring plan active | |||
Overhead obstacle clearance verified | |||
Exclusion zone secured | |||
Communication system tested | |||
Emergency stop protocol briefed |
Final authorization requires independent verification by both a Certified Master Rigger and Site Safety Manager. Each must physically inspect all elements. Electronic signatures constitute legal acknowledgment of accountability for safe lift execution. No lift may proceed without both signatures.
Has a pre-lift safety meeting been conducted with all personnel involved?
STOP WORK: Conduct mandatory pre-lift meeting covering roles, hazards, and emergency procedures before proceeding.
List All Personnel Attending Pre-Lift Meeting (Names & Roles)
Are all personnel briefed on specific hazards identified in this permit?
Describe hazard communication gap and corrective action:
Is emergency response plan activated and emergency services notified?
Specify emergency response staging location and contact numbers:
Is a stop work authority clearly assigned and understood by all?
Clarify stop work protocol and authority chain:
Are there any hold points or conditional approvals for this lift?
Specify hold point conditions and approval authority for each:
Certified Master Rigger Full Name
Master Rigger Certification Number
Master Rigger Physical Inspection Date/Time
Master Rigger Independent Verification of Critical Items
Crane configuration matches load chart | |
Ground conditions adequate | |
Load calculations verified | |
Rigging gear certified | |
Exclusion zone secured | |
Environmental hazards controlled |
Master Rigger: Do you approve this lift as safe to proceed?
Specify all deficiencies preventing approval:
Certified Master Rigger Digital Signature
Site Safety Manager Full Name
Safety Manager Professional Registration/Certification
Safety Manager Physical Inspection Date/Time
Safety Manager Independent Verification of Compliance
All personnel certified | |
Permit documentation complete | |
Hazard controls implemented | |
Emergency plan active | |
Regulatory requirements met |
Safety Manager: Do you authorize this lift under your safety plan?
Identify all safety plan violations or uncontrolled hazards:
Site Safety Manager Digital Signature
Final Lift Authorization Time
Permit Valid Duration (hours from authorization)
Is continuous monitoring required during lift execution?
Specify monitoring parameters (wind, ground, load drift) and frequency:
Upload Master Rigger Field Notes & Inspection Photos
Upload Site Safety Manager Audit Checklist
PERMIT VALIDITY: This permit is void if conditions change (weather, ground, personnel, equipment). Any change requires new permit issuance. Stop work immediately if unexpected hazards emerge. Authority to stop work rests with any team member.